:on 841223,during Fuel Loading Operation, Reactor Protection Sys Actuated.Caused by Upscale Trip on Channel FLC a of Fuel Load Chambers Due to Electrical Noise Interference.Channel Replaced
ML20114D245
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 01/22/1985
From: Steiger W, Wynne J
LONG ISLAND LIGHTING CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
LER-85-001, LER-85-1, PM-85-012, PM-85-12, NUDOCS 8501310148
Download: ML20114D245 (3)


LER-1985-001, on 841223,during Fuel Loading Operation, Reactor Protection Sys Actuated.Caused by Upscale Trip on Channel FLC a of Fuel Load Chambers Due to Electrical Noise Interference.Channel Replaced
Event date:
Report date:
3221985001R00 - NRC Website

text

e IIRC Peru. NO U.S. NUCLEA/4 7.EGULATORY -:

"I APNIOVED Oess NO. 31so-C104 UCENSEE EVENT REPORT (LER)

OOCKET feURNER (2)

PAGE(3 PAC 8LITV NAM (1 ham Nuclear Rower Station Unit #1 Shore o ls l o io l o l3 l 2l 2 i lorj 2; TITLE 141 RPS Actuation Due to Electrical Noise SVSIST DATE(GI LaR peueNER (el RSPORT DATE (7)

OTHER PACILITIES INVOLVEO ISI MONTH DAY YEAR YEAR s 88$[

' [ E MONTH DAY YEAR P ACILITY N AMES DOCKET NUMSER($)

n 0 151010101 1 1 1l 2 2l3 84 8-l5 0l0 l 1 0l0 0l1 2l2 8 l5 o isio ic i o l l TMat REPORT le gUgastTTgO PUROUANT TO THE REQUIREteENTS OP 10 CPR $: (Cheet ene er meets of sne dettesempf (11)

OPERATHet 73.71(b) 30.400W 30.40B(s) 90.73deH2Hav)

N.734eH2Het 7171(al R

30.4NieH1H4 M.3SieH1D 00.73teH2Hvill HER (1st i i M.4NeeH1Het N.384elG) 00.734sH2HvillHA)

JOSA)

N.4NieH1HINI 80 73IelGHG 00.73(eH2HveaHe)

N.4NinH1HM 88.734eH2Hu)

N.4N4eH11M 98.734eH2Hain 30.734eH2Hal LICENSEE CostTACT POR TMIS LER 112)

NAME TELEPHONE NUMSER Joseph G. Wynne, Operational Compliance Engr.

51116 91219 l -18131010 COesPLETE ONE LINE POR EACH C0erOfeENT PAILURE DESCRIGEO IN THIS REPORT (131 "A"$O "hdy8

$bb UA CAU$E SYSTEM COMPONENT

CAUSE

SYSTEM COMPONENT TU R S

y I

I I I I I I I

I I i I I I I

I l l l l l l

l l I l l l SUPPL 8tdENTAL R$ PORT EXPGCTIO (14)

MONTH DAY YEAR SUOMISSION Yt$ (19 ye., earnPI.en GXPtCTRO SUO4NS$10N DATil NO l

l l

AseTRACT m.e 14N sss < A. se s.w, aR e 0M.-e er rm

, n.>

An RPS actuation occurred on 12/23/84 at 5:31 am during fuel loading operations. All rods were already fully inserted into the core.

The actuation was' caused by an upscale trip on one channel of the.

Fuel Load' Chambers (FLC "A") while moving the refueling bridge hoist with no fuel attached to the hoist. It was later verified that operation of the hoist was producing electrical noise causing spurious signals in the FLC. FLC "A" was' bypassed and replaced by

~

FLC "D".

The RPS system performed as required. All other systems operated as required.

eso131014e esotaa [DRADOCK 050003aa IC-1L

\\

\\

=, -

j

f a

sestC Feren 3384 U.S. NUCLEJA E EIULATORY COA 8hel8SION LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Ar*RovEo ou$ mo. sm-mo*

EXPtRES. 9/31/95 PACILITY NAa85 HD DOCKET NURASER (2)

LER hURASER (6)

PAGE (3I

ygg, stoutNtaAL Revech Shoreham Nuclear Power Station Unit #1 o ls lo lo lo l 3l2l2 8l 5 0l0l1 0 l0 l2 0F 2l Text ra R

., w

,anC r a$uwnn On December 23, 1984 at 5:31 am a RPS actuation occurred during fuel loading operation. The initiating event was an upscale trip on SRM "A" channel.

This channel was connected to the "A" Fuel Load Chamber (FLC) for the initial phases of fuel loading. Just prior to the RPS actuation, the tenth fuel bundle had been loaded into the core and put in location 25-32 (The

- "A" FLC was in position 17-28). At the time of the RPS actuation, no fuel was being moved, however, the main hoist of the refueling platform was being repositioned. The operators carried,out all required actions for an RPS actuation. No ECCS systems were challenged or required. The RPS system operated as designed. Recorders for the FLCs and periods indicated stable counts and stable infinite period. The 1/m plots were reviewed and verified that the plots did not predict criticality for the bundle inserted prior to the scram, or for the next bundle to be inserted in the core.

The RPS actuation was reported to the NRC in accordance with 10CFR50.72 at 6:57 am.

Based on the information available (i.e., Refuel Platform Hoist Movement, "A". Channel SRM Upscale Trip / Scram, Stable Counts) it appeared the FLC "A" upscale trip occurred due to electronic noise interference in the FLC "A" circuitry caused by the movement'of the refuel platform hoist. The FLC "A" channel was bypassed, and the hoist moved up and down. This resulted in a countrate jump of 1000 cpm and a high period alarm for the "A" FLC.

The "A" 7LC was left bypassed, and replaced in its core location by the "D" FLC. Fuel loading recon nenced. No further problems have been experienced. On January 8th-18th the SRMs were made operable thereby eliminating the requirement for the FLCs. No further corrective action is required.

l l

l I

geo.,.

t a

a 4

4,g LONG ISLAND LIGHTING COMPANY SHOREHAM NUCLE AR POWER STATION. P.O. Box 628

  • WADING RIVER. NEW YORK 11792 TE L. (516) 929 8300 January il, 1985 PM-85-012 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555

Dear Sir:

In accordance with 10CFR50.73, enclosed is a copy of Shoreham Nuclear Power Station Unit l's License Event Report 85-001.

Very truly yours, William E.

eiger, Jr.

Plant Manager WES/km Enclosure cc:

Dr. Thomas E. Murley, Regional Administrator P. Eselgroth, Senior Resident Inspector Institute of Nuclear Power Operations, Records Center American Nuclear Insurers SR2-A43.700 y

FC 8682.2