OPERATING DATA REPORT DOCKET NO. 50-313 DATE 5/15/83 COMPLETED BY K.L.Morton TELEPHONE Rn1/964 3115 OPERATING STATUS Notes Arkansas Nuclear One - Unit 1
- 1. Unit Name:
- 2. Reporting Period:
Aoril 1-30. 19R3
- 3. Licensed Thermal Power (MWt):
2568 902.74
- 4. Nameplate Rating (Gross MWe):
850
- 5. Design Electrical Rating (Net MWe):
883
- 6. Maximum Dependable Capacity (Gross MWe):
836
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr..to-Date Cumulatise 719.0 2879.0 73314.0
- 11. Hours In Reporting Perios -
- 12. Number Of Hours Reactor W:s Critical 56.4 56.4 48063.7 0.0 0.0 5044.0
- 13. Reactor Reserve Shutdown Hours 4.2 4.2 47061.7
- 14. Hours Generator On.Line 0.0 0.0 817.5
- 15. Unit Resene Shutdown Hours 20740.0 20740.0 111790554.0
- 16. Gross Thermal Er.ergy Generated (MWH) 358.0 358.0 36765402.0
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH) 170.0 170.0 35037980.
.6
- 1 64.2
- 19. Unit Senice Factor
.6
.1 65.3
- 20. Unit Availability Factor
- 1
.0 57.2
- 21. Unit Capacity Factor (Using MDC Net)
.1
.0 56.2
- 22. Unit Capacity Factor (Using DER Net) 99.1 99.1 16.3
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each):
None May 21. 1983
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICALITY INIrlAL ELECTRICITY COMMERCIAL OPER ATION f'306160561 830515 PDR ADOCK 05000313 (o/77:
R PDR
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-313 I
UNIT 5/15/83 DATE COMPLETED BY K_I_Mnrtnn TELEPHONE 501-064-3115 MONm April. 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
0 0
2 is 0
0 3
39 0
4 20 s
0 21 0
0 O
6 2;
0 0
7 23 0
8 0
24 0
0 9
25 0
0 to 26 i
5 27 0
l 12 1
0 28 0
0 13 29 0
0 14 3g Is 0
3, 0
16 INSTRUCTIONS On this format, list the average daily unit power lesel in MWe-Net for each d:.y in the reporting month. Compute io the nearest whole megawatt.
(9/77 )
50-313 DOCKET NO.
UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME ANO-Unit 1 DATE May 10 1983 COMPLETED BY Ken Morton REPORT MONTil April-TELEPHONE (501) 964-3115
-c
-: w e
]?
fgX Licensee
,-r, Et Cause & Corrective 5
No.
Date g
g j
jg5 Event
- ?
83 Action to t
Report #
E0 Prevent Recurrence H
$5 5
~ dj ={
v e
j C
82-07 821108 S
260.5 C
4 N/A N/A N/A 1-R5 Refueling Outage 83-01 830412 F
454.3 A
N/A N/A HA TURBIN The unit tripped on high RCS pressure due to a malfunction of the EHC system on the main turbine. The unit remained shutdown due to a failure of the #5 Main Turbine bearing.
Corrective action:
repaired bearing.
3 4
1 2
Method:
Exhibit G -Instructions F: Forced Reason:
1 Manual for Preparation of Data S: Scheduled A Equipment Failure (Explain)
B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee 3 Automatic Scram.
Event Report (LER) File (NUREG-C Refueling 4-Continuation 0161)
D-Regulatory Restriction E-Operator Training & License Examination 5-Load Reduction 5
F-Administrative 9-0ther Exhibit I - Same Source G Operational Error (Explain)
W/77) 11-0ther (Explaini
e-WP83468 NRC MONTHLY OPERATING REPORT OPERATING
SUMMARY
- APRIL, 1983 UNIT 1 The unit started the month in the final stages of refueling outage 1-RS.
The unit was brought critical and Low Power Physics Testing was com-pleted on the 10th. A power escalation was begun with the turbine being placed on line at 20:30 on the lith. At 00:41 on the 12th the reactor tripped on high RCS pressure and the turbine subsequently tripped. The reactor was then brought critical again but some problems were being experienced with the turbine. After an inspection revealed a failed main turbine bearing it was decided to shutdown once again to replace it.
Running concurrently with the bearing replacement was an inspection of the upper core barrel support bolts. This inspection decision was based on problems experienced _by other B&W plants. The unit remained shutdown through the remainder of the month.
REFUELING INFORMATION 1.-
Name of facility.
Arkansas Nuclear One - Unit 1 2.
Scheduled date for next refueling shutdown.
September 15, 1984 3.
~ Scheduled date for restart following refueling.
December 15, 1984 4.
Will refueling or resumption of operation thereafter require a technical specification change cr other license amendment?
If answer is yes, what, in general, will these be?
If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?-
Yes. Reload report and associated proposed Technical Snocification chanae.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
Seotember 1. 1984 6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes ia fuel design, new operating procedures.
To be determined l
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool. a) 177 b) 316 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
present 589 increase size by 170 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
~1909
~
, ~ ~
~
DATE:
ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK, ARKANSAS 72203 (501) 371-4000 May 16, 1983 1CAN058303 i
Mr. Harold S. Bassett, Director Division of Data Automation and Management Information i
Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C.
20555
SUBJECT:
Arkansas Nuclear One - Unit 1 h
Docket No. 50-313 License No. DPR-51 Monthly Operating Report (File:
0520.1)
Gentlemen:
Attached is the NRC Monthly Operating Report for April 1983 for Arkansas Nuclear One - Unit 1.
Very truly yours, t
ohn R. Marshali Manager, Licensitg JRM:SAB:sc Attachment cc:
Mr. John T. Collins Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011
/
Mr. Richard C. DeYoung
//
Office of Inspection and Enforcen.ent U. S. Nuclear Regulatory Commission Washington, DC 20555 MEMBER MtOOLE SOUTH UTIUTIES SYSTEM
_ _ _ _ _ - _ _ _ _ _ _ _