Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4710 Mark A. Giles Manager, Licensing Arkansas Nuclear One 2CAN081004 August 26, 2010 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Confirmation of Submittal of Additional Optimized ZIRLO' Data Arkansas Nuclear One, Unit 2 Docket No. 50-368 License No. NPF-6

REFERENCES:

1. Entergy Letter to the NRC dated April 24, 2007, License Amendment Request to Allow the Use of Optimized ZIRLO' Fuel Rod Cladding
2. NRC Letter to Entergy dated March 26, 2008, Issuance of Amendment RE: Use of Optimized ZIRLO' Fuel Rod Cladding (TAC No. MD5377)
3. Westinghouse Letter to the NRC dated December 30, 2008, SER Compliance of WCAP-12610-P-A & CENPD-404-P-A Addendum 1-A Optimized ZIRLO'
4. Entergy Letter to the NRC dated January 15, 2009, Confirmation of Submittal of Additional Optimized ZIRLO' Data
5. Westinghouse Letter to the NRC dated July 26, 2010, SER Compliance of WCAP-12610-P-A & CENPD-404-P-A Addendum 1-A Optimized ZIRLO'

Dear Sir or Madam:

Entergy Operations, Inc. (Entergy) requested that the Technical Specifications for Arkansas Nuclear One, Unit 2 (ANO-2) be amended to include the use of Optimized ZIRLO' for fuel rod cladding (Reference 1). Reference 2 provides the approval of the requested change.

As part of the amendment, the ten conditions listed in the NRCs final Safety Evaluation Report (SER) for Addendum 1 to Topical Report WCAP-12610-P-A and CENPD-404-P-A, Optimized ZIRLO' were addressed. Conditions 6 and 7 required Entergy to ensure that Westinghouse fulfilled a commitment to provide the NRC with data from the Optimized ZIRLO' Lead Test Assembly (LTA) programs at other facilities. As noted in Reference 1, Westinghouse provided the requested information for the first cycle prior to ANO-2 using the cladding material for the first time. Entergy committed to confirm that Westinghouse provides the additional

2CAN081004 Page 2 of 2 confirmatory data prior to subsequent cycles. The commitment continues until the average assembly burnup from the LTA program reaches the licensed average fuel rod burnup limit (60 GWD/MTU).

The purpose of this letter is to confirm that Westinghouse has continued to provide the requested information. Reference 5 provides additional information from the LTA programs in compliance with Conditions 6 and 7 of Section 5.0 of the SER related to the Optimized ZIRLO' Topical Report WCAP-12610-P-A and CENPD-404-P-A Addendum 1-A. With this additional information, the appropriate models remain applicable for Optimized ZIRLO' for three cycles of operation.

Because the data provided in Reference 5 covers three cycles of operation and includes data beyond the 60 GWD/MTU burnup limit, compliance with the aforementioned SER conditions is considered complete.

This submittal does not include any new commitments.

If you have any questions or require additional information, please contact me.

Sincerely, Original signed by Mark A. Giles MAG/dbb cc: Mr. Elmo E. Collins Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam MS O-8B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Bernard R. Bevill Arkansas Department of Health Radiation Control Section 4815 West Markham Street Slot #30 Little Rock, AR 72205