Arkansas, Units 1 and 2, Emergency Plan On-Shift Staffing Analysis, Revision 2
ML17236A178
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/22/2017
From: Pyle S
Entergy Operations
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
0CAN081704
Download: ML17236A178 (2)


Text

~Enter~

Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One OCAN081704 August 22, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Emergency Plan On-Shift Staffing Analysis, Revision 2 Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313, 50-368, and 72-13 License Nos. DPR-51 and NPF-6 In accordance with 10 CFR' 50.4(b)(5), 10 CFR 50.54(q)(5), 10 CFR 72.4, and 10 CFR 72.44(f),

the Arkansas Nuclear One ,(ANO) Emergency Plan (EPlan) On-Shift Staffing Analysis (OSA) has been revised and is included in attachment to this letter.

ANO has a five-member fire brigade. An additional operator was previously added to each shift to act as the 5th fire brigade member, replacing the previous reliance on a security officer to fill this position. Revision 40 of the ANO EPlan and Revision 1 of the OSA captured this change; however, additional references to the security officer were later identified in the OSA. OSA, Revisio*n 2, (attached) replaces the remaining security officer references with the appropriate reference to an operator, along with necessary supporting administrative changes (see OSA Pages 2, 102, 108, and 114). No actual staffing changes result from this OSA revision.

10 CFR 50, Appendix E, Section IV.A.9, establishes the OSA as part of the EPlan. NRC NSIR/DPR-ISG-01, "Emergency Planning for Nuclear Power Plants,"Section IV.C, also speaks of staffing analyses as part of the EPlan. Pursuant to 10 CFR 50.54(q), a screening and/or evaluation of the changes to the ANO OSA was performed. The screening and/or evaluation concluded that the changes do not reduce the effectiveness of the EPlan, and the EPlan continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E.

This correspondence contains no new commitments. Should you have any questions regarding this submittal, please contact me.

Sincerely, -~~'f6 (0µ SS 1-4' NiC- ((_

SLP/dbb

OCAN081704 Page 2 of 2

Attachment:

ANO Emergency Plan On-Shift Staffing Analysis Report, Revision 2 cc:

  • Mr. Scott Morris Acting Regional Administrator U. S. Nuclear Regulatory Commission RGN-IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P. 0. Box 310 London, AR 72847
  • U. S. Nuclear Regulatory Commission Attn: Mr. Thomas Wengert MS 0-8B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Michael Layton Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington D. C. 20555 Mr. Paul Elkmann NRC Region IV (Senior Emergency Preparedness Inspector)