2CAN089505, Rev to 950404 Application for Amends to Licenses DPR-51 & NPF-6 Re RCP Flywheel Insps.Change Would Allow Util to Delay Ultrasonic Volumetric Exam of Flywheel for RCP 2P32A for One Cycle
| ML20091P722 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 08/25/1995 |
| From: | Yelverton J ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20091P725 | List: |
| References | |
| 2CAN089505, 2CAN89505, NUDOCS 9509010318 | |
| Download: ML20091P722 (3) | |
Text
.--.
Entergy OperCtion3,Inc.
1448 SR 333 -
" ENTERGY Ws' '
Jerry W. Yelverton We PmsdW
. Owens a
' August 25,1995 2CAN089505 '
U. S. Nuclear Regulatory Commission
+-
Document Control Desk Mail Station P1-137 -
Washington, DC 20555
Subject:
Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Revised Technical Specifications Change Request Regarding Reactor Coolant Pump Flywheel Inspections Gentlemen:
)
On April 4,1995, Entergy Operations submitted proposed technical specification (TS)
~
changes (0CAN049504) which would delete the requirements for inservice inspections (ISI) of reactor coolant pump (RCP) flywheels at Arkansas Nuclear One, Unit 1 (ANO-1), and Arkansas Nuclear One, Unit 2 (ANO-2). These changes were submitted as a lead plant submittal for the Combustion Engineering Owners Group since the changes were determined to be generic to all pressurized water reactors with TS requirements for ISI ofRCP flywheels.
Since our initial submittal, the staff has communicated that the generic implications of the total deletion of these inspections could not be resolved prior to the next scheduled flywheel inspection'(ANO-2 refueling outage 2R11). Therefore, in order to obtain relief for the next inspection, the attached change is submitted for your review and approval. This change would allow Entergy Operations to delay the ultrasonic volumetric examination of the ilywheel for RCP 2P32A for one cycle. Becauu this change is more conservative than the entire deletion of all flywheel examinations proposed in our April 4,1995, submittal, the
~
discussions and no significant hazards determination included in the original submittal remain bounding.
. Entergy Operations requests that the effective date for this proposed change be within 30 days ofissuance of the amendment to allow for distribution and procedural revisions necessary to i-
~ implement the change. Although this request is neither exigent nor emergency, your prompt review is requested prior to 2R11, which is scheduled to begin on September 22,1995.
j.
e l'
9509010318:950825
~
'PDR. ADOCK 05000313-1l
~2a_ _.-. _.fDR __a t
q
U. S. NRC August 25,1995 2CAN089505 Page 2 Very trulyyours,
/
w JWY/jjd attachm'ents To the best of my knowledge and belief, the statements contained in this submittal are true.
SUBSCRIBED AND SWORN TO before me, a Notary Public in and for Oekwm County and the State of Arkansas, this h day of Quenal-
,1995.U 0
- n,m_
g7()
OFFCIAL SEAL vi JUANA M.TAPP Notary Publi e m punto. - m My Commission Expires ll-? -9&90 cc:
Mr. Leonard J. Callan Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 Mr. George Kalman NRR Project Manager Region IV/ANO-1 & 2 U. S. Nuclear Regulatory Commission NRR Mail Stop 13-H-3 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Ms. Greta Dicus Arkansas Department ofHealth Division ofRadiation Control and Emergency Management 4815 West Markham Street LittleRock, AR72205
4 1
1 a
e PROPOSED ANO-2 TECHNICAL SPECIFICATION CHANGES 1
4 I
J 4
t
-. - -