Semantic search

Jump to navigation Jump to search
 Start dateSiteTitle
05000266/FIN-2018002-0230 June 2018 23:59:59Point BeachUnanalyzed Condition for Tornado Generated Missiles
05000321/FIN-2018002-0130 June 2018 23:59:59HatchEnforcement Action (EA)-18-100: Unanalyzed Conditions for a Postulated Fire Discovered During NFPA 805 Transition
05000269/FIN-2018013-0131 March 2018 23:59:59OconeeFailure to Translate Design and Licensing Basis Requirements and Verify Adequate Design
05000254/FIN-2018001-0431 March 2018 23:59:59Quad CitiesEnforcement Action: EA18021: EDG Non-conformance for Tornado Missiles (EGM 15002)
05000266/FIN-2018001-0431 March 2018 23:59:59Point BeachEnforcement Action: EA18030: Unanalyzed Condition for Tornado Generated Missiles
05000373/FIN-2018001-0331 March 2018 23:59:59LaSalleEnforcement Action (EA) 18035: Licensee Implementation of Enforcement Guidance Memorandum 15002, Enforcement Discretion for Tornado-Generated Missile Protection Noncompliance
05000237/FIN-2018001-0131 March 2018 23:59:59DresdenEnforcement Action: EA18016: Unanalyzed Condition for Tornado Missiles
05000352/FIN-2017003-0230 September 2017 23:59:59LimerickLicensee-Identified Violation
05000313/FIN-2017003-0130 September 2017 23:59:59Arkansas NuclearFailure to Maintain Service Water Train Separation
05000482/FIN-2017002-0330 June 2017 23:59:59Wolf CreekEnforcement Action EA-17-064, Enforcement Discretion for Tornado-Generated Missile Protection Noncompliances
05000445/FIN-2017002-0630 June 2017 23:59:59Comanche PeakUnanalyzed Condition Involving Potential Moderate Energy Line Break
05000282/FIN-2017002-0330 June 2017 23:59:59Prairie IslandFailure to Make an 8Hour Report Required by05000306/201700203 10 CFR 50.72(b)(3)(ii)(B)
05000285/FIN-2016004-0231 December 2016 23:59:59Fort CalhounLicensee-Identified Violation
05000423/FIN-2016008-0430 September 2016 23:59:59MillstoneLicensee-Identified Violation
05000336/FIN-2016008-0330 September 2016 23:59:59MillstoneLicensee-Identified Violation
05000336/FIN-2016008-0230 September 2016 23:59:59MillstoneLicensee-Identified Violation
05000259/FIN-2016011-0230 September 2016 23:59:59Browns FerryFailure to Adequately Identify and Evaluate All Circuit Failures for NSCA Credited Equipment
05000456/FIN-2016002-0430 June 2016 23:59:59BraidwoodLicensee Implementation of Enforcement Guidance Memorandum 15002, Enforcement Discretion for Tornado-Generated Missile Protection Noncompliance
05000454/FIN-2016002-0530 June 2016 23:59:59ByronLicensee Implementation of Enforcement Guidance Memorandum 15002, Enforcement Discretion for Tornado-Generated Missile Protection Noncompliance
05000498/FIN-2016007-0931 March 2016 23:59:59South TexasFailure to Ensure Adequate Design Control Measures in Place to Mitigate a Loss of Normal Feedwater Flow Event
05000498/FIN-2016007-1031 March 2016 23:59:59South TexasFailure to Correct Procedure Deficiencies Allowing Cooling Restoration to RCP Seals
05000346/FIN-2016001-0731 March 2016 23:59:59Davis BesseLicensee-Identified Violation
05000293/FIN-2016008-0131 March 2016 23:59:59PilgrimFailure to Promptly Identify and Correct Core Spray System Leakage
05000338/FIN-2015004-0231 December 2015 23:59:59North AnnaLicensee-Identified Violation
05000293/FIN-2015008-0231 December 2015 23:59:59PilgrimLicensee-Identified Violation
05000244/FIN-2015008-0331 December 2015 23:59:59GinnaUnanalyzed Condition due to postulated hot short fire event involving direct current (DC) control circuits affecting multiple fire areas
05000254/FIN-2015003-0130 September 2015 23:59:59Quad CitiesFailure to Evaluate Degraded or Non-Conforming Conditions for Operability
05000266/FIN-2015003-0230 September 2015 23:59:59Point BeachPotential Failure of Multiple Safety-Related Trains During Flooding Events
05000461/FIN-2015003-0130 September 2015 23:59:59ClintonFailure to Follow Procedure leaves Control Room Cabinet doors Unattended in Seismically Unanalyzed Condition
05000374/FIN-2015002-0430 June 2015 23:59:59LaSalleFailure to Include Limiting Conditions for Operation in the Technical Specifications
05000282/FIN-2015002-0330 June 2015 23:59:59Prairie IslandFailure to Make an 8-Hour Report Required by 10 CFR 50.72(b)(3)(ii)(B)
05000321/FIN-2015001-0631 March 2015 23:59:59HatchUnfused DC Ammeter Circuits Result in an Unanalyzed Condition
05000289/FIN-2015001-0131 March 2015 23:59:59Three Mile IslandLicensee-Identified Violation
05000317/FIN-2015001-0131 March 2015 23:59:59Calvert CliffsComponent Cooling Operated in Unanalyzed Condition
05000272/FIN-2015007-0231 March 2015 23:59:59SalemLicensee-Identified Violation
05000456/FIN-2015001-0131 March 2015 23:59:59BraidwoodFailure to Ensure that Temporary Structures Did Not Adversely Impact Safety during Postulated Probable Maximum Precipitation Event
05000461/FIN-2015008-0131 March 2015 23:59:59ClintonInadequate 50.59 Evaluation for Switchgear in Seismically Unanalyzed Conditions
05000348/FIN-2014005-0431 December 2014 23:59:59FarleyUnfused DC Ammeter Circuits Result in an Unanalyzed Condition
05000263/FIN-2014009-0231 December 2014 23:59:59MonticelloFailure to Satisfy 10 CFR 50.72 and 10 CFR 50.73 Reporting Requirements for an Unanalyzed Condition
05000263/FIN-2014009-0131 December 2014 23:59:59MonticelloFailure to Satisfy 10 CFR 50.73 Reporting Requirements for an Unanalyzed Condition
05000321/FIN-2014005-0231 December 2014 23:59:59HatchFailure to report degraded fire penetration seals per 50.72 and 50.73
05000400/FIN-2014005-0131 December 2014 23:59:59HarrisFailure to Adequately Implement the Equipment Clearance Procedure
05000456/FIN-2014005-0131 December 2014 23:59:59BraidwoodFailure to Adequately Evaluate Operability Following the Discovery of an Unanalyzed Condition Involving the Probable Maximum Precipitation Event
05000282/FIN-2014005-0431 December 2014 23:59:59Prairie IslandLicensee-Identified Violation
05000461/FIN-2014005-0331 December 2014 23:59:59ClintonFailure to Translate Seismic Design Requirements into Applicable Procedures
05000482/FIN-2014008-0331 December 2014 23:59:59Wolf CreekLicensee-Identified Violation
05000456/FIN-2014004-0230 September 2014 23:59:59BraidwoodMultiple Failures to Follow Operability Evaluation Process Following Discovery of a Non-Conforming Condition in the Ultimate Heat Sink
05000498/FIN-2014008-0230 September 2014 23:59:59South TexasLicensee-Identified Violation
05000285/FIN-2014009-1830 September 2014 23:59:59Fort CalhounFailure to Complete Corrective Actions in a Timely Manner
05000269/FIN-2014007-0530 June 2014 23:59:59OconeePotential Unanalyzed Condition Associated with Emergency Power System