1CAN039503, Monthly Operating Rept for Feb 1995 for Arkansas Nuclear One
| ML20081D860 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 02/28/1995 |
| From: | Hayes K, Mims D ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 1CAN039503, 1CAN39503, NUDOCS 9503210046 | |
| Download: ML20081D860 (7) | |
Text
.
\\{ f i '-ci;#' ENTERGY
[" led ?"" "'""*-
Andh4% AR 72301 Td 501858Ec0 March 15,1995 ICAN039503 U. S. Nuclear Regulatory Commission Document Control Desk Mail Station Pl-137 Washington, DC 20555
Subject:
Arkansas Nuclear One - Unit 1 Decket No. 50-313 License No. DPR-51 Monthly Operating Report Gentlemen:
The Arkansas Nuclear One - Unit 1 Monthly Operating Report for February 1995 is attached.
This report is submitted in accordance with ANO-1 Technical Specification 6.12.2.3.
Very truly yours, dufVC 72C Dwight C. Mims Director, Licensing DCM/dwb Attachments J
\\
210113 9503210046 950228 1
PDR ADOCK 05000313 R
k d
{l
i
'U. S. NRC ig March 15,1995 l
1CANO39503 Page 2 j
cc:
Mr. Leonard J. Callan Regional Administrator U. S. Nuclear Regulatory Commission Region IV.
611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064
)
NRC Senior Resident Inspector Arkansas Nuclear One 1448 S. R. 333 RusselMile, AR72801 Mr. George Kalman NRR Project Manager Region IV/ANO-1 & 2
~ U. S. Nuclear Regulatory Commission NRR Mail Stop 13-H-3 One White Flint North 11555 Rockville Pike Rockville,.MD 20852
)
l
j
+
q OPERATING DATA REPORT l
DOCKET NO:
50-313 DATE:
March 15,1995 COMPLETED BY: K. R. Hayes TELEPHONE:
(501) 858-5535 OPERATING STATUS 1.
Unit Name: Arkansas Nuclear One - Unit 1 2.
Reporting Period:
February 1-28, 1995 3.
Licensed Thermal Power (MWt): 2,568 4.
Nameplate Rating (Gross MWe): 902.74 5.
Design Electrical Rating (Net MWe): 850 6.
Maximum Dependable Capacity (Gross MWe): 883 7.
Maximum Dependable Capacity (Net MWe): 836 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Restricted. If Any (Net MWe): 72.5 %
10.
Reasons For Restrictions. If Any-Failure of the "B" reactor coolant pump motor bearings resulted in three pump operation MONTH YR-TO-DATE CUMULATIVE I 1.
Ifours in Reporting Period.
672.0 1,416.0 177,043.0 12.
Number ofIlours Reactor was Critical....
313.2 1,057.2 130,313.4 13.
Reactor Reserve Shutdown Hours...
0.0 0.0 5,044.0 14.
Iloers Generator On-Line.....
312.4 1,056.4 128,044.4 15.
Unit Reserve Shutdown Hours...
0.0 0.0 817.5 16.
Gross Thermal Energy Generated (MWII)..
577,636.2 1,974,132.8 2 %,128,022.0 17.
Gross Electrical Energy Generated (MWH).......
195,725.0 670,015.0 98,981,935.0 18.
Net Electrical Energy Generated (MWII)..
I82,548.0 635,064.0 94,160,761.0 19.
Unit Service Factor...
46.5 74.6 72.3 20.
Unit Availability Factor.
46.5 74.6 72.8 21.
Unit Capacity Factor (Using MDC Net).
32.5 53.6 63.6 22.
U11t Capacity Factor
( ! sing DER Net)....
32.0 52.8 62.6 23.
Unit Forced Outage Rate.....
0.0 0.0 10.6 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25.
If Shut Down At End of Report Period. Estimated Date of Startup:
26.
Units in Test Status (Prior to Commercial Operation):
l Forecast Achieved j
INITIAL CRITICALITY 08/06/74 J
INITIAL ELECTRICITY 08/17n4 COMMERCIAL OPERATION 12/19n4
- a i.
s i
0-
' AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:
50-313 UNIT:
One DA'IE:
March 15,1995 COMPLETED BY: K. R. Hayes TETEPHONE:
(501)858 5535 MON'lli February 1995 DAY AVERAGE DAILY POWER LEVEL (MWe-Nc0 1
602 2.
604 3
602 4...............................
603 5......................
601 6.
603 7........................
599 8...........................
601 9...............................
599 10.........................
600 11....................................
600 12...............................
601
- 13...........
558 i
14............................
-25 15....................................
-26 16...........................
-25 17.......................
-24 18.
-20 19..............................
5 20...............................
-5 21.
-5 22.........................
-5 23............................
-6 24.................
-5 j.
25................................
4 26..........................
4 l
27.............................
-4 28...............................
-4 2 9..........
- N/A 30.................................
- N/A 31...........................
- N/A AVGS: 272
~
IliSTRUCTION On this fonnat, list the average daily unit power level in MWe-Net for.ach day in reporting month. Complete to the nearest whole megawatt.
a
.r 4--
,r n.-s 3,
y,,,,
+
NRC MONTHLY OPERATING REPORT OPERATING
SUMMARY
FEBRUARY 1995 UNIT ONE -
Arkansas Nuclear One, Unit One, began the month operating at 72.5% power due to the failure of the "B" reactor coolant pump motor bearings, which occurred on January 1, 1995. On the thirteenth at 20 45 hours5.208333e-4 days <br />0.0125 hours <br />7.440476e-5 weeks <br />1.71225e-5 months <br />, the unit commenced a shutdown for refueling outage IR12. The turbine was manually tripped on the fourteenth at 00:23 hours. The unit remained offline for the refueling outage for the remeinder of the month.
f l
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT FOR Februory 1995 DOCKET NO.
50-313 UNIT NAME ANO Unit 1 DATE Marth 15,1995 COMPLETED BY K_R. Haws -
TELEPHONE
, 501-858-5535 METHOD OF LICENSEE DURATION SHUTTING DOWN EVENT SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO F_O,
DATE TYPE' GIOURS)
REASON 2 REACTOR
- AFPORT#
CODE' CODES PREVENT RECURRENCE Os 9541 950101 F
0 A
5 N/A AB MO Failure of the "B" reactor coolant pasap anoter bearings resulted la three penny operation at 72.5% power (contimmation from Inst month) 95-02 950214 S
359.6 C
1 N/A N/A N/A Refueling Outage IR12 1
2 3
4 F: Forced Reason:
Method:
Exhibit G -Instructions S: Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance of Test 2 - Mamiist Scram.
Entry Sheets for Ucensee C-Refueling 3 - Autoeistic Scram.
Event Report (LER) File (NURLCr4161)
D - Regulatory Restriction 4 - Continuation E - Operator Training & Ucense Examination 5 -IAnd Reduction F-Administration 9 - Other 5
G - Operational Error Exhibit I-Same Source H - Other (Explala)
Reporting Period: February 1995 REFUELING INFORMATION 1.
Name of facility: Arkansas Nuclear One - Unit 1 2.
Scheduled date for next refueling shutdown:. Entered refueling outane IR12 on February 14.1995 3.
Scheduled date for restart following refueling: Aoril 7.1995 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? If answer is yes, what, in general, will there be? If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10CFR Section 50.59)?
Technical Specification change to relocate additional cycle soccific parameters to the Core Operatina Limits Reoort (COLR).
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
Ibitchanne was submitted August 30.1994.
6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant clumges in fuel design, new operating procedures.
None planned 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
a)J12 b)2341 NOTE: The core was off-loaded on February 26,1995 for refueling outage IR12. The number of fuel assemblies in the core changed to 0 and the number in the spent fuel storage poolincreased to 922.
8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
present 2 fig increase size by 0 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
DATE:
1996 (Loss of full core off-load capability)
.