Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML20339A39710 December 2020Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident
IR 05000482/202000212 August 2020Integrated Inspection Report 05000482/2020002 and Independent Spent Fuel Storage Installation Inspection Report 07200079/2020001
05000277/LER-2017-0018 March 2017Emergency Diesel Generator Exhaust Stacks Nonconforming Design for Tornado Missile Protection
LER 17-001-00 for Peach Bottom Atomic Power Station (PBAPS), Unit 2 Regarding Emergency Diesel Generator Exhaust Stacks Nonconforming Design for Tornado Missile Protection
ML15133A50014 April 2015Technical Specifications Bases
ML15133A50314 April 2015Technical Specifications Bases
IR 05000277/20140047 November 2014IR 05000277/2014004, 05000278/2014004; 07/01/2014-09/30/2014; Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3; Fire Protection, Surveillance Testing, and Maintaining Emergency Preparedness
RS-14-250, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident31 October 2014Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML14247A5034 September 2014License Amendment Request - Maximum Extended Load Line Limit Analysis Plus
ML14119A05717 June 2014Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident (Tac Nos. MF0261 and MF0262)
ML14086A62430 April 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (MF0157 and MF0158)
RS-14-071, Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term.31 March 2014Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term.
ML14091A47925 March 2014Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
IR 05000277/20130029 May 2013IR 05000277-13-002 and 05000278-13-002; Peach Bottom Atomic Power Station - NRC Integrated Inspection Report (01-01-13 - 03-31-13)
ML13121A37810 April 2013Technical Specifications Bases
ML13121A37910 April 2013Technical Specifications Bases
RS-12-174, Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident19 November 2012Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML13003A03316 November 2012Report No. MPR-3812, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page B-104
ML13003A02516 November 2012Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page B-104
ML12286A01330 September 2012License Amendment Request - Extended Power Uprate, Attachment 4, NEDO-33566, Rev. 0, Safety Analysis Report, Constant Pressure Power Uprate, Cover Through Page 2-222
ML12123035427 April 2012License Amendment Request - Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report
ML12124A09212 April 2012PBAPS Unit 3 - License No. DPR-56 Technical Specifications Bases
ML12124A09112 April 2012PBAPS Unit 2 - License No. DPR-44 Technical Specifications Bases
ML12056A04912 March 2012Enclosure 3 - Recommendation 2.3: Seismic
ML12053A34012 March 2012Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident
ML12056A05012 March 2012Enclosure 4 - Recommendation 2.3: Flooding
ML11126A31015 April 2011Unit Unit 3 Technical Specifications Bases, Page B 3.3-66, Through Page B 3.10-36
ML10250049722 April 2010Changes to Technical Specifications Bases
ML10250049522 April 2010Changes to Technical Specifications Bases
ML0927904701 October 2009Revision 2 to Core Operating Limits Report for Reload 15, Cycle 16, Non-Proprietary Version, Enclosure 6
ML09128060817 April 2009Changes to Technical Specifications Bases, Including Changes Through 04/08/2009
ML08135036328 April 2008Changes to Technical Specifications Bases
ML08135036628 April 2008Changes to Technical Specifications Bases
IR 05000277/200700330 July 2007IR 05000277-07-003, 05000278-07-003, 04/01/2007 - 06/30/2007, Peach Bottom Atomic Power Station (Pbaps), Units 2 & 3; Event Followup
ML06128053824 April 2006PBAPS Unit 2 - Technical Specifications Bases Page Revision Listing
IR 05000277/20050025 May 2005IR 05000277-05-002, 05000278-05-002 on 01/01/2005 - 03/31/2005 for Peach Bottom Atomic Power Station, Units 2 and 3; Maintenance Effectiveness, Operability Evaluations, and Cross-Cutting Areas
ML0514004362 May 2005Improved Technical Specifications (Unit 2 Bases)
ML0514004382 May 2005Improved Technical Specifications (Unit 3 Bases)
ML05118011525 April 2005Issuance of the Core Operating Limits Report for Reload 15, Cycle 16, Revision 2
ML05112041521 April 2005Issuance of the Core Operating Limits Report for Reload 14, Cycle 15, Revision 1
RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program29 November 2004Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program
ML0428104196 October 2004Issuance of the Core Operating Limits Report for Reload 15, Cycle 16, Revision 1
ML04268036823 September 2004Lssuance of the Core Operating Limits Report for Reload 15, Cycle 16, Revision 0
IR 05000277/200300523 January 2004IR 05000277-03-005 & 05000278-03-005, on 09/28/2003 - 12/31/2003, for Peach Bottom, Units 2 and 3; Personnel Performance During Non-routine Plant Evolutions, Surveillance Testing, and Access Controls to Radiologically Significant Areas
ML0328807673 October 2003Issuance of the Core Operating Limits Report for Reload 14, Cycle 15, Revision 0
ML0319601292 July 2003EP-AA-1007, Revision 7, Exelon Nuclear Radiological Emergency Plan Annex
ML03125043124 April 2003Submittal of Changes to TS Bases, Table of Contents Through Bases B 3.6
ML03125040124 April 2003Submittal of Changes to TS Bases, Table of Contents Through Section B 3.6
ML03094027526 March 2003Submittal of EP-AA-1007, Revision 5, Exelon Nuclear Radiological Emergency Plan Annex, for Peach Bottom Atomic Power Station, Units 2 & 3
ML0228301781 October 2002Issuance of Core Operating Limits Report for Reload 14, Cycle 15, Revision 0
ML02119017419 April 2002Part G - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40