2CAN018803, Monthly Operating Rept for Dec 1987

From kanterella
(Redirected from 2CAN018803)
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1987
ML20148S315
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 12/31/1987
From: Harrison D, Howard D
ARKANSAS POWER & LIGHT CO.
To: Bassett H
NRC, NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
2CAN018803, 2CAN18803, NUDOCS 8802030011
Download: ML20148S315 (6)


Text

v-OPERATIPG DATA REPORT DOCKET NO:

50-368 DATE:

December 1987 2

COMPLETED BY:D. F. Harrison TELEPHONE:

(501) 964-3743 OPERATING STATUS 1.

Unit Name:

Arkansas Nuclear One - Unit 2 2.

Reporting Period:

December 1-31,, 1987 3.

Licensed Thermal Power (Mdt):

2J 15 4.

Nameplate Rating (Gross Rde):

942.57 5.

Design Electrical Rating (Net Rde):

912 6.

Maximum Dependable Capacity (Gross MWe):

897 7.

Maximum Dependable Capacity (Net MWe):

858 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted.

If Any (Net MWe):

None 10.

Reasons For Restrictions.

If Any:

None MONTH YR-TO-DATE CUMULATVE 11.

Hours in Reporting Period....

744.0 8,760.0 68,088.0 12 Number of Hours Reactor was Critical.....................

744.0 7,715.4 49,722.1 13.

Reactor Reserve Shutdown Hours.......................

0.0 0.0 1,430.1 14.

Hours Generator On-Line......

744.0 7,681.7 48,393.4 15.

Unit Reserve Shutdown Hours..

U.0 0.0 75.0 16.

Gross Thermal Energy Generated (HWH)...

2,086,990.0 20,988,396.0 124,857,511.0 17.

Gross Electrical Energy Generated (HdH)..............

693,945.0 6,927,560.0 41,000,336.0 18.

Net Electrical Energy Generated (HJH)..............

663,853.0 6,605,895.0*

38,960,000.0*

19.

Unit Service Factor..........

100.0 87.7 71.1 20.

Unit Availability Factor.....

100.0 87.7 71.2 21.

Unit Capacity Factor (Using MDC Net)...........

104.0 87.9 66.7 22.

Unit Capacity Factor 1

(Using DER Net)..............

97.8 82.7 62.7 23.

Unit Forced Outage Rate......

0.0 12.3 14.7 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

A 72-day refueling outage is scheduled

+.o begin February 12, 1988.

I 25.

If Shut Down At End of Report Period.

Estimated Date of i

Startup:

26.

Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • These numbers have been corrected to reflect correction of mathematical errors in the switchboard log.

l 8802030011 871*31

M J

PDR ADOCK 05000368 R

PDR

'/'l

...~

AVERAGE DAILY UNIT POWER LEVEL DOCKET N0:

50-368 UNIT:

Two DATE:

December, 1987 COMPLETED 8Y: D. F. Harrison TELEPHONE:

(501L96,4-3743 MONTH December, 1987 OAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1.............

895 2.............

893 3.............

892 4.............

890 5.............

893 6.............

892 7.............

892 8.............

891 9

893 10........

894 11............

893 12............

893 13............

893 14............

893 15............

893 16............

892 17............

892 18............

889 19............

891 20............

891 21............

892 22............

892 23............

892 24............

890 25............

893 26............

893 27............

893 28............

893 29............

893 30............

892 31............

893 AVGS:

892 INSTRUCTION i

On this format, list the average daily unit power level in MWe-Net for each day in reporting month.

Compute to the nearest whole megaw.tt.

NRC MONTHLY OPERATING REPORT OPERATING

SUMMARY

DECEMBER 1987 UNIT TWO The unit operated at 100% power the entire month.

i J

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT FOR DECEMBER, 1987 DOCKET NO 50-368 UNIT NAME ANO Unit 2 DATE December, 1987 COMPLETED BY D. F. Harrison TELEPHONE 501-964-3743 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.

Date Type (Hours)

Reason 2 Down Reactor 3 l

Report #

Codei Code 5 Prevent Recurrence None 1

2 3

4 F:

Forced Reason:

Method:-

Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Continuation 1022)

E-Operator Training &

5-Load Reduction License Examination 9-Other 5

F-Administrative Exhibit I - Same Source G-Operational Error (Explain)

H-Other (Explain) e d

DATE: December, 1987 REFUELING INFORMATION l

1.

Name of facility:

Arkansas riuclear One - Unit 2 i

2.

Scheduled date for next refueling shutdown.

February 1988 3.

Scheduled date for restart following refueling.

May 1988 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? If answer is yes, what, in general, will there be?

If answer is no, has tile reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section

~

50.59)?

Yes (see paragraph 5).

Reload fuel design and core configuration review is under way.

5.

Scheduled date(s) for submitting proposed licensing action and 1

supporting information.

Technical Specification change requests have been submitted.

6.

Important licensing considerations associated with refueling, e.g., new l

or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating l

procedures.

A debris resistant, extended solid end cap design will be used in the i

Fresh Fuel batch for cycle 7.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool, a) 177 b) 289 i

8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is l

planned, in number of fuel assemblies, present 988 increase size by 0 f

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

OATE:

1999 (Loss of fullcore offload capability)

I

rw ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (501,377-4000 January 15,198/9 2CAN018803 U. S. Nuclear Regulatory Coninission Document Control Desk Washington, D.C.

20555 Attn: Mr. Harold S. Bassett, Director Division of Data Automation and Management Information

SUBJECT:

Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Monthly Operating Report

Dear Mr. Bassett:

The Arkansas Nuclear One - Unit 2 h nthly Operating Report for December 1987 is attached, Very truly your,

y an R.

ard Manag r, Licensing DRH:MCS:gf Attachment cc:

U. S. Nuclear Regulatory Coninission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlinoton, TX 76011 kd n

r tor g na g

U. S. Nuclear Regulatory Coninission Document Control Desk

' I Washington, DC 20555 ATTN: Mr. James M. Taylor, Director Office of Inspection and Enforcement MEMBE A MOOLE soutM utgitits systtM

-