1CAN048317, Monthly Operating Rept for Mar 1983
| ML20084M286 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/27/1983 |
| From: | John Marshall, Morton K ARKANSAS POWER & LIGHT CO. |
| To: | Haller N NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| 1CAN048317, 1CAN48317, NUDOCS 8306020081 | |
| Download: ML20084M286 (7) | |
Text
.
OPERATING DATA REPORT DOCKET NO.30-313 DATE 4/27/83 COMPLETED BY K.L. Morton TELEPl10NE 501-964-2115 3
OPERAllNG STA10S N"'"
Arkansas Nuclear One - Unit 1
- 1. Uni Name:
March 1-31. 10R3
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
2568 902.74
- 4. Nameplate Rating IGross SIWE):
850 5 Design Electrical Rating (Net MWel:
883
- 6. Maximum Dependable Capacity (Gross MWe):
836
- 7. Masimum Dependable Capacity (Net Mbe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
NONE
- 9. Power Lesel To Which Restricted. lf Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
This Month Yr.-to-Date Cumulatise 744.0 2160.0 72595.0 II. Ilours in Reporting Peiiod 0
0 48007.3
- 12. Number Of flours Reactor was Critica!
0 0
5044.0
- 13. Reactor Rewne Shutdown flour,
- 14. Ilours Generator On Line 0
0_
47057.5
- 15. Unit Resene Shutdown flours n
0 817.5
- 16. Gross Thermal Energy Generated tMWIO O
O 111769814.
- 17. Gross EIcetrical Energy Generated iMWill 0
0 36765044.
0 0,
35037810.
- 18. Net Electrical Energy Generated (Mhill 0
0 64.8 j
- 19. Unit Senice Factor 0
0 65.9
- 20. Unit Asailability Factor U
U 57.7
- 21. Unit Capacity Factor IUsing MDC Neil l
0 0
56.8
- 22. Unit Capacity Factor (Using DER Net 1 0
0 15.6
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Ne.st 6 Months iType. Date.and Duration of Each1:
Unit now in scheduled refueling outage which began November 8. 1982
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior Io Commercial Operationi:
Forecast Achiesed INITIA L CRlllCA LITY INITI A L ELECTRICI TY l
COM\\lERCI A L OPER AllON ll 8306020081 830427 PDR ADOCK 05000313 PDR 10/778 l
R L
AVER AGE DAILY UNIT POWER LEVEL i
DOCKET NO.
50-313 1
UNIT DATE 4/27/83 K. M. Morton COMPLETED BY TELEPHONE 501-964-3116 MONTH Ma rc h. 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 0 0-17 0
2 0
gs 0
o 3
0 0
4
,9 0
0 5
2:
0 0
6 22 0
0 7
23 0
o 8
0 0
25 i
0 0
10 26 0
0 27
\\
0 0
28 0
0 33 29 0
'4 30 0
g 0
15 3
16 0
INSTRUCTIONS On this format. list the aver. ige daily unit power level in Mwe. Net for each day n Ihe reporting month. Compute to i
the nearest whole megawart.
(9/77 )
. - ~.
DOCKET NO.
50-313 UNil SilUTDOWNS AND POWER REDUCTIONS UNIT NAME ANO-Unit 1 DATE Anril a long Ken Morton COMPLETED BY REPORT MONTil March TELEPHONE (501) 964-3115
~.
E E
Licensee
[-r,,
f~",
5_ ?
"h j $5 Ceuse & Corrective Action to 3g 4
.a s 5 Event sj gg No.
Dale c.
Prevent Recurrence yE 3 5 =g Report e mU H
e o
6 82-07 821108 5
744.0 C
4 N/A N/A N/A 1-R5 Refueling Outage 4
i l
l 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4-Continuation 0161)
E. Operator Training & License Examination 5-Load Reduction 5
F-Administrative 9-Other G-Operational Er ror (Explain)
Exhibit I Same Source i
t P3/77)
Il Other (Explain) 1 1
NRC MONTHLY OPERATING REPORT OPERATING
SUMMARY
- MARCH 1983 UNIT 1 The Unit remained shutdown the entire month for the I-RS Refueling Outage.
~
REFUELING INFORMATION 1.
Name of facility.
Arkansas Nuclear One - Unit 1 2.
Scheduled date for next refueling shutdown.
September 15. 1984 3.
Scheduled date for restart following refueling.
December 15, 1984 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If answer is yes, what, in general, will these be?
If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?
Yes.
Reload report and associated proposed Technical Specification change.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
Seotember 1. 19R4 6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
To be determined l
1 7.
The number of fuel assemblies (a) in the core and (b) in the spent l
fuel storage pool. a) 177 b) 116 l
l 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
I l
present RRQ increase size by 174 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
l DATE:
lqR4 l
ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK. ARKANSAS 72203 (501) 371-4000 April 28, 1983 1CAN048317 Mr. Norman M. Haller, Director Office of Management & Program Analysis U. S. Nuclear Regulatory Commission Washington, D. C.
20555
SUBJECT:
Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Monthly Operating Report (File:
0520.1)
Gentlemen:
Attached is the NRC Monthly Operating Report for March 1983 for Arkansas Nuclear One - Unit 1.
ry truly yours, ohn R. Marshall Manager, Licensing JRM:SAB:sc Attachment cc:
Mr. John T. Collins Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Mr. Richard C. DeYoung Office of Inspection and Enforcement U. S. Nuclear _ Regulatory Commission g
Washington, DC 20555
!I MEMBER vtOOLE SOUTH UTIUTIES SYSTEM