1CAN119306, Forwards Steam Generator Tubing ISI Rept for Eleventh Refueling Outage
| ML20059M005 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 11/12/1993 |
| From: | Yelverton J ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20059L721 | List: |
| References | |
| 1CAN119306, NUDOCS 9311180070 | |
| Download: ML20059M005 (2) | |
Text
.
Ent2rgy opercuons inc.
9 ENTERGY Z 72 ssm Tel501 M A 8688 Jerry W. Yelverton Vrc Preident owatn AND November 12,1993 1CAN119306 U. S. Nuclear Regulatory Commission Document Control Desk Mail Station PI-137 Washington, DC 20555 l
Subject:
Arkansas Nuclear One - Unit 1 Docket 'No. 50-313 License No. DPR-51 Once Through Steam Generator (OTSG) Inservice Inspection Repon l
l Gentlemen:
l Arkansas Nuclear One, Unit 1 (ANO-1) Technical Specification 4.18.6 requires the complete i
results of the inservice inspection of the OTSG tubes be submitted to the NRC within 45 days of the completion of the inspection. Attached is the Steam Generator Tubing Inservice Inspection Report for the ANO-1 eleventh refueling outage (IRll). The OTSG inspection was completed on October 1,1993.
The random sample inspections of the "A" and "B" OTSG had Category C-2 results. The lane region of the "A" OTSG had Category C-3 results while all other special inspection regions had Category C-1 or C-2 results. Attached are the complete results of the inspections of the OTSGs.
This report supplements the information provided to the NRC by letter dated October 6,1993 (ICAN109304), which was required to be submitted per Technical Specifications 4.18.6 and 6.12.5 as a result of the C-3 inspection results. The additional information requested during our telephone conversation on October 12,1993, and confirmed in the NRC letter approv'mg the C-3 report (ICNA109301 dated October 13,1993), is included in the attachment. This submittal completes the reporting requirements of Technical Specification 4.18.6 for 1R11.
160P"_
/ 3 V
l 9311180070 931112 l
PDR ADOCK 05000313 y%
G PDR l
1
8 U. S. NRC November 12,1993 1CANI19306 Page 2 Should you have any questions concerning this submittal, please contact me.
Very truly yours, l
i do=n id'~2l h
w
/
/
\\
/
JWY/JJD l
attachment l
cc:
hir. James L. hiilhoan Regional Administrator l
U. S. Nuclear Regulatory Commission l
Region IV l
611 Ryan Plaza Drive, Suite 400
[
Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One - ANO-1 & 2 Number 1, Nuclear Plant Road Russellville, AR 72801 1
l Mr. Roby B. Bevan, Jr.
NRR Project Manager Region IV/ANO-1 l
U. S. Nuclear Regulatory Commission i
NRR Mail Stop 13-H-3 i
One White Flint Nonh 11555 Rockville Pike l
Rockville, MD 20852 l
Mr. Thomas W. Alexion i
NRR Project Manager, Region IV/ANO-2 l
U. S. Nuclear Regulatory Commission l
NRR Mail Stop 13-H-3 One White Flint North 11555 Rockville Pike l
Rockville, MD 20852 i
l T
.