1CAN019405, Forwards ISI Summary Rept Ano,Unit 1 Outage 1R11. Rept Provides Insp Results of Class 1 & 2 Pressure Retaining Components & Supports for Period 920509-931019
| ML20063A843 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 01/17/1994 |
| From: | Yelverton J ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20063A845 | List: |
| References | |
| 1CAN019405, 1CAN19405, NUDOCS 9401270074 | |
| Download: ML20063A843 (3) | |
Text
.
~
i l-g
'i entergy operation., ine.
ENTERGY-OZfssa 1
Tel 501-90&8888
[
c Jerry W. Yelverton
.[
t wt Praw 4
0;x4 air.ru ANO January 17,1994
-i
U. S. Nuclear Regulatory Commission
[
- Document Control Desk Mail Station Pl-137 E
Washington, DC 20555
Subject:
Arkansas Nuclear One - Unit 1 Docket 'No. 50-313 License No. DPR-51 Inservice Inspection Outage Summary Report Gentlemen:
1 7
- Article IWA-6230,Section XI of the ASME Code requires the Owner to submit an inservice
(
inspection (ISI) summary report; As the operator for Arkansas Nuclear One, Unit 1
. (ANO-1), Entergy Operations'is submitting this repon on behalf of the Owner, Arkansas Power & Light Company (AP&L). The scope of the report is to provide the inspectici
~
results of the Class 1 and 2 pressure retaining components and their supports. This report is
}.
. due within 90 days of the completion of the ISI conducted during a refueling outage. provides the Form NIS-1 "Ownefs Report for keivice Inspections" and a y
summary of the ISI component examinations. The ISI was performed before and during the eleventh refueling outage (IR11) for ANO-1. The cur.ge was completed on October 19, 1993. This form was prepared in accordance with the 1989 Edition of Section XI of the Code.
The forms NIS-2, " Owner's Repon for Repairs and Replacements" are provided in
. Attachment 2 and_ address repairs and/oi replacements since the completion of the tenth refueling' outage (IR10), May 9,1992, through the completion of IRll, October 19, 1993, for ANO-1.
Should you have any questions regarding this submittal, please contact me.
N00S3 L9401270074 94o337
[
$DR -ADOCK 05000313 0 PDR f
i 1
f
1 U.S.NRC January 17,1994 1CAN019405 Page 2 Very truly yours, b0 JWY/jjd Attachments cc; Mr. James L. Milhoan i
U S. J c ea g
ory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One - ANO-1 & '
Number 1, Nuclear Plant Road Russellville, AR 72801 Mr. Roby B. Bevan, Jr.
.NRR Project Manager Region IV/ANO-1 U. S. Nuclear Regulatory Commission NRR Mail Stop 13-II-3 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Thomas W. Alexion NRR Project Manager, Region IV/ANO-2 U. S. Nuclear Regulatory Commission NRR Md stop 13-II-3 One White Flint North 11555 Rockville Pike Rockville, MD 20852 i
I i
+,.
- .1
' Attachment I to 1CAN019405 h
}
N
')
i i
i f
ATTACIB1ENT 1 FORM NIS-1
/
OWNER'S REPORT FOR 5
INSERVICE INSPECTIONS AND i
1.R11 OUTAGE
SUMMARY
REPORT s
.l l
i k
i I
I l
.