e e
OPERATING DATA REPORT DOCKET N0:
50-313 DATE:
April 1987 COMPLETED BY:J. N. GoBell TELEPHONE:
(501) 964-3251 OPERATING STATUS 1.
Unit Name:
Arkansas Nuclear One - Unit-1 2.
Reporting Period: April 1-30,1987 3.
Licensed Thermal Power (MWt):
2,568 4.
Nameplate Rating (Gross MWe):
902.74 5.
Design Electrical Rating (Net MWe):
850 6.
Maximum Dependable Capacity (Gross MWe):
883 7.
Maximum Dependable Capacity (Net MWe):
836 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Restricted.
If Any (Net MWe):
None 10.
Reasons For Restrictions.
If Any:
None MONTH YR-TO-DATE CUMULATVE 11.
Hours in Reporting Period....
719.0 2,879.0 108,378.0 12.
Number of Hours Reactor was Critical.....................
_719.0 2,653.8 73,853.6 13.
Reactor Reserve Shutdown Hours........................
0.0 0.0 5,044.0 14.
Hours Generator On-Line......
719.0 2,636.4 72,342.2
- 15. Unit Reserve Shutdown Hours..
0.0 0.0 817.5
- 16. Gross Thermal Energy Generated i
(MWH)........................
1,208,067.0 5,358,855.0 169,084,610.0 17.
Gross Electrical Energy Generated (MWH)..............
398,760.0 1,804,790.0 56,031,650.0
- 18. Net Electrical Energy Generated (MWH)..............
373,773.0 1,709,744.0 53,335,780.0 19.
Unit Service Factor..........
100.0 91.6 66.7
- 20. Unit Availability Factor.....
100.0 91.6 67.5
]
21.
Unit Capacity Factor (Using MDC Net)..............
62.2 71.0 58.9 22.
Unit Capacity Factor (Using DER Net)..............
61.2 69.9 57.9 23.
Unit Forced Outage Rate......
0.0 8.4 14.0 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
A 21s week maintenance outage is scheduled to begin October 16, 1987.
25.
If Shut Down At End of Report Period.
Estimated Date of Startup:
26.
Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8705280027 870430 PDR ADOCK 05000313 g7 R
PDR '
lI
(
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:
50-313 UNIT:
One DATE:
April 1987 COMPLETED BY: J. N. GoBell TELEPHONE:
(501) 964-3251 MONTH April 1987 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1.............
524 2.............
525 3.............
524 4.............
524 5.............
524 6.............
526 7.............
528 8.............
528 9.............
523 10............
522 11............
520 12............
523 13............
524 14............
524 15............
545 16............
545 17............
540 i
18............
519 19............
518 20............
518 21............
519 22............
519 23............
519 24............
519 25............
519 26............
519 27............
519 28............
500 i
29............
424 30............
515 31............
AVGS:
520 INSTRUCTION On this format, list the average daily unit power level in MWe-Net for each day in reporting month.
Compute to the r.earest whole megawatt.
l 1
NRC MONTHLY OPERATING REPORT OPERATING
SUMMARY
APRIL 1987 UNIT ONE Unit One began the month opera:ing at about 65% power for fuel conservation.
At 2209 hours0.0256 days <br />0.614 hours <br />0.00365 weeks <br />8.405245e-4 months <br /> on the twenty-eighth, power was reduced to 45% power due to a main feedwater pump trip.
The unit was returned to 65% power at 1217 hours0.0141 days <br />0.338 hours <br />0.00201 weeks <br />4.630685e-4 months <br /> on the twenty-ninth, where it remained for the remainder of the month.
.. - ~ _
J 1
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT FOR APRIL'1987 DOCKET NO 50-313 UNIT NAME
-ANO Unit 1 DATE April, 1987 COMPLETED BY.
J. GoBell TELEPHONE-501-964-3251 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.
Date M1 (Hours)
Reason 2 Down Reactor 8 Report #.
Code -
Codes Prevent Recurrence.
4
~
8708 04/28/87 F 0
A 9
N/A SJ P
Power was reduced due 3
to a main feedwater pump trip.
i c
1 2
3 4
F:
Forced Reason:
' Method:.
Exhibit G Instructions l
S:
Scheduled A-Equipment Failure.(Explain). 1-Manual-for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee 4
C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Continuation 1022)
E-Operator Training &
5-Load Reduction i
License Examination 9-Other 5
I
'F-Administrative Exhibit I - Same-Source G-Operational Error (Explain)
H-Other (Explain) i 4
1
'e O
e
-e.
a DATE:
April, 1987 REFUELING INFORMATION 1.
Name of facility:
Arkansas Nuclear One - Unit 1 l
~
2.
Scheduled date for next refueling shutdown.
September 1988 3.
Scheduled date for restart following refueling.
November 1988 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?.If answer is yes, what, in general, will.there be? If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?
Unknown at this time.
Cycle design has not-been finalized.
4 5.
Scheduled date(s) for submitting proposed licensing action ~and supporting information.
If necessary, May 1988.
6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
Zircaloy spacer grids, reconstitutable upper end fitting, gray axial power shaping rod assemblies, and "retainerless" assembly design.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool, a) 177 b) 448 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
present 968 increase size by 0 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
DATE:
1997 (Loss of fullcore offload capability) 4
\\
1 v-,
e-
..m>
1 0
E ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (501) 371-4000 May 15, 1987 1CAN058704 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Attn: Mr. Harold S. Bassett, Director Division of Data Automation and Management Information
SUBJECT:
Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Monthly Operating Report
Dear Mr. Bassett:
The Arkansas Nuclear One - Unit 1 Monthly Operating Report for April 1987 is attached.
Very truly yours,
. Ted Enos, Manager Nuclear Engineering and Licensing JTE:MCS:sg Attachment cc:
U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 ATTN:
Mr. Robert D. Martin Regional Administrator U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ATTN:
Mr. James M. Taylor, Director Office of Inspection and Enforcement MEMBER MIDDLE SOUTH UTIUTIES SYSTEM
-_, _