| | Q | CCA | Title |
|---|
| 05000336/FIN-2010004-02 | 2010Q3 | H.14 | Failure to Perform an ASME Code-compliant Radiographic Examination on a Class 1 Weld on the Unit 2 \'A\' RCP Seal Cooler Piping |
| 05000336/FIN-2010008-02 | 2010Q3 | P.1 | Failure to Protect Safe Shutdown Equipment From the Effects of Fire |
| 05000336/FIN-2010004-01 | 2010Q3 | P.1 | Failure to Promptly Identify and Correct the Source of a Unit 2 RCS Pressure Boundary Leak |
| 05000336/FIN-2010004-03 | 2010Q3 | P.3 | Failure to Implement Timely Corrective Actions for a Degraded Unit 2 FRV Results in Manual Reactor Trip |
| 05000336/FIN-2010011-01 | 2010Q3 | | Security |
| 05000336/FIN-2010402-01 | 2010Q3 | | Security |
| 05000336/FIN-2010402-02 | 2010Q3 | H.12 | Security |
| 05000336/FIN-2010402-03 | 2010Q3 | H.12 | Security |
| 05000336/FIN-2010008-01 | 2010Q3 | H.7 | Failure to Control Fire Fighting Strategies |
| 05000336/FIN-2010005-01 | 2010Q4 | H.7 | Failure to Provide an Adequate Procedure for Backwashing Condenser Water Boxes |
| 05000336/FIN-2010005-02 | 2010Q4 | P.1 | Failure to Take Adequate Corrective Actions For a Broken Jacket Water Banjo Bolt on the 3 B EDG |
| 05000336/FIN-2011002-01 | 2011Q1 | P.5 P.2(b) | Failure to Prevent Safety Related Cables from Being Submerged |
| 05000336/FIN-2011002-02 | 2011Q1 | H.8 | lmproper Restoration of Air Conditioning Equipment Following Maintenance Results in Inoperability of \'B\' Train of Recirculation Spray System |
| 05000336/FIN-2011201-01 | 2011Q1 | H.12 | Security |