OPERATING DATA REPORT DOCKET NO:
50-368 DATE:
March 1988 COMPLETED BY:0. F. Harrison TELEPHONE:
(501) 964-3743 OPERATING STATUS 1.
Unit Name:
Arkansas Nuclear One - Unit 2 2.
Reporting Period:
March 1-31, 1988 3:
Licensed Thermal Power (MWt):
2,815 4.
Nameplate Rating (Gross We):
942.57 5.
Design Electrical Rating (Net We):
912 6.
Maximum Dependable Capacity (Gross MWe): 897 7.
Maximum Dependable Capacity (Net HWe):
858 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Restricted.
If Any (Net MWe):
None 10.
Reuons For Restrictions.
If Any:
None MONTH YR-TO-DATE CUMULATVE 11.
Hours in Reporting Period....
WO 2,184.0 70,272.0 12.
Number of Hours Reactor was Critical.....................
0.0 1,027.6 50,749.7 13.
Reactor Reserve Shutdown Hours........................
0.0 0.0 1,430.1 14.
Hours Generator On-Line......
- 0. 0 1,027.5 49,420.9 15.
Unit Reserve Shutdown Hours..
0.0 0.0 75.0 16.
Gross Thermal Energy Generated (MWH)........................
0.0 2,816,266.0 127,673,777.0 17.
Gross Electrical Energy Generated (MWH)..............
0.0 939,120.0 41,,939,456.0 18.
Net Electrical Energy Generated (MWH)..............
-1,918.0 893,875.0 39,853,875.0 19.
Unit Service Factor..........
0.0 47.0 70.3 20.
Unit Availability Factor.....
0.0 47.0 70.4 21.
Unit Capacity Factor (Using MDC Net)..............
-0.3 47.7 66.1 22.
Unit Capacity Factor (Using DER Net)..............
-0.3 44.9 62.2 23.
Unit Forced Outage Rate......
0.0 0.0 14.4 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25.
If Shut Down At End of Report Period.
Estimated Date of Startup:
May 2, 1988 26.
Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERATION 1
- These numbers have been corrected to reflect correction of mathematical errors in the switchboard log.
/LW
/\\<l 8804250341 880331
(
PDR ADOCK 05000368 R
DCD i
L
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:
50-368 UNIY:
Two DATE:
March, 1988 COMPLETED BY: D. F. Harrison TELEPHONE:
(501) 964-3743 MONTH March, 1988 DAY AVERAGE DAILY POWER LEVil (MWe-Net) 1.............
-3 2.............
-3 3.............
-2 4.............
-2 5.............
-2 6.............
-2 7.............
-2 8.............
-2 9.............
-2 10............
-3 11............
-2 12............
-2 13............
-3 14............
-3 15............
-2 16............
-1 17............
-3 18............
-3 19............
-3 20............
-3 21............
-3 22............
-3 23............
-3 24............
-3 25............
-3 26............
-3 27............
-3 28............
-4 29............
-3 30............
-3 31............
-3 AVGS:
-3 INSTRUCTION On this format, ?ist the average daily unit power level in MWe-N3t for each day in reporting month.
Compute to the nearest whole megawatt.
NRC MONTHLY OPERATING REPORT OPERATING
SUMMARY
MARCH 1988 UNIT TWO Unit Two was off line the entire month of March for refueling and maintenance.
i l
l I
t I
.=.
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT FOR MARCH, 1988 DOCKET NO.
50-368 UNIT NAME ANO Unit 2 DATE March, 1988 COMPLETED BY D. F. Harrison TELEPHONE 501-964-3743 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.
Date Type (Hours)
Reason 2 Down Reactor 3 l
Report #
Code 4 Code 5 Prevent Recurrence,
88-01 03/01/88 5
744 C
1 NA ZZ ZZZZZZ
' Unit shutdown for refueling and maintenance 1
2 3
4 l
F:
Forced Reason:
Method:
Exhibit G - Instructions S:
Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Continuation 1022)
E-Operator Training &
5-Load Reduction License Examination 9-Other 5
i F-Administrative Exhibit I - Same Source G-Operational Error (Explain)
H-Other (Explain) e 9
e e
O u
r DATE: March, 1988 REFUELING INFORMATION 1.
Name of facility:
Arkansas Nuclear One - Unit 2 2.
Scheduled date for next refueling shutdown.
September 1989
- 3. -
Scheduled date for restart following refueling.
May 1988 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If answer is yes, what, in general, will there be? If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?
Yes (see paragraph 5).
Reload fuel design and core configuration review is under way.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
Technical Specification chance requests needed for cycle 7 startup have been approvec.
6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
A debris resistant, extended solid end cap design will be used in the Fresh Fuel batch for cycle 7.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool, a) 177 b) 357 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies, present 988 increase size by 0 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
DATE:
1999 (Loss of fullcore offload capability)
o PROMPT DISTRIBUTION o
^
(Mail Personnelt Please distribute as indicated by /, below.)
Sally Benson - Chron File (TCBYT-19)
- 8. Cocanougher (MO)
Bill Eaton (TCBYT 16)
Sharyn French (ANO)
George Jones (TCBYT 16)
Sherry Hendrix (TCBYT-19)
Ronnie Howerton (TCBYT-19)
David Hunter (TCBYT-22)
Dale James (TCBYT-19)
Bill Johnson (ANO - NRC Resident inspector)
Ralph Lally (MSS, New Orleans)
Jim Levine (AN0)
Jane Marsh (TCBYT-22)
Microfilm (TCBYT)
Debby Moore (ANO)
Charles Turk (TCBYT-19)
Al Vrape (TCBYT 19)
- Greta Dieus - Arkansas Department of Health
- George Dick - KRC
- G. W. Muench, SS!
O Licensee Event Rep _ orts Only 0
Security Related only Sally Benson (ICBYT-19)
Early Ewing (ANO)
T. Gene Campbell (TCBYT 19)
Horace Hollis (ANO)
Bill Converse (ANO)
Robert Cornell (Unit 2 O_n_ly) (LP&L)
William Craddock (TCBYT-19)
O Emergency Planning Reports. Outgoint letters only Early Ewing (ANO)
I M VanBuskirk (A @
V. W. Kessinger (TC3YT 19)
Hank Green (ANO)
Dan R. Howard (ANO)
Larry Humphrey (ANO)
Donald Lomax (ANO)
Jason Reser (ANO)
Patrick C. Rogers / Larry A. Taylor (ANO)
Steve Quennor (ANO)
David Snellings (TCBYT-19)
James Taylor-Brown (ANO)
Jimmy Vandergrift (ANO)
- Ted Cloninger - SERI
- Jim Green
- Charlie Tyrone SERI 1
C b rection Reports On J Sally Benson (TCBYT-19)
Gene Campbell (TCBYT-19)
Early Ewing (ANO)
W. V. Kessinger (TCBYT 19)
John Griffin (TCBYT 40)
Dan Howard (ANO)
Larry Humphrey (ANO)
Steve Quennoz (ANO)
David Snellings (TCBYT 19)
- Ted Cloninger - SERI
- Jan Green
- Nicholas Reynolds - Bishop, Cook, Purcell, & Reynolds
- Charite Tyrone SERI
- Outside mail - envelopes attached (Rev. 3/21/88)
' s ARKANSAS POWER & LIGHT COMPANY April 12, 1988 2CAN048807 g
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555
SUBJECT:
Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Monthly Operating Report Gentlemen:
The Arkansas Nuclear One - Unit 2 Monthly Operating Report for March, 1988 is attached.
Very truly yours, Mr Dan R. Howard Manager, Licensing DRH:MCS:lw Attachment l
cc:
U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 ATTN:
Mr. Robert D. Martin Regional Administrator U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 6
ATTN:
Mr. James M. Taylor, Director Office of Inspection and Enforcement 3 g
- AEveEA DANE 3OUTH UT4ttiES Sv8TESA
e 6
o ARKANSAS POWER & LIGHT COMPANY April 12, 1988 2CAN048807 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555
SUBJECT:
Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Monthly Operating Report Gentlemen:
The Arkansas Nuclear One - Unit 2 Monthly Operating Report for March, 1988 is attacheo.
Very tr,uly yours, Dan R. Howard Manager, Licensing DRH:MCS:1w Attachment cc:
V. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 ATTN:
Mr. Robert D. Martin Regional Administrator U. S. Nuclear Regulatory Commit,sion Document Control Desk Washington, DC 20555
,I6 ATTN:
Mr. James M. Taylor, Director Office of Inspection and Enforcement s(
MEMBEA MsOCM.E SOUTH UTIUTIES SYSTEM