Text
.
Entar=y
' " ' ~ ",."o, " '"*-
-==-
M h.
Operations
- l October 15, 1991 2CAN109110 U. S. Nuclear Regulatory Commission Document Control Desk Mail Stop P1-137 Washington, D.C.
20555
SUBJECT:
Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Monthly Operating Report Gentlemen:
The Arkansas Nuclect one - Unit 2 Honthly Operating Report (MOR) for September, 1991 is attached.
ThisfEport is submitted in accordance with ANO-2 Technical Specification 6.9.1.6.
Very truly yours,
'f p -
&Cn aames
. Fisicaro Director, Licensing JJi/SAB Attachment
\\
!W 911018013d 91 oy:30
/ /j Jk)
PDR ADOCK 05000368
/ 'b,#
l R
- ~.
~..... - - -.. - ~. - -....
1 U. S.i;NRC:
- =
J.
- ~
October-15, 1991-x.
Page 21 j
4 j
i i
- cc:
Mr. Robert D. Martin Regional. Administrator U. S. Nuclear Regulatory Commission s
Region IV d'
611 Ryan Plaza Drive Suite 1000 l
Arlington, TX 76011 NRC Senior Resident Inspector Arkansas Nuclear One - ANO-1 & 2 Number.1, Nuclear Plant Road
_Russellville, AR 72801
~
i.
Mr. Thomas W. Alexion NRR Project Manager, Region IV/ANO-1
[
'U. S.-Nuclear Regulatory Commission l
NRR Mail Stop-11-D=23 i
One White Flint North' 11555 Rockville P3ke
+
Rockville, Maryland 20852 i
Ms. Sheri Peterson l
-NRR Project Manager,-Region IV/ANO-2 4
U. S.= Nuclear Regulatory Commission i
NRR Mail Stop 11-D-23 One White Flint North-11555 Rockville Pike Rockville,: Maryland 20352 I
l l
r F
i m
i..
T s
3.
em v-
.,+w-w.
m l
OPERATING DATA REPORT DOCKET NO:
50-368 DATE:
October 1991 COMPLETED BY:M.
S. Whitt TELEPHONE:
(501) 9?4-5560 OPERATING STATUS 1.
Unit Names Arkansas Nuclear one - Unit 2 2.
-Reporting Period:
September 1-30, 1991 3.
Licensed Thermal Power (MWL):
2,815 4
Nameplate Rating'(Gross MWe): _942.57 5.
Design Electrical Rating (Net MW9):
912 6.
Maximum Dependable Capacity (Gross _MWe):
897 7.
Mcximum Dependable Capacity (Net MWe):
858 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Restricted.
If Any (Net NWe):
None 10.
Reasons For Restrictions.
If Any:
None MONTH YR-TO-DATE CUMULATIVE 11.
Hours-in Reporting Period....
720.0 6,551.0 100,943.0 12.
Number of Hours React-r was Critical.....................
720.0 5,273.8 75,884.5 13.
Reactor Reserve Shutdown Hours.......................,
0.0 0.0 1,430.1 14 Hours Generator On-Line......
720.0 5,131.0 74.124.8 15.
Unit Reserve Shutdown Hours 0.0 0.0 75.0 16.
Gross Thermal Energy Generated (MWH)........................
1,979,334.0 15,869,936.0 194,688,777.0 11 7.
Gross Electrical Energy 651,720.0
-4,578,275.0 64,007,521.0 Generated (MWH) 18.
Net Electrical _ Energy 622,272.0 4,362,100.0 60,868,638.0 Generated (MWH) 19.
Unit Servien Factor..........
100.0 78.3 73.4
~20 Unit Availability Factor.....
100.0 78.3 73.5
- 21. -
Unit Capacity Factor (Uaing MDC Net) 100.7 77.6 70.3 22.
Unit Capacity Factor 94.8 73.0 66.1 (Using DEC Net) 12.0 23.
Unit Forced Outage Rate 0.0 0.8 24.
Shutdowns Scheduled over Next f, Months (Type Date, and Duration of Each):
None 25.
If Shut Down At End of Report Period.
Estimated rate of Startup:
26.
Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
_m___ _. _ _. - _.... _
AVERAGE DAll.Y' UNIT POWER LEVt:L DOCKET NO:
5_0-368
. UNIT:
Two DATE:
October,__1991 s
COMPLETED BY: H. S. Whitt l
TELEPil0NE:
-jj0jl 964-5560 MONTII Sey_tember~1991 DAY AVERAGE DAILY POWER LEVEL (MWo-Net)
'l.'.............
880 2..............
880 3...............
879 4..............
880 5..............-
881 6..............
879 7...............
879 8..............
378 5.............. -877 10.............
d75 11.............
877-L 12.............
876 13............. -877 14.............- 877-15,.............
878 l
16.............
880 L
17-.............
884 l
18.............- 888 l
19.............
893 20'...
894 21.............
892 122'.............
891 23.............
891-
.24........
691 25.........
893 26.........,...
893 u
27.............
870 ll 644 Us
'643-30............. _811-AVGS:
864 l2 u
i EiSIRilCTION 1.
On' this format, list the average daily unit power level in MWe-Net for each
- day in report.ing month. Compute to the nearest wholn megawatt.
e, s
- -^
w
~ - -, - -.
m a
s-.
,e
.n 4
AnC MANTit!'l GPERATING REP 0h?
OPERATING
SUMMARY
SE1TEMER 1991 UN IT Tk'O The unit began the month operating at 100% full power.
At. 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> on the twenty-seventh, a powe r reduction was coranenced at the system dispatcher's request.
After bctng teleased from the dispatcher's power hold, the unit esce.iat-d 6 power and attained 100;; power at 1152 hours0.0133 days <br />0.32 hours <br />0.0019 weeks <br />4.38336e-4 months <br /> on the thirtieth. The unit operated at 100% pwer f or the remaind.ir of the
- month, i
F W
i4 us
,g j_
,,?
.3 i?, i i,t:
,i-t f;
1 ! '
{
i,
~
H i
r e
e e
G 1
v' c
p E
9 0
i n
e R
t e
nh U
c6r oc N
9 o
7 w
t 5
et r i t e(
t r
u t a s
e T
3 i
4 rnc cp nase e
6 ooe un ot nl c
t I
i r V 9 CiR di i aei r
n e
t ed tDcF u
f_
-6U b
. )
&ct r
c i
o 1
A n m
uf L)
S 3
o5 O l 0
e e
re ro R
5 s
v et t
rE e
0 N
p 5AOn4 u
e ws snoL n
oq nof(
a a
r C
.P P
Ii S
t st Y
- at r
?
reo '
I Gaep' OE LE t
ph e NM EN n
t eSR t
A TO e
i r i
TN FH n 'e bPyt) b E
LP od A
i rn2 i
KTEPE po
/
h rt e2' h
1ITMi mC N
xonv0 x
(> N A O r o
e EfEE1
' E 1UDCT C'
1_
m ma n
e 'e A
. r
.o t
sd
/
mcni' S
yo N
asot N
SC i c O
cct u I
Si ad T
t ue C
ll anR
.U1 e
.aami r
D9 e
duuotde E9 s
t onnt nah R1 nt r naauoot eno A
tMMACLO
.RR cep
/
e-EE ive N
3 d1 23459 WB LER 7_
OM i_
)
)
- . T n
n P
i i
? E a
a AS r
l l
7 o
p n
p SR t
x o
x NO f
c E
i E
WF oga
(
t t& n
(
O ne s
c o
DT diR 5
ee.i gi r
i_
TR ot rT
.rnt o
UO ht n u
ti a r)
HP t uw l r s nner n SE eh o i o eiivEi R
MSD a.
R ami a
T F e ratll I
c yT x a a p N
t ngr Ernx 1
U
nanor t oE enit oesi(
n mel at sit pt el anns r o
s ninuureire a
H ouif gecmeh 7
e s q a e e pid pt l'
.R eEHRROLAOO e-RABCDE 7GH n'
i c) 7 3 s r
A au
/
ro N
uH D(
1 7
d' e
3 l
e d u v
ed v
S ce I
rh oc FS 7
FS e
2
~
t 9
a 0
D 1
9 9
0 o
1 N
9 1
4 i'
]
ym~~-
~
~....-- ~. -
~.
- 3
- i
)..
r l
s DATE: September, 1991
- 1 e
(;
1 o
O",.,
REFUELING INFORMATION
's i
e.
N, 1.
Name of I'ncility:
Arhtilhas NuleAL.OnL:_ Unit 2-t -
q.;
//
Scheduled datn for next refueling shutdown. Shutdown f rom cycle 9 is.
.j j
n 2.
IMXgMd_fm._,3ygust l_Sd9%
)
[!i!
3.
deheduled date for restart followins; refueling. Octg;ber 6.1992 b_
4.
Will refueling or resumpt;un of operation that uter require a R'T technical specif { cation clmnao or other liennne mondmont?
If answer la yes, what,_ in gencial, will there be?
If an e r'in no,1has the l
pllF I
}
reloed f uel design and core configurntfor. bonn rnviewod by your Phnt fj Sa oty.E,viev Committen to determinn whether any unrevit.wed safety -
d P
questions aro associn*ed with the corn reload (Re?. 10 CIN Sedt. ion i;
~
$0.59)?
s
The Cy d e_10 Reload is currently,beinh l a""ed-p l'nknown.
l 5 3.,
Scheduled elateln)- for sul.mitting proposed licensieg act.lon and cupport'14-infornation. AptiI L 1992 i
in 6.
l e:po r t.cu t. licennfng considerationn associtted with refueling, e.g..
new
(
or dHferent. fetel design or supplier, unreviewed devign or performance L
analysis mothc+1, significant changes in fuel des';4n, new operdring.
ptocedures.
.N._o n._e
. ~ _ _
a
' ~ -4 7,
thei r'nmberMr fuel assemblics (a) in the core-and '(b) in thn spent fuel.
[e storago poo1.- a)
RJ._,,.. ___,.
50 ML _
e g
. 8.
.The present 11 con 9ed spant fuel pool storage capacity and the size of i
-any incrosso - Jn 1.tr.ensed storago capacity that has boon requested or is planned...in_ number of fwl assemblics.
k.
prount MM increase s-izo by 9 H
9.
Thh projeewd date of the lent refueling that can be dischargud to the l~
spent fuel _ pool assuminy, the present liconaed capacity, t
(
- DA'i t : ' 1'JM__
(Loss of fu11 core offlood cipability) y:
s
\\.