2CAN038508, Draft Ltr Forwarding Listed C-E Documentation for Use in Conjunction W/Cycle 5 CPC Software Update,Per 841109 Description of Software Update & in Support of 850128 Tech Spec Change Request.W/O Encls

From kanterella
(Redirected from 2CAN038508)
Jump to navigation Jump to search
Draft Ltr Forwarding Listed C-E Documentation for Use in Conjunction W/Cycle 5 CPC Software Update,Per 841109 Description of Software Update & in Support of 850128 Tech Spec Change Request.W/O Encls
ML20100K109
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/21/1985
From: Enos J
ARKANSAS POWER & LIGHT CO.
To: John Miller
Office of Nuclear Reactor Regulation
Shared Package
ML20100K104 List:
References
2CAN038508, 2CAN38508, NUDOCS 8504120016
Download: ML20100K109 (2)


Text

_

ca.;

M March 21, 1985 2CANO38598 Director of Nuclear Reactor Regulation ATTN: Mr. James R.. Miller, Chief Operating Reactors Branch #3 Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 CPC Methodology Changes for Cycle 5 Additional Information Submittal Gentlemen:

Attached for your review are the following Combustion Engineering (CE) documents for use in conjunction with the AN0-2 Cycle 5 CPC software update.

A description of the software update was contained in CEN-288(A), submitted by our letter 2CAN118402 dated November 9, 1984.

This information is also in support of the Technical Specification change request submitted by our letter 2CAN018505 dated January 28, 1985.

CEN-296(A), "ANO-2 CPC and CEAC Data Base Listing", March 1985.

CEN-298(A), "ANO-2 CPC System Phase i Design Qualification Test Report", March 1985.

CEN-162(A),'"AN0-2 CPC/CEAC System Phase II Software Verification Test Report", March 1985.

Enclosure IP to A-CE-R-92, " Typical Data Base Constants for ANO-2", March 1985.

These documents are provided in response to additional information requests from your staff to assist in their review.

8504120016 850402 ADOCK 050 g 8 DR

c:

6 6k

-Mr. James R.' Miller 03/18/85 The respective CPC algorithms for ANO-2 Cycle 5 and the methodology used to generate the typical data base constants for AN0-2 Cycle 5 are identical to those reviewed by the NRC for San Onofre Nuclear Generating Station Units 2 cycle 2.

Due to the proprietary nature of the attached material, CE has requested that certain portions of these documents be withheld from public disclosure.

To accommodate this request five copies of both the proprietary (copies numbered 01-05) and nonproprietary versions are attached. An affidavit in support of.this determination is also provided.

Very truly yours, J. Ted Enos Manager, Licensing JTE/RBT/ac Attachments