1CAN128404, Monthly Operating Rept for Nov 1984

From kanterella
(Redirected from 1CAN128404)
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1984
ML20113G033
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 11/30/1984
From: Enos J, Morton K
ARKANSAS POWER & LIGHT CO.
To: Bassett H
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
1CAN128404, NUDOCS 8501240218
Download: ML20113G033 (6)


Text

p

=

A OPERATING DATA REPORT DOCKET NO:

50-313 DATE:

December 4, 1984 COMPLETED BY: K. L. Morton-TELEPHONE:

501-964-3115 OPERATING STATUS 1.

Unit Name:

Arkansas Nuclear One - Unit 1 2.

Reporting Period:

November 1-30, 1984 3.

Licensed Thermal Power (MWt):

2568 4.

Nameplate Rating (Gross MWe):

902.74 5.

Design Electrical Rating (Net MWe):

850 6.

Maximum Dependable Capacity (Gross MWe):

883 7.

Maximum Dependable Capacity (Net MWe):

836 8.

If Changes Occur.in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted.

If Any (Net MWe):

None 10.

Reasons For Restrictions.

If Any:

None MONTH YR-TO-DATE CUMULATVE 11.

Hours in Reporting Period....

750 8,040.0 87,235.0 12.

Number of Hours Reactor was Critical.....................

0.0 6,222.4 58,657.9 13.

Reactor Reserve Shutdown Hours.......................

0.0 0.0 5,044.0

14. Hours Generator On-Line......

0.0 6,153.3 57,403.5

15. Unit Reserve Shutdown Hours..

0.0 0.0 817.5 16.

Gross Thermal Energy Generated (MWH)........................

0.0 14,432,515.0 136,352,816.0 17.

Gross Electrical Energy Generated (MWH)..............

0.0 4,823,906.0 44,962,271.0 18.

Net Electrical Energy Generated (MWH)..............

0.0 4,604,135.0 42,862,523.0 19.

Unit Service Factor..........

0. 0 76.5 65.8 20.

Unit Availability Factor.....

0.0 76.5 66.7 21.

Unit Capacity Factor (Using MDC Net)..............

0.0 68.5 58.8

22. Unit Capacity Factor (Using DER Net)..............

0.0 67.4 57.8 l

23. Unit Forced Outage Rate......

0.0

. 1.2 14.6 l

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of' Each): ANO-1 is Presently shutdown for the IR6 refueling and maintenance which began October 12, 1894, and is scheduled to restart December 22, 1984.

-25.

If. Shut Down At End of Report Period.

Estimated Date of Startup:- December 22, 1984 26.

Units in Test Status (Prior to Commercial Operation):

Forecast Achieved o

INITIAL CRITICALITY INITIAL ELECTRICITY

~C0W1ERCIAL OPERATION 8501240218 841130 4

PDR ADOCK 05000313 Qrh R

PDR o

+

AVERAGE. DAILY UNIT POWER LEVEL.

DOCKET NO:

50-313 UNIT:

Une DATE:

December 4, 1984

-COMPLETED BY: Ken L. Morton TELEPHONE:

501-964-3115 MONTH November 1984 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

- 1.............

0 2.............

0 3.............

0 4.............

0 5.............

0 6.............

0 7.............

0

- 8.............

0 9.............

0 10_............

.0 11............

0 12............

0 13............

0 14............

0 15............

0

. 16............

0 17............

0 18............

0 19............

'O 20............

0 21............

0 22............

0 23............

0 24............

0 25............

-0 26.............

0 27............

0 28............

0-29............

0 30............

0 31............

INSTRUCTION

. On this -format, list the average daily unit power level. in Kle-Net for each day in reporting month.

Compute to the nearest whole megawatt.

t

NRC MONTHLY OPERATING REPORT OPERATING StMtARY NOVEMBER 1984 UNIT 1

'The unit remained shutdown for refueling outage IR6 throughout the month.

l r.-

c.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT FOR NOVEMBER 1984 DOCKET NO 50-313

~

UNIT NAME ANO Unit 1 DATE

. December 6, 1984 COMPLETED BY Ken Morton TELEPHONE (501) 964-3115 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.

Date Type (Hours)

Reason 2 Down Reactors Report #

Code 4 Code 5 Prevent Recurrence l

84-05 841012 5

720.0 C

1 N/A N/A N/A 1R6 refueling outage.

1 2

3 4

F:

Forced Reason:

Method:

Exhibit G - Instructions 5:

Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (MUREG-D-Regulatory Restriction 4-Continuation 0161)

E-Operator Training &

5-Load Reduction License Examination 9-Other 5

F-Administrative Exhibit 1 - Same Source G-Operational Error (Explain)

H-Other (Explain) e 9

0 g

r-DATE:

November 1984 REFUELING INFORMATION~

. 1.

Name of facility:

Arkansas' Nuclear One - Unit 1

2..

Scheduled date for next~ refueling shutdown.

0ctober 12, 1984 l-3.

Scheduled date for' restart following refueling.

December 22, 1984 1

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? If answer is yes, what, in general, will there be? If answer is no, has the reload fuel design and core configuration.been reviewed by your Plant i

Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?

l Yes, Reload Report and associated proposed Technical Specification cnange.

5.

Scheduled date(s) for= submitting proposed licensing action and supporting information.

September 26,.1984 1

6.

Important licensing considerations associated with refueling, e.g., new.

or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

Yes, the reload analysis will be done using newly developed thermal hydraulic codes.

Babcock & Wilcox will be submitting TO)ical Reports on the new codes for NRC review prior to September 1,1934.

7.

The number of fuel assemblies (a) in the core and (b) in~the spent fuel storage pool, a) 177

.b) 388 8.

The present licensed spent fuel pool storage capacity and.the size of

.any increase in licensed storage capacity that has been requested or=is.

. planned, in number of fuel-assemblies.

present 988 increase size by 0 9.

.The projected date of the last refueling that can be discharged to_the spent fuel pool assuming the present licensed capacity.:

DATE:

1998

+

4

r T

p ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (501) 371-4000 December 15, 1984 1CAN128404 Mr. Harold S. Bassett, Director Division of Data Automation and Management Information Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C.

20555

SUBJECT:

Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Monthly Operating Report (File:

0520.1)

Gentlemen:

Attached is the NRC Monthly Operating Report for November 1984 for Arkansas Nuclear One - Unit 1.

Sincerely, W

J. Ted Enos Manager, Licensing JTE:SAB:ds Attachment cc: Mr. Robert D. Martin Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, suite 1000 Arlington, TX 76011 Mr. Richard C. DeYoung Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 l l(

hh MEMEMER MCOLE SOUTH UTLmES SYSTEM