Monthly Operating Rept for Nov 1986
ML20211P046
Person / Time
Site: Arkansas Nuclear 
Issue date: 11/30/1986
From: Enos J, Gobell J
ARKANSAS POWER & LIGHT CO.
To: Bassett H
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
1CAN128608, NUDOCS 8703020277
Download: ML20211P046 (6)


Text

F-O OPERATING DATA REPORT DOCKET NO:

50-313 DATE:

November 1986 COMPLETED BY:37 N. GoBell TELEPHONE:

(501)964-3251 OPERATING STATUS 1.

Unit Name:

Arkansas Nuclear One - Unit 1 2.

Reporting Period:

November 1-30, 1986 3.

Licensed Thermal Power (MWt):

2,568 4.

Nameplate Rating (Gross MWe):

902.74 5.

Design Electrical Rating (Net MWe):

850 6.

Maximum Dependable Capacity (Gross MWe):

883 7.

Maximum Dependable Capacity (Net MWe):

836 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted.

If Any (Net MWe):

None 10.

Reasons For Restrictions.

If Any:

None MONTH YR-TO-DATE CUMULATVE 11.

Hours in Reporting Period....

720.0 8,016.0 104,755.0 12.

Number of Hours Reactor was Critical.....................

0.0 5,464.7 71,128.0 13.

Reactor Reserve Shutdown Hours........................

0.0 0.0 5,044.0 14.

Hours Generator On-Line......

0.0 5,443.2 69,701.3 15.

Unit Reserve Shutdown Hours..

0.0 0.0 817.5 16.

Gross Thermal Energy Generated (MWH)........................

0.0 11,128,694.0 163,715,918.0 17.

Gross Electrical Energy Generated (MWH)..............

0.0 3,791,525.0 54,226,250.0 18.

Net Electrical Energy Generated (MWH)..............

-3,044.0 3,583,436.0 51,636,313.0 19.

Unit Service Factor..........

0.0 67.9 66.5 20.

Unit Availability Factor.....

0.0 67.9 67.3 21.

Unit Capacity Factor (Using MDC Net)..............

-0.5 53.5 59.0 22.

Unit Capacity Factor (Using DER Net)..............

-0.5 52.6 58.0 23.

Unit Forced Outage Rate......

0.0 7.8 14.2 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

ANO-1 is _ currently in the 1R7 refueling outage which began September 4, 1986 25.

If Shut Down At End of keport Period.

Estimated Date of Startup:

December 17, 1986 26.

Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY

/

COMMERCIAL OPERATION 8703020277 861130 l

{DR ADOCK 05000313

/

PDR

\\

=

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:

50-313 UNIT:

One DATE:

November, 1986 COMPLETED BY: J. N. GoBell TELEPHONE:

(501)964-3251

- MONTH _ November DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1.............

-4 2.............

~4 3.............

-4 4.............

-2 E.............

-4 5

-4 2............

-4 8............

-4 9.............

-5' 10............

-5 11............

-5 12............

-4 13............

-4 14............

-4 15............

-4 16............

-4 17............

-4

- 18............

-4 19............

-4 20............

-5 21............

-5 22............

-5 23............

-5 24............

-5

\\

25............

-4 26............

-4 27............

-4 l

28............

-4 29............

-4 30............

-4 l

31............

t t

AVGS:

-4 i

l l~

INSTRUCTION i

On this format, list the average daily unit power level in MWe-Net for each l

- day in reporting month.

Compute to the nearest whole megawatt.

l s

t

6 NRC MONTHLY OPERATING REPORT OPERATING SUW4ARY NOVEMBER 1986 UNIT ONE The unit remained shutdown the entire month of November for refueling and maintenance.

,..-,.,.__.4-n-y y.

y

i UNIT SHUTDOWNS'AND POWER REDUCTIONS REPORT FOR NOVEMBER, 1986 DOCKET NO

.50-313 UNIT NAME ANO Unit 1 i

DATE November, 1986 COMPLETED BY J. N. GoBell TELEPHONE (501)964-3251

+

Method of Licensee Cause & Corrective Duration Shutting

-Event System Component-Action to l

4 No.

Date Type (Hours)

Reason 2 Down Reactor 3 Report #

Code 4 Code 5 Prevent Recurrence 8609 11/01/86 S 720 C

1 N/A N/A N/A Continuation of j

refueling outage IR7.

l 1

2 3

4 i

F:

Forced Reason:

Method:

Exhibit G - Instructions S:

Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data l

B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Continuation 1022)

E-Operator Training &

5-Load Reduction i

License Examination 9-Other s

1 F-Administrative Exhibit I - Same Source G-Operational Error (Explain)

H-Other (Explain)

r.-

~

i J :-

. 1

' I DATES November 1986 REFUELING INFORMATION

.1.

Name of, facility:

Arkansas Nuclear One -' Unit 1 2.

. Scheduled date for-next refueling shutdown.

ANO-1 is currently in a refueling outage which began September 4, 1986.

3.

Scheduled.date for restart following refueling. - December 1986 4.

Will refueling or resumption of' operation thereafter require a

- technical specification change or other' license amendment? If answer.

is yes,' what, in general, will there be? ' If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?

Yes.

Reload Report and associated proposed Technical Specification.

change request.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

The Reload Report was submitted in September, 1986 and was approved by SER dated November 24, 1986.

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

None 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

a) 177 b) 448 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

fl present 968 increase size by 0 i:

L 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

DATE:

1998 r

i

- - - - - n e-e sw, n

,--n--

,a--

-w

-,-,--n,-,-,,,v,,,-,,-wew

-,-v-r-,-

-a

,-a-----

I O

e-ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 [501) 371-4000 December 11, 1986 1CAN128608 Mr. Harold S. Bassett, Director Division of Data Automation and Management Information Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C.

20555

SUBJECT:

Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Monthly Operating Report

Dear Mr. Bassett:

The Arkansas Nuclear One - Unit 1 Monthly Operating Report for November 1986 is attached.

Very truly yours,

. Ted Enos, Manager Nuclear Engineering and Licensing JTE:MCS:sg Attachment cc:

Mr. Robert D. Martin Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Mr. James M. Taylor, Director Office of Inspection and Enforcement

d. E. Nuclear Regulatory Commission Washington, DC 20555 9