05000346/FIN-2017003-02
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Auxiliary Feedwater Pump 1 Bearing Failure |
Description | A URI was identified by the inspectors relating to the final determination of the cause of the AFP 1 turbine inboard bearing failure. On September 13, 2017, the licensee performed the scheduled quarterlysurveillance test on AFP 1. This test requires the pump to run loaded with full flow of water, whereas the monthly test runs the pump only lightly loaded with water being 10 pumped through a minimum recirculation line. Within three minutes after the full flow adjustments were completed, the AFP 1 turbine inboard bearing high temperature alarm (>220 oF) actuated. The licensee verified the alarm was valid and manually tripped the AFP 1 turbine approximately 30 minutes after the alarm was received. Oil samples indicated bearing damage. The licensee disassembled the AFP 1 turbine bearing and observed bearing failure.Initial evaluation of the bearing by the licensee revealed that the damage was due to insufficient lubrication caused by low oil level. The oil level at the time of failure was within the indicated acceptable band of the oil sight glass, however, indicated band was significantly larger than the vendor recommended 3/8 inch and not at the correct height.The oil level in the sump was too low to sufficiently wet the oil slinger ring. This condition was determined to have existed since the previous pump quarterly test on June 21, 2017. After that test, a technician removed an oil sample, but did not replenish the oil. The oil level indicated low to mid band, but within the (incorrectly marked) acceptable range on the sight glass at the time. The licensee entered this issue into their CAP as CRs 201709443, 201709817, 201709527, and 201709857. Because the licensee had yet to complete their investigation and analysis of the event by the end of this inspection period, the issue is being treated as a URI pending the inspectors review of the licensees completed root cause evaluation. (URI 05000346/201700302, Final Cause Determination of Auxiliary Feedwater Turbine Bearing Failure) |
Site: | Davis Besse |
---|---|
Report | IR 05000346/2017003 Section 1R12 |
Date counted | Sep 30, 2017 (2017Q3) |
Type: | URI: |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.12 |
Inspectors (proximate) | D Mills T Briley J Rutkowski J Bozga R Edwards N Fields M Learn V Meghani J Neurauter J Park J Cameron |
INPO aspect | |
' | |
Finding - Davis Besse - IR 05000346/2017003 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Davis Besse) @ 2017Q3
Self-Identified List (Davis Besse)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||