Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML20339A397 | 10 December 2020 | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident |
IR 05000482/2020002 | 12 August 2020 | Integrated Inspection Report 05000482/2020002 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2020001 |
05000277/LER-2017-001 | 8 March 2017 | Emergency Diesel Generator Exhaust Stacks Nonconforming Design for Tornado Missile Protection LER 17-001-00 for Peach Bottom Atomic Power Station (PBAPS), Unit 2 Regarding Emergency Diesel Generator Exhaust Stacks Nonconforming Design for Tornado Missile Protection |
ML15133A500 | 14 April 2015 | Technical Specifications Bases |
ML15133A503 | 14 April 2015 | Technical Specifications Bases |
IR 05000277/2014004 | 7 November 2014 | IR 05000277/2014004, 05000278/2014004; 07/01/2014-09/30/2014; Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3; Fire Protection, Surveillance Testing, and Maintaining Emergency Preparedness |
RS-14-250, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 31 October 2014 | Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
ML14247A503 | 4 September 2014 | License Amendment Request - Maximum Extended Load Line Limit Analysis Plus |
ML14119A057 | 17 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident (Tac Nos. MF0261 and MF0262) |
ML14086A624 | 30 April 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (MF0157 and MF0158) |
RS-14-071, Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term. | 31 March 2014 | Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term. |
ML14091A479 | 25 March 2014 | Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
IR 05000277/2013002 | 9 May 2013 | IR 05000277-13-002 and 05000278-13-002; Peach Bottom Atomic Power Station - NRC Integrated Inspection Report (01-01-13 - 03-31-13) |
ML13121A378 | 10 April 2013 | Technical Specifications Bases |
ML13121A379 | 10 April 2013 | Technical Specifications Bases |
RS-12-174, Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 19 November 2012 | Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
ML13003A033 | 16 November 2012 | Report No. MPR-3812, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page B-104 |
ML13003A025 | 16 November 2012 | Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page B-104 |
ML12286A013 | 30 September 2012 | License Amendment Request - Extended Power Uprate, Attachment 4, NEDO-33566, Rev. 0, Safety Analysis Report, Constant Pressure Power Uprate, Cover Through Page 2-222 |
ML121230354 | 27 April 2012 | License Amendment Request - Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report |
ML12124A092 | 12 April 2012 | PBAPS Unit 3 - License No. DPR-56 Technical Specifications Bases |
ML12124A091 | 12 April 2012 | PBAPS Unit 2 - License No. DPR-44 Technical Specifications Bases |
ML12056A049 | 12 March 2012 | Enclosure 3 - Recommendation 2.3: Seismic |
ML12053A340 | 12 March 2012 | Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident |
ML12056A050 | 12 March 2012 | Enclosure 4 - Recommendation 2.3: Flooding |
ML11126A310 | 15 April 2011 | Unit Unit 3 Technical Specifications Bases, Page B 3.3-66, Through Page B 3.10-36 |
ML102500497 | 22 April 2010 | Changes to Technical Specifications Bases |
ML102500495 | 22 April 2010 | Changes to Technical Specifications Bases |
ML092790470 | 1 October 2009 | Revision 2 to Core Operating Limits Report for Reload 15, Cycle 16, Non-Proprietary Version, Enclosure 6 |
ML091280608 | 17 April 2009 | Changes to Technical Specifications Bases, Including Changes Through 04/08/2009 |
ML081350363 | 28 April 2008 | Changes to Technical Specifications Bases |
ML081350366 | 28 April 2008 | Changes to Technical Specifications Bases |
IR 05000277/2007003 | 30 July 2007 | IR 05000277-07-003, 05000278-07-003, 04/01/2007 - 06/30/2007, Peach Bottom Atomic Power Station (Pbaps), Units 2 & 3; Event Followup |
ML061280538 | 24 April 2006 | PBAPS Unit 2 - Technical Specifications Bases Page Revision Listing |
IR 05000277/2005002 | 5 May 2005 | IR 05000277-05-002, 05000278-05-002 on 01/01/2005 - 03/31/2005 for Peach Bottom Atomic Power Station, Units 2 and 3; Maintenance Effectiveness, Operability Evaluations, and Cross-Cutting Areas |
ML051400436 | 2 May 2005 | Improved Technical Specifications (Unit 2 Bases) |
ML051400438 | 2 May 2005 | Improved Technical Specifications (Unit 3 Bases) |
ML051180115 | 25 April 2005 | Issuance of the Core Operating Limits Report for Reload 15, Cycle 16, Revision 2 |
ML051120415 | 21 April 2005 | Issuance of the Core Operating Limits Report for Reload 14, Cycle 15, Revision 1 |
RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program | 29 November 2004 | Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program |
ML042810419 | 6 October 2004 | Issuance of the Core Operating Limits Report for Reload 15, Cycle 16, Revision 1 |
ML042680368 | 23 September 2004 | Lssuance of the Core Operating Limits Report for Reload 15, Cycle 16, Revision 0 |
IR 05000277/2003005 | 23 January 2004 | IR 05000277-03-005 & 05000278-03-005, on 09/28/2003 - 12/31/2003, for Peach Bottom, Units 2 and 3; Personnel Performance During Non-routine Plant Evolutions, Surveillance Testing, and Access Controls to Radiologically Significant Areas |
ML032880767 | 3 October 2003 | Issuance of the Core Operating Limits Report for Reload 14, Cycle 15, Revision 0 |
ML031960129 | 2 July 2003 | EP-AA-1007, Revision 7, Exelon Nuclear Radiological Emergency Plan Annex |
ML031250431 | 24 April 2003 | Submittal of Changes to TS Bases, Table of Contents Through Bases B 3.6 |
ML031250401 | 24 April 2003 | Submittal of Changes to TS Bases, Table of Contents Through Section B 3.6 |
ML030940275 | 26 March 2003 | Submittal of EP-AA-1007, Revision 5, Exelon Nuclear Radiological Emergency Plan Annex, for Peach Bottom Atomic Power Station, Units 2 & 3 |
ML022830178 | 1 October 2002 | Issuance of Core Operating Limits Report for Reload 14, Cycle 15, Revision 0 |
ML021190174 | 19 April 2002 | Part G - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 |