| Q | CCA | Title |
---|
05000454/FIN-2015004-03 | 2015Q4 | H.9 | Failure to Implement Protective Tagging Procedure Requirements |
05000454/FIN-2015004-01 | 2015Q4 | H.12 | Inaccurate Technical Basis for Operability Evaluation of Reactor Head Flange Damage |
05000454/FIN-2015004-02 | 2015Q4 | H.6 | Mispositioned Valve in Diesel Fuel Oil Transfer Pump Recirculation Flow Path |
05000454/FIN-2016001-02 | 2016Q1 | H.5 | Entry into Mode 3 with Turbine Trip Function of SSPS Disabled |
05000454/FIN-2016001-01 | 2016Q1 | | Failure to Enter Technical Specification Limiting Condition for Operation Action Requirement with Auxiliary Feedwater Flow Control Valves Failed Open |
05000454/FIN-2016405-01 | 2016Q2 | H.8 | Security |
05000454/FIN-2016002-02 | 2016Q2 | H.11 | Failure to Comply With Radiation Work Permit Requirements Resulting In An Unplanned Dose Rate Alarm |
05000454/FIN-2016002-01 | 2016Q2 | P.2 | Failure to Perform ASME Code Case Required Extent of Condition to Identify Unacceptable Piping Flaws |
05000454/FIN-2016002-05 | 2016Q2 | | Licensee Implementation of Enforcement Guidance Memorandum 15002, Enforcement Discretion for Tornado-Generated Missile Protection Noncompliance |
05000454/FIN-2016201-01 | 2016Q3 | | Security |
05000454/FIN-2016003-01 | 2016Q3 | H.12 | DOST Flood Barrier Door Left Open |
05000455/FIN-2016003-02 | 2016Q3 | H.12 | Failure to Use Alteration Log Resulted in Fuel Oil Leak |
05000454/FIN-2016003-03 | 2016Q3 | H.1 | Failure to Properly Block and Brace a Radioactive Shipment for Transport |