05000461/LER-1998-024, :on 980708,failure to Perform Surveillance Testing on Div II Voltage Relays within Specified Frequency of TS Was Noted.Cause of Event Is Under Investigation.Util Expects to Issue Rev to Rept by 980907

From kanterella
(Redirected from 05000461/LER-1998-024)
Jump to navigation Jump to search
:on 980708,failure to Perform Surveillance Testing on Div II Voltage Relays within Specified Frequency of TS Was Noted.Cause of Event Is Under Investigation.Util Expects to Issue Rev to Rept by 980907
ML20236Y583
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/07/1998
From: Stalter W
ILLINOIS POWER CO.
To:
Shared Package
ML20236Y582 List:
References
LER-98-024, LER-98-24, NUDOCS 9808120324
Download: ML20236Y583 (3)


LER-1998-024, on 980708,failure to Perform Surveillance Testing on Div II Voltage Relays within Specified Frequency of TS Was Noted.Cause of Event Is Under Investigation.Util Expects to Issue Rev to Rept by 980907
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(x)

10 CFR 50.73(a)(2)(iv), System Actuation

10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
4611998024R00 - NRC Website

text

l i

  • NAC FORM 3*C U.S. NUCLEAR REGULAToAY COMMISSION A**novso a v a Me no. a s soa isa 44-951 EXPwua 04/30tes (StiMATIO tuf;D(N PEA RE SPON3 TO COM*LY wiTM THIS M ANDATORY

'N80RM ATION COLuCTION AlOUfST: 60.0 MR$.

REPORTIO LI S$ONS LICENSEE EVENT REPORT (LER)

't'aato ^at 'acoaao**Tto 'NTO TMt uCaNsNG PROC ss AuO 8 0 sACu T0 INOVETRY. f 081 WARD COMMENTS REGARDING BUROEN ESTiMAT( TO TM(

IN808iM ATION ANO RE COROS M ANAGE ME NT BRANCM (T 6 F 331, U.$.

(See reverse for requsred number of NUCLE AR REGULATORY COMMr$90N. WASHINGTON. DC 20$664001. ANO TO THE PAPERWont REOUCTION PROJE CT 13160 0104). 08FICE 08 digits /chernetere for each block)

M ANAC(Mf MT AND SUDGET. WASHINGTON. OC 20603.

PAcEITY mAMt du DOCKET NUMapi(31 paos p, Clinton Power Station 05000461 1 or 3 Trfu m Feilure to Perform Surveillance Testing On Division 11 Degraded Voltage Relays Within the Specified Frequency of the Technical Specifications EVEf fT DATF BI LER NUMRFR (8 I

REPORT DATF f 71 OTHER Factt ITLES INV 3LVED (B)

MONTH DAY YEAR YEAR SE QU(N TIAL REVISON MONTH DAY YEAR

' ACiuTY NAME DOCKET NUMeER NUM8t R NUM8tR None 05000 07 08 98 98 024 00 08 07 98

' ^c " "^"I Docat' "uM. R None 05000 OPERATING THIS REPORT is $UsMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR 0; (Check one Or more) (til MODE (9) 4 20.2201(b) 20.2203(eH2Hv)

X 50.73(a)(2Hi) 50.73(aH2Hviii)

POWER 20.2203(a)(1) 20.2203(aH3H!)

50.73(aH2)(ii) 50.73(a)(2)(x)

LEVEL 110) 000 20.2203(a)(2Hi) 20.2203(aH3Hii) 50.73(a)(2Hiii) 73.71 pg p W W Myg g e 20.2203(e)(2Hii) 20.2203(aH4) 50.73(a)(2)(iv)

OTHER bhyd

  • WI 20.2203(aH2Hiii) 50.36tc)(1) 50.73(a)(2Hv)

Specify in Abstract below d k k;I 3 20.2203(eH2Hiv) 50.36(c)(2) 50.73(sH2)(vii) or in NRC Form 366A iIcFNM CONTACT FOR THIS LER (121 NAME TELEPHONE NUMeER (tru:iume Aree Cedel W. G. Stalter, Project Specialist, Work Management (217) 935-8881, Extension 3062 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRISED IN THIS REPORT (13)

CAUSE

SYSTEM COMPONENT MANUF AC tURER REPORTABLE s.9

CAUSE

SYSTEM COMPONENT MANUP ACTURER REPORTABLE TO HPRDS TO NPRDS s

)v s

s g,

O SUPPLEMENTAL REPORT EXPECTED (14]

EXPECTED MONTH DAY YEAR susMisslON DATE (15)

X YES NO Og 07 98 (if ves. comOlete EXPECTED SUBMISSION DATEl.

ABSTRACT (Lunit 10 1400 epeces, Le., approxernately 15 eingle spaced typewritten lines) (16)

On July 8, 1998, at approximately 0630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br /> it was discovered that functional testing of the Division II Degraded Voltage Relays had not been performed within the specified frequency of the Technical Specifications (TS).

The time requirement for functional testing of Division II Degraded Voltage Relays was exceeded on July 5, i

1998. The immediate corrective action taken for this event was performance of surveillance procedure Clinton Power Station (CPS) No. 9333.30, " Division II 4.16 KV l

Degraded Voltage Trip - Functional Test."

Performance of this surveillance procedure

{

satisfies the functional testing requirements of TS Surveillance Requirement (SR) 3.3.8.1.2 for the Division II Degraded Voltage Relays. A revision to this report will be issued identifying the cause, corrective actions to prevent recurrence, and safety significance of this event.

Illinois Power (IP) expects to issue a revision to this report by September 7, 1998.

9808120324 9sogo7 I

gDR ADOCK 05000461 i

PDR i

I j

a i

l l

NRC FORM 366 (4 95)

l e

's s

NRC FORM 361A U.S. NUCLEAR REGULATORY COMMISSION (4-954 LICENSEE EVENT REPORT (LER)

TEXT CONTINUATION FACILITY NAME fil DOCKET LER NUMRFR m)

PAGE f M YEAR SEOVENTIAL

"' " 0" NUMRTR kUMBIR Chnton Power Station 05000461 98 024 00 2

OF 3

1EKT ut more space os required, use additionet copies of NRC form 366A) l11}

DESCRIPTION OF EVENT-On July 8, 1998, the plant was in Mode 4 (COLD SHUTDOWN), reactor coolant temperature was b2ing maintained between 95 and 115 degrees Fahrenheit (F), and reactor coolant pressure was atmospheric. At approximately 0630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br /> the Clinton Power Station (CPS) Surveillance Coordinator was reviewing completed surveillance and discovered the surveillance that performs testing of the Division II Degraded Voltage Trip Relays (RLY), as required by T3chnical Specification (TS) Surveillance Requirement (SR) 3.3.8.1.2, had not been j

performed and was past its late date.

Further investigation discovered that the Limiting Condition for Operation (LCO) Actions were not being taken per LCO 3.3.8.1, " Loss of Power l

(LOP) Instrumentation," for the late surveillance. At approximately 0635 the Shift Manager (SM) was notified of this condition. The SM directed the performance of the missed surveillance and entered the actions of TS SR 3.0.3 which allows for a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> delay in d2claring-a system inoperable te, perform a missed surveillance.

Surveillance procedure CPS No. 9333.30, " Division II 4.16 KV Degraded Voltage Trip -

Functional Test," satisfies the functional testing Surveillance Requirements (SR) for the-Division II Degraded Voltage Relays and is required to.be performed every 31 days per TS SR 3.3.8.1.2.

CPS No. 9333.30 had been satisfactorily completed on May 28, 1998, and had a due date of June 24,.1998.

TS SR 3.0.2 establishes an allowance that the specified frequency for each SR is met if the Surveillance is performed within 1.25 times the frequency interval specified as measured from the previous performance or as measured from the time a specified condition of the frequency is met.

Using this allowance, the 1.25 times the frequency date was exceeded on July 5, 1998, and the Actions per LCO 3.3.8 1.2' w:re not taken. On July 8, 1998,.at approximately 1017 hours0.0118 days <br />0.283 hours <br />0.00168 weeks <br />3.869685e-4 months <br />, CPS No. 9333.30 was completed octisfactorily. Condition Report 1-98-07-057 was written to in,vestigate and track this issue to resolution.

No automatic or manually initiated safety system responses were necessary to place the plant in a safe and stable condition. This event was not directly affected by other inoperable equipment or components.

CAUSE OF EVENT

The cause of this event is under investigation. A revision will be issued to this report identifying the cause, corrective actions, and safety significance.

Illinois Power (IP) s;xpects to issue a revision to this report by September 7, 1998.

CORRECTIVE ACTIONS

The immediate corrective action for this event was to perform CPS No. 9333.30 to satisfy TS SR 3.3.8.1.2.

CPS No. 9333.30 was completed satisfactorily on July 8, 1998, at approximately 1017 hours0.0118 days <br />0.283 hours <br />0.00168 weeks <br />3.869685e-4 months <br />.

Corrective actions to prevent further similar events have not b2en determined and will be supplied in a revision to this report.

.I

e.

. s s

NRC FORM 3MA U.S. NUCLEAR REGULATORY COMMISSION M 9M LICENSEE EVENT REPORT (LER)

TEXT CONTINUATION

)

FACILITY NAME fi t DO CKET LER NUMRFR M1 PAGF (31 YEAR SEQUENTIAL

((

NUMBER Clinton Power Station 05000461 98 024 00 3

0F 3

TEXT (11more space is required, use addaronalcopies of NRC Form 366A) (11)

ANALYSIS OF EVENT

This event is reportable under the provisions of 10CFR50.73 (a) (2) (i) (B) p.s an operation or condition prohibited by the Technical Specifications. Testing of the Division II 4.16 KV Degraded voltage Trip Relays was not performed within the specified frer,uency of TS SR 3.3.8.1.2 and allowance provided by TS SR 3.0.2, and the Actions per LCO 2.3.8.1 were not met.

An assessment of the safety consequences and implications of this event will be provided in a revision to this report.

ADDITIONAL INFORMATION

No equipment or components failed during this event.

CPS has not reported similar events involving missed TS SR testing in recent history.

For further information regarding this event, contact William G. Stalter, Project Specialist Work Management, at (217) 935-8881, extension 3062.