05000295/LER-1981-003, Forwards LER 81-003/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 81-003/03L-0
ML20004D682
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 02/13/1981
From: Graesser K
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20004D683 List:
References
NUDOCS 8106090645
Download: ML20004D682 (1)


LER-1981-003, Forwards LER 81-003/03L-0
Event date:
Report date:
2951981003R00 - NRC Website

text

-.___ -.

ye,

g-M Commonwealth Edison tion Generating Station Shitch Blvd. & Lake Michigan Zion,i:hnois 60099 g&

Telephone 312/746-2084 February 13, 1981

/,,

Mr. James G. Keppler N

Regional Director

y i fs@ [l,)g/

Office of Inspection and Enforcement Y

j Region III 01-f U.S. Nuclear Regulatory Commission 3

Glen Ellyn, Illinois 60137 J,

Reference:

Zion Generating Station 3, /w' :.. / '

Docket No. 50-295/DPR-39 Technical Specification, Section 6.6.2

Dear Mr. Keppler:

[c ad lease find Reportable Occurrence Report No.

50-295/8f-03frZionGeneratingStation.

is ort is submitted to you in accordance with the re-quiremen s of the Technical Specifications, Section 6.6.2.b.2 which states that conditions leading to operation in a degraded mode permitted by a limiting condition for operation or plant shutdown required by a limiting condition for operation require a 30 day written report.

Very truly yours,

/

K. L. Graesser Superintendent Zion Station cc:

J. Kohler/J. Waters

Enclosure:

Reportable Occurrence Report No. 50-295/80-03

'V I

81060UU @S FEB 1 7 1981

,c