MONTHYEAR2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 0CAN122201, Reply to a Notice of Violation; EA-22-0992022-12-0808 December 2022 Reply to a Notice of Violation; EA-22-099 0CAN112201, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2022-11-10010 November 2022 Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN102203, Cycle 31 Core Operating Limits Report2022-10-24024 October 2022 Cycle 31 Core Operating Limits Report 1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-10-13013 October 2022 Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 0CAN092201, Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-09-29029 September 2022 Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN092201, Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-09-0808 September 2022 Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 0CAN082201, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-08-30030 August 2022 License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN082201, Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-08-24024 August 2022 Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 2CAN072201, Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-07-20020 July 2022 Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods 0CAN072201, Registration of Cask Use2022-07-14014 July 2022 Registration of Cask Use 0CAN062202, Registration of Cask Use2022-06-0909 June 2022 Registration of Cask Use 1CAN062201, Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-06-0202 June 2022 Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 1CAN052201, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-0352022-05-31031 May 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-035 2024-01-17
[Table view] Category:Quality Assurance Program
MONTHYEAR0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment ML22104A0782022-04-14014 April 2022 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G 0CAN082101, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412021-08-10010 August 2021 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 0CAN042105, Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description2021-04-30030 April 2021 Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description 0CAN042101, Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description2021-04-0505 April 2021 Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description ML21091A1472021-04-0101 April 2021 Annual Report for Entergy Quality Assurance Program Manual and Indian Point Energy Center Quality Assurance Program Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 0CAN102002, Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description2020-10-26026 October 2020 Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description ML19094B0782019-04-0303 April 2019 Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML18099A3672018-04-0909 April 2018 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) (3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML17109A4872017-04-10010 April 2017 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G CNRO-2015-00023, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM)2015-11-0606 November 2015 Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2015-00012, Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual2015-04-30030 April 2015 Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual ML14330A2962014-11-26026 November 2014 Ltr s Pyle, Entergy Operations, Quality Assurance Program Approval for Radioactive Material Packages No. 0341, Revision 9 (Docket No. 71-0341) 0CAN111404, Units 1 and 2 - Renew Quality Assurance Program Approval for Radioactive Material Packages2014-11-10010 November 2014 Units 1 and 2 - Renew Quality Assurance Program Approval for Radioactive Material Packages CNRO-2013-00007, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2013-04-26026 April 2013 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications CNRO-2012-00003, Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2012-04-30030 April 2012 Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G CNRO-2011-00006, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications2011-12-13013 December 2011 Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications CNRO-2010-00002, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2010-04-29029 April 2010 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G CNRO-2009-00006, Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2009-04-13013 April 2009 Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G ENOC-08-00024, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(e) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2008-04-23023 April 2008 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(e) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML0904103222008-04-15015 April 2008 Entergy'S Quality Assurance Program Manual, Revision 18; Effective: April 15, 2008 ENOC-07-00020, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 162007-06-15015 June 2007 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 16 CNRO-2005-00024, Entergy Quality Assurance Program Manual, Revision 122005-04-0606 April 2005 Entergy Quality Assurance Program Manual, Revision 12 ML0312600022003-04-24024 April 2003 Issuance of Entergy Quality Assurance Program Manual (Qapm), Revision 8 CNRO-2003-00013, Entergy Quality Assurance Program Manual, Revision 82003-04-24024 April 2003 Entergy Quality Assurance Program Manual, Revision 8 ML0212805922002-04-25025 April 2002 Entergy Nuclear South Quality Assurance Program Manual, Revision 7 2023-08-17
[Table view] |
Text
Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802 Tel 479-858-7826 Riley D. Keele, Jr.
Regulatory Assurance Manager Arkansas Nuclear One 10 CFR 71.106 0CAN082101 August 10, 2021 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 Arkansas Nuclear One - Units 1 and 2 NRC Docket Nos. 50-313 and 50-368; 71-0341 and 72-13 Renewed Facility Operating License Nos. DPR-51 and NPF-6 REFERENCE 1) U. S. Nuclear Regulatory Commission (NRC) to Entergy Operations, Inc.
(Entergy), "Revised Quality Assurance Program Approval Form for Radioactive Material Packages No. 0341, Revision 9," Arkansas Nuclear One, (0CNA081505) (ML15236A124), dated August 17, 2015.
- 2) NRC to Entergy, "Arkansas Nuclear One, Units 1 and 2 - Request for Approval to Changes to the Entergy Quality Assurance Program Manual (EPID L-2020-LLQ-0005," (0CNA052104) (ML21132A279), dated May 19, 2021.
On June 12, 2015, the NRC issued a final rulemaking to amend 10 CFR 71 regulations. Among the changes made was an update to the administrative procedures for the quality assurance program requirements described in 10 CFR 71, Subpart H. Specifically, 10 CFR 71.38 has been amended to remove the requirements for the renewal of Quality Assurance Program Approvals, and 10 CFR 71.106 was added to establish requirements that will apply to changes to quality assurance programs.
Quality Assurance Program Approval for Radioactive Material Packages Number 0341, Revision 9, was issued to Entergy Operations, Inc., Arkansas Nuclear One (ANO), Units 1 and 2, on August 17, 2015 (Reference 1). 10 CFR 71.106 requires changes that are made to the ANO quality assurance program that do not reduce commitments must be submitted to the NRC every 24-months, with the reporting period starting on the date the latest approval was
0CAN082101 Page 2 of 2 given. This submittal is required even if no changes were made to the program in the previous 24-months.
The purpose of this submittal is to provide the required notification to the NRC of changes made to the quality assurance program for radioactive material packages during the reporting period of August 2019 to July 2021.
A summary of the changes made during this reporting period to the Entergy Quality Assurance Program Manual (QAPM) is provided in the attachment to this letter. It should be noted that all but the current revision (Revision 41) of the QAPM were made with no reductions to any commitment. Revision 41 represents a reduction in a commitment; however, the change is related to the American Society of Mechanical Engineers Code,Section XI, Repair /
Replacement programs only. The NRC approved the revision to the QAPM (Reference 2).
All the changes to the Entergy QAPM during this reporting period, summarized in the attachment, did not reduce any commitments related to the Quality Assurance Program Approval for Radioactive Material Packages Number 0341, Revision 9.
This submittal fulfills the 10 CFR 71.106 reporting requirements for this time period.
This letter contains no new regulatory commitments.
If you have any questions or require additional information, please contact Riley D. Keele Jr.,
Manager, Regulatory Assurance, at 479-858-7826.
Sincerely, ORIGINAL SIGNED BY RILEY D. KEELE, JR.
RDK/rwc
Attachment:
Summary of Changes to Entergy's Quality Assurance Program Manual - from August 2019 to July 2021 cc: NRC Region IV Regional Administrator NRC Senior Resident Inspector - Arkansas Nuclear One NRC Project Manager - Arkansas Nuclear One
Attachment to 0CAN082101 Summary of Changes to Entergy's Quality Assurance Program Manual from August 2019 to July 2021
Attachment to 0CAN082101 Page 1 of 3
SUMMARY
OF CHANGES TO ENTRGY'S QUALITY ASSURANCE PROGRAM MANUAL FROM AUGUST 2019 TO JULY 2021 Provided below are the summaries of the changes made to Entergy Operations, Inc., (Entergy)
Quality Assurance Program Manual (QAPM) during the reporting period of August 2019 to July 2021.
REVISION 38
- 1. This change to the Entergy Quality Assurance Program Manual (QAPM) separated the Indian Point Energy Center (IPEC) QAPM from the Entergy Fleet QAPM. The separation of IPEC from the Entergy QAPM is in preparation for the decommissioning of the IPEC.
To support the implementation of ongoing quality assurance activities and the transition to a decommissioning facility, IPEC adopted the Entergy QAPM under the guidance provided in 10 CFR 50.54(a)(3) and established a site-specific IPEC QAPM using the Entergy QAPM as the basis. The IPEC QAPM contains the same requirements and commitments as the current Entergy QAPM. The changes made to support this transition and allow the adoption of the Entergy QAPM involved primarily administrative changes to reflect a site-specific QAPM. These changes were assessed using the guidance provided in 10 CFR 50.54(a)(3) and did not constitute a reduction in commitments to the previously approved quality assurance program. (Reference letter NL-20-024 (ML20113E817) to the NRC dated April 22, 2020).
- 2. The Entergy QAPM cover sheet was changed to reflect the removal of the IPEC Unit 1, Unit 2, and Unit 3 docket numbers from the cover page. The Energy QAPM revision number was updated on all pages to Revision 38.
REVISION 39
- 1. Entergy QAPM Revision 38, Change 1, allows a grace period not to exceed 25% for audit interval for supplier audits. This is a reduction in commitment from the previously approved QAPMs. The current requirement of a 90-day grace period was submitted and approved in the Entergy QAPM, Revision 3, submitted via CNRO2000-00012 and accepted by the NRC, ADAMS Accession No.: ML003711555 and IPEC QAPM, Revision 0, submitted via NL-20-04 and accepted by the NRC. While the 25% grace period represents a reduction in commitment from the previously approved Entergy and IPEC QAPMs, the change has been previously evaluated and approved by the NRC, as documented in Southern Nuclear Company SER, approved June 17, 2005, ADAMS Accession No.: ML051570349.
- 2. Entergy QAPM Revision 38, Change 2, reduces the meeting frequency for the Safety Review Committee (SRC) meeting from twice per year to once per year. This is a reduction in commitment from the previously approved QAPMs. Entergy is committed to ANSI N18.7 1976, section 4.3.2.2, defining the meeting frequency for the independent review body as no less than twice per year. Entergy never took exception to this requirement; thus, Entergy is committed to this requirement in Revision 0 of the Entergy QAPM, submitted via CNRO1998-00025 and accepted by the NRC, letter dated
Attachment to 0CAN082101 Page 2 of 3 November 6, 1998; and IPEC QAPM, Revision 0, submitted via NL-20-04 and accepted by the NRC. While changing the SRC meeting frequency to once per year represents a reduction in commitment from the previously approved Entergy and IPEC QAPMs, the change has been previously evaluated and approved by the NRC, as documented in Nuclear Management Company, LLC, (NMC) SER, dated January 13, 2005, ADAMS Accession No.: ML050210276. This SER removes the requirement for the SRC completely; however, Entergy will use this SER to reduce the frequency for the meeting of the SRC and the SRC will still meet once per year and perform reviews as specified by ANSI N18.7-1976.
The On-site Safety Review Committee and Nuclear Independent Oversight currently perform the reviews the SRC performs, and these reviews will be used to supplement the reviews by the SRC when the meeting frequency is reduced.
These changes to the Entergy QAPM were issued in conjunction with the same changes to the IPEC QAPM. Entergy QAPM Revision 38, Change 1 and Change 2 were incorporated into Entergy QAPM Revision 39, effective July 16, 2020. IPEC QAPM Revision 1, Change 1 and Change 2 were incorporated into IPEC QAPM Revision 2, effective July 16, 2020.
REVISION 40
- 1. QAPM Revision 39, Change 1, modifies the QAPM to exempt American Society of Mechanical Engineers (ASME) Code Case N-752 Low Safety Significant (LSS) Class 2 and 3 structures, systems, and components (SSCs) from the requirements of the QAPM. This change has been submitted to the NRC for approval in letter 0CAN112001 dated November 17, 2020. This change has not been completed.
- 2. QAPM Revision 39, Change 2, is an update to the Entergy nuclear corporate and site organizational structure which alters the site records management reporting relationship. The management position for site records management will no longer report off-site to the Vice-President (VP) Regulatory Affairs, but instead will report to the site VP through the site Performance Improvement manager.
- 3. QAPM Revision 39, Change 3, reflects organizational changes made within the Entergy Nuclear senior executive organization as allowed by 10 CFR 50.54(a)(3)(iii) and 10 CFR 50.54(a)(3)(vi). This organizational change eliminates the position Senior VP Nuclear Operations, changes the reporting relationships for all three Chief Operating Officer (COO), Nuclear Operations positions from reporting to the Senior VP Nuclear Operations to reporting to the Executive VP, Nuclear Operations / Chief Nuclear Officer (CNO), creates a new position Senior VP, Corporate Services reporting to the CNO, and changes the reporting relationships for the following positions from reporting to the Senior VP Nuclear Operations to reporting to the new position Senior VP, Corporate Services: VP, Outage Services, VP, Operations Support, and VP, Regulatory Assurance.
These changes to the Entergy QAPM were issued in conjunction with the same changes to the IPEC QAPM. These changes were incorporated into Entergy QAPM Revision 40, effective February 7, 2021 and the IPEC QAPM Revision 3, effective February 7, 2021.
Attachment to 0CAN082101 Page 3 of 3 REVISION 41 (Current revision)
This change added an exemption to the Entergy QAPM, Section A.7 for the implementation of ASME Section XI Code Case N-752, "Risk-Informed Safety Classification and Treatment for Repair/Replacement Activities in Class 2 and 3 Moderate Energy Systems," for treatment of safety-related Structures Systems and Components (SSCs) regarding treatment of Low Safety Significant (LSS) in lieu of the associated QA requirements provided 10 CFR 50 Appendix B or NQA-1 is not required at the nuclear site.
Revision 41 represents a reduction in a commitment; however, the change is related to the American Society of Mechanical Engineers Code,Section XI, Repair / Replacement programs only. The NRC approved the revision to the QAPM (Reference 1).
CONCLUSION All the changes to the Entergy QAPM during this reporting period, summarized in the attachment, did not reduce any commitments related to the Quality Assurance Program Approval for Radioactive Material Packages Number 0341, Revision 9.
REFERENCE
- 1. NRC to Entergy, "Arkansas Nuclear One, Units 1 and 2 - Request for Approval to Changes to the Entergy Quality Assurance Program Manual (EPIDL 2020-LLQ-0005," (0CNA052104)
(ML21132A279), dated May 19, 2021.