i 7

OPERATING DATA REPORT DOCKET NO:

50-313 DATE:

October, 1986 COMPLETED BY:J. N. GoBell TELEPHONE:

(501)964-3251 OPERATING STATUS

~

1.

Unit Name:

Arkansas Nuclear One - Unit 1 2.

Reporting Period: October 1-31, 1986 3.

Licensed Thermal Power (MWt):

2,568 4.

Nameplate Rating (Gross MWe):

902.74 5.

Design Electrical Rating (Net MWe):

850 6.

Maximum Dependable Capacity (Gross MWe):

883 7.

Maximum Dependable Capacity (Net MWe):

836 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted.

If Any (Net MWe):

None 10.

Reasons For Restrictions.

If Any:

None 1

MONTH YR-TO-DATE CUMULATVE q

11.

Hours in Reporting Period....

745.0 7,296.0 104,035.0 12.

Number of Hours Reactor was Critical.....................

0.0 5,464.7 71,128.0 13.

Reactor Reserve Shutdown Hours........................

0.0 0.0 5,044.0 14.

Hours Generator On-Line......

0.0 5,443.2 69,701.3 15.

Unit Reserve Shutdown Hours..

0.0 0.0 817.5 16.

Gross Thermal Energy Generated (MWH)........................

0.0 11,128,694.0 163,715,918.0 17.

Gross Electrical Energy Generated (MWH)..............

0.0 3,791,525.0 54,226,250.0 18.

Net Electrical Energy Generated (MWH)..............

-3,452.0 3,586,480.0 51,639,357.0 19.

Unit Service Factor..........

0.0 74.6 67.0 20.

Unit Availability Factor.....

0.0 74.6 67.8 21.

Unit Capacity Factor (Using MDC Net)..............

-0.6 58.8 59.4 22.

Unit Capacity Factor (Using DER Net)..............

-0.5 57.8 58.4 23.

Unit Forced Outage Rate......

0.0 7.8 14.2 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

ANO-1 is currently in the 1R7 Refuelina outage which began September 4, 1986 25.

If Shut Down At End of Report Period.

Estimated Date of Startup:

December 9, 1986 26.

Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

{- p C.}

8701290417 861031 PDR ADOCK 05000313 R

PDR

\\'I

/

~ AVERAGE DAILY UNIT POWER UEVEL DOCKET NO:

50-313 UNIT:

One DATE:

October, 1986 COMPLETED BY: J. N. GoBell TELEPHONE:

(501)964-3251 MONTH October DAY AVERAGE DAILY POWER LEVEL-(MWe-Net) 1.............

-5 2.............

-5 3.............

-5 4.............

-5 5.............

-5 6.............

-5 7.............

-5 8.............

-5 9.............

-5 10............

-5 11............

-6 12............

-5 13............

-4 14............

-4 15............

-4 16............

-4 17............

-4 18............

-4 19............

-4 20............

-4 21............

-4 22............

-5 23............

-5 24............

-5 25............

-5 i

26............

-4 27............

-4 28............

-4 29............

-4 30............

-4 31............

-4 AVGS:

-5 INSTRUCTION l

On this format, list the average daily unit power level in MWe-Net for each day in reporting month.

Compute to the nearest whole megawatt.

js' s

4 NRC MONTHLY OPERATING REPORT a

OPERATING

SUMMARY

i OCTOBER 1986 UNIT ONE r

The unit remained-shutdown the entire month of October for refueling and maintenance.

4 3

1

?

1 i

4 1

3 l

J 1.

i 1

.I

_.-.-..,m,_

_y,m-m r-,-... ~,

m._-,

,,y y.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT FOR OCTOBER, 1986 DOCKET NO 50-313 UNIT NAME ANO Unit 1 DATE October, 1986 COMPLETED BY J. N. GoBell TELEPHONE (501)964-3251 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.

Date Tyge (Hours)

Reason 2 Down Reactor 3 Report #

Code 4 Code 5 Prevent Recurrence l

8609 10/01/86 S 745 C

1 N/A N/A N/A Continuation of refueling outage 1R7.

1 2

3 4

F:

Forced Reason:

Method:

Exhibit G - Instructions S:

Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Continuation.

1022)

E-Operator Training &

5-Load Reduction License Examination 9-Other s

F-Administrative Exhibit I - Same Source G-Operational Error (Explain)

H-Other (Explain) e

m

[

DATE:

October, 1986 REFUELING INFORMATION 1.

Name of facility:

Arkansas Nuclear One - Unit 1 l2.

Scheduled date for next refueling shutdown.

ANO-1 ic currently in a refueling outage which-began September 4, 1086.

3.

Scheduled date for restart following refueling.

December 1986 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? If answer is yes, what, in general, will there be?

If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section

-50.59)?

Yes.

Reload Report and associated proposed Technical Specification change request.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

The Reload Report was submitted in September, 1986.

6.-

Important. licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

None 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

a) 177 b) 448 I

8.

The present licensed spent fuel pool storage capacity and the size of

(

any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

_present 968 increase size by 0 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.

DATE:

1998 1

i

7 0

6 J

ARKANSAS POWER & LIGHT COMPANY POST OFFICE DOX 551 LITTLE ROCK ARKANSAS 72203 (501) 271-4000 November 15, 1986 1CAN118608 Mr. Harold S. Bassett, Director Division of Data Automation and Management Information Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C.

20555

SUBJECT:

Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Monthly Operating Report

Dear Mr. Bassett:

The Arkansas Nuclear One - Unit 1 Monthly Operating Report for October 1986 is attached.

Very truly yours, g[

J. Ted E os, Manager Nucl ar Engineering & Licensing JTE:MCS:sg Attachment cc:

Mr. Robert D. Martin Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Mr. James M. Taylor, Director f

l Office of Inspection and Enforcement gjVj 1}\\,

U. S. Nuclear Regulatory Commission

'/

Washington, DC 20555 MEMBER MIDOLE SOUTH UTIUTIES SvSTEM