1CAN019405, Forwards ISI Summary Rept Ano,Unit 1 Outage 1R11. Rept Provides Insp Results of Class 1 & 2 Pressure Retaining Components & Supports for Period 920509-931019

From kanterella
(Redirected from 1CAN019405)
Jump to navigation Jump to search
Forwards ISI Summary Rept Ano,Unit 1 Outage 1R11. Rept Provides Insp Results of Class 1 & 2 Pressure Retaining Components & Supports for Period 920509-931019
ML20063A843
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/17/1994
From: Yelverton J
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20063A845 List:
References
1CAN019405, 1CAN19405, NUDOCS 9401270074
Download: ML20063A843 (3)


Text

, ~ ,

i l- g ,

-%' 'i

'_ entergy operation., ine.

ENTERGY- OZfssa 1 Tel 501-90&8888 [

c Jerry W. Yelverton .[

t wt Praw 4 0;x4 air.ru ANO January 17,1994 -i

.  : 1CAN019405 f

U. S. Nuclear Regulatory Commission [

- Document Control Desk Mail Station Pl-137 E Washington, DC 20555

Subject:

Arkansas Nuclear One - Unit 1 Docket 'No. 50-313 License No. DPR-51 Inservice Inspection Outage Summary Report .

, 1 Gentlemen:

7 - Article IWA-6230,Section XI of the ASME Code requires the Owner to submit an inservice

( inspection (ISI) summary report; As the operator for Arkansas Nuclear One, Unit 1

. (ANO-1), Entergy Operations'is submitting this repon on behalf of the Owner, Arkansas

~

Power & Light Company (AP&L). The scope of the report is to provide the inspectici results of the Class 1 and 2 pressure retaining components and their supports. This report is

}. . due within 90 days of the completion of the ISI conducted during a refueling outage.

Attachment 1 provides the Form NIS-1 "Ownefs Report for keivice Inspections" and a y summary of the ISI component examinations. The ISI was performed before and during the eleventh refueling outage (IR11) for ANO-1. The cur.ge was completed on October 19, 1993. This form was prepared in accordance with the 1989 Edition of Section XI of the Code.

The forms NIS-2, " Owner's Repon for Repairs and Replacements" are provided in

. Attachment 2 and_ address repairs and/oi replacements since the completion of the tenth refueling' outage (IR10), May 9,1992, through the completion of IRll, October 19, 1993, for ANO-1.

Should you have any questions regarding this submittal, please contact me.

N00S3 '

L9401270074 94o337

$DR -ADOCK 05000313 0

[

PDR i f

1 _

f

1 U.S.NRC  ;

January 17,1994 1CAN019405 Page 2 Very truly yours, b0 JWY/jjd Attachments cc; Mr. James L. Milhoan i

U S. J c ea g ory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One - ANO-1 & '

Number 1, Nuclear Plant Road Russellville, AR 72801 Mr. Roby B. Bevan, Jr.

.NRR Project Manager Region IV/ANO-1 U. S. Nuclear Regulatory Commission NRR Mail Stop 13-II-3 '

One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Thomas W. Alexion NRR Project Manager, Region IV/ANO-2 U. S. Nuclear Regulatory Commission NRR Md stop 13-II-3 One White Flint North 11555 Rockville Pike Rockville, MD 20852 i

I i

+ , . . .. , . . _ . .. ,. - - - .. .-

.1

' Attachment I to  ;

1CAN019405 h

}

N

')

i i

i f

ATTACIB1ENT 1 FORM NIS-1

/

OWNER'S REPORT FOR 5

INSERVICE INSPECTIONS  ;

AND -

i 1.R11 OUTAGE

SUMMARY

REPORT -,

s

.l l

i k

i l

I I

I l