2CAN050503, License Renewal Clarification, Arkansas Nuclear One - Unit 2
| ML051310235 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 05/02/2005 |
| From: | James D Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 2CAN050503, TAC MBB402 | |
| Download: ML051310235 (4) | |
Text
_-
.Entergy Operations, Inc.
flnIt g)/'
Russeliville, AR 72802 Tel 501 858 5000 2CAN050503 May 2, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
License Renewal Clarification TAC No. MB8402 Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6
Dear Sir or Madam:
Section B.1.4 of the Arkansas Nuclear One, Unit 2 (ANO-2) License Renewal Application describes the Buried Piping Inspection Program. With respect to the ANO-2 Buried Piping Inspection Program upon entering the period of extended operation, Entergy will perform an inspection within ten years, unless an opportunistic inspection occurred within this ten-year period.
The new commitment contained in this submittal is summarized in the attachment. Should you have any questions concerning this submittal, please contact Ms. Natalie Mosher at (479) 858-4635.
I declare under penalty of perjury that the foregoing is true and correct. Executed on May 2, 2005.
Sincerely Dale.
James Act g Director, Nuclear Safety Assurance J/nbm Attachment
2CAN050503 Page 2 cc:
Dr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Drew Holland Mail Stop 0-7 DI Washington, DC 20555-0001 U. S. Nuclear Regulatory Commission Attn: Mr. Greg Suber Mail Stop 0-11 F1 Washington, DC 20555-0001 Mr. Bernard R. Bevill Director, Division of Radiation Control and Emergency Management Arkansas Department of Health 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867
Attachment to 2CAN050503 List of Regulatory Commitments
Attachment to 2CAN050503 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
TYPE SCHEDULED ONE-ckOne)
COMPLETION TIME CONTINUING DATE COMMITMENT ACTION COMPLIANCE (If Required)
With respect to the ANO-2 Buried Piping X
Prior to Inspection Program upon entering the July 17, 2018 period of extended operation, Entergy will perform an inspection within ten years, unless an opportunistic inspection occurred within this ten-year period.