| Start date | Site | Title |
---|
IR 05000352/2024002 | 12 August 2024 | Limerick | Integrated Inspection Report 05000352/2024002 and 05000353/2024002 |
ML24164A010 | 1 July 2024 | | Level 3 PRA Project, Volume 7: Dry Cask Storage PRA (Draft Report for Comment) |
ML24128A157 | 7 May 2024 | South Texas 07201041 | Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance |
RS-24-031, Updated Safety Analysis Report (Usar), Revision 23 | 1 April 2024 | Clinton | Updated Safety Analysis Report (Usar), Revision 23 |
IR 05000336/2023004 | 14 February 2024 | Millstone | Integrated Inspection Report 05000336/2023004 and 05000423/2023004 |
IR 05000250/2023004 | 13 February 2024 | Turkey Point | Integrated Inspection Report 05000250/2023004 and 05000251/2023004 |
ML23234A176 | 14 December 2023 | | IMC 0309 Reactive Inspection Decision Basis for Power Reactors |
ML23338A308 | 4 December 2023 | Holtec | Attachment 3: HI-STORM 100 Amendment 18 Proposed FSAR Revision 22E Pages (non-proprietary) |
ML23310A051 | 6 November 2023 | Callaway | EIP-ZZ.OO1O1, Addendum 2, Revision 22, Emergency Action Level Technical Bases Document |
ML23292A138 | 12 October 2023 | Susquehanna | 1 to Updated Final Safety Analysis Report, Chapter 9, Section 9.1, Fuel Storage and Handling |