Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23125A220 | 5 May 2023 | Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) |
CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) | 4 May 2023 | Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) |
CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 | 27 April 2023 | Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 |
CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change | 9 June 2022 | Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change |
CNL-22-027, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 40 - Annual Update and Proposed Changes to Revision 40 | 28 April 2022 | Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 40 - Annual Update and Proposed Changes to Revision 40 |
CNL-21-067, Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change | 27 January 2022 | Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change |
ML21271A137 | 16 December 2021 | Issuance of Amendment Nos. 150 and 58 Regarding Modification of Technical Specification Surveillance Requirement 3.6.15.4, Shield Building |
WBL-21-057, Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report | 16 December 2021 | Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report |
CNL-21-055, Revision to Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report | 20 July 2021 | Revision to Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report |
ML21078A484 | 5 May 2021 | Issuance of Amendment Nos. 145 and 51 for One-Time Change to Technical Specification 3.7.11 to Extend the Completion Time for Main Control Room Chiller Modifications |
CNL-21-045, Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN8 | 29 April 2021 | Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89- |
WBL-21-006, Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report | 11 February 2021 | Refueling Outage 3 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Final Report |
CNL-20-087, Non-Voluntary Application to Modify Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications Surveillance Requirement 3.6.15.4, Shield Building, (WBN-TS-20-017) | 15 December 2020 | Non-Voluntary Application to Modify Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications Surveillance Requirement 3.6.15.4, Shield Building, (WBN-TS-20-017) |
ML20245E413 | 8 December 2020 | Issuance of Amendment Nos. 139 and 45 Regarding Revisions to Technical Specification 3.6.15, Shield Building |
ML20323A314 | 29 October 2020 | Amendment 3 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Table of Contents to Sec 3.7 |
WBL-20-047, Amendment 3 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (Redacted) | 29 October 2020 | Amendment 3 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (Redacted) |
ML20323A301 | 29 October 2020 | Amendment 3 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML20323A306 | 29 October 2020 | Amendment 3 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML20323A310 | 29 October 2020 | Amendment 3 to Updated Final Safety Analysis Report, Chapter 2, Sec 2.5, Geology, Seismology, and Geotechnical Engineering Summary of Foundation Conditions |
ML20323A311 | 29 October 2020 | Amendment 3 to Updated Final Safety Analysis Report, Chapter 4, Reactor |
ML21050A156 | 21 October 2020 | Graizer - Presentation - Analysis of Tva'S Watts Bar Nuclear Power Plant Strong-Motion Records of the M 4.4 December 12, 2018 Decatur Tennessee Earthquake |
ML20156A018 | 10 August 2020 | Issuance of Amendment No. 40 Regarding Technical Specifications for Steam Generator Tube Repair Sleeve |
CNL-20-012, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-18-16) | 19 May 2020 | Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-18-16) |
CNL-20-039, Bellefonte Nuclear Plant, 1 & 2; Browns Ferry Nuclear Plant, 1 & 2; Clinch River Site; Sequoyah Nuclear Plant, 1 & 2; and Watts Bar Nuclear Station, Units 1 & 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 38 | 30 April 2020 | Bellefonte Nuclear Plant, 1 & 2; Browns Ferry Nuclear Plant, 1 & 2; Clinch River Site; Sequoyah Nuclear Plant, 1 & 2; and Watts Bar Nuclear Station, Units 1 & 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 38 |
CNL-19-077, Application to Modify Watts Bar Nuclear Plant (WBN) Unit 1 and Unit 2 Technical Specifications 3.6.15, Shield Building, (WBN-TS-19-10) | 6 December 2019 | Application to Modify Watts Bar Nuclear Plant (WBN) Unit 1 and Unit 2 Technical Specifications 3.6.15, Shield Building, (WBN-TS-19-10) |
CNL-19-114, Supplement to Application to Revise Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specifications for Steam Generator Tube Repair Sleeve (WBN-TS-391-19-13) | 21 November 2019 | Supplement to Application to Revise Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specifications for Steam Generator Tube Repair Sleeve (WBN-TS-391-19-13) |
CNL-19-082, License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) | 10 October 2019 | License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) |
CNL-19-067, Application to Revise Watts Bar Nuclear Plant (WBN) Unit 2 - Technical Specifications for Steam Generator Tube Repair Sleeve (WBN-TS-391-19-13) | 30 September 2019 | Application to Revise Watts Bar Nuclear Plant (WBN) Unit 2 - Technical Specifications for Steam Generator Tube Repair Sleeve (WBN-TS-391-19-13) |
ML19063B721 | 3 June 2019 | Issuance of Amendment Regarding Application to Revise Technical Specifications for Use of Voltage-Based Alternate Repair Criteria in Accordance with Generic Letter 95-05 |
CNL-19-043, Bellefont Nuclear Plant, Units 1 & 2; Browns Ferry Nuclear Plan, Units 1, 2 & 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, R | 8 May 2019 | Bellefont Nuclear Plant, Units 1 & 2; Browns Ferry Nuclear Plan, Units 1, 2 & 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Rev |
L-19-022, Amendment 2 to Updated Final Safety Analysis Report, Chapter 8, Electric Power - Redacted | 18 March 2019 | Amendment 2 to Updated Final Safety Analysis Report, Chapter 8, Electric Power - Redacted |
ML19060A147 | 19 February 2019 | Amendment 1 to USAR Chapter 2 Auxiliary System NRC Additional Redactions 2 of 5 |
ML19039A049 | 8 February 2019 | Amd 1 to USAR Chapter 9 Auxiliary System NRC Additional Redactions |
ML19039A104 | 8 February 2019 | Amendment 1 to USAR Chapter 2 Auxiliary System NRC Additional Redactions 1 of 5 |
ML18115A138 | 10 July 2018 | Staff Review of the Seismic Probabilistic Risk Assessment Associated with the Implementation of the Near-Term Task Force Recommendation 2.1: Seismic (CAC Nos. MF9879 and MF9880; EPID L-2017-JLD-0044 |
CNL-18-069, Tennessee Valley Authority - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revisions 35 and 36 | 8 May 2018 | Tennessee Valley Authority - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revisions 35 and 36 |
05000390/LER-2017-013 | 24 January 2018 | 1 OF 5 LER 17-013-01 for Watts Bar Nuclear Plant, Units 1 and 2 Regarding Incorrectly Adjusted Auxiliary Building Gas Treatment System Damper Leads to a Condition Prohibited by Technical Specifications |
CNL-17-154, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 34 | 27 December 2017 | Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 34 |
ML20311A314 | 6 November 2017 | 2017 Q1-Q4 ROP Inspection Findings |
ML17334A156 | 2 November 2017 | Amendment 1 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (Redacted) |
ML17334A157 | 2 November 2017 | Amendment 1 to Updated Safety Analysis Report, Chapter 10, Main Steam and Power Conversion Systems |
ML17334A169 | 2 November 2017 | Amendment 1 to Updated Safety Analysis Report, Chapter 4, Reactor |
ML17334A170 | 2 November 2017 | Amendment 1 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System |
ML17334A172 | 2 November 2017 | Amendment 1 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls |
ML17334A173 | 2 November 2017 | Amendment 1 to Updated Safety Analysis Report, Chapter 8, Electric Power (Redacted) |
CNL-17-098, Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels | 27 July 2017 | Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels |
CNL-17-085, Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels | 7 July 2017 | Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels |
CNL-17-071, Seismic Probabilistic Risk Assessment, Response to NRC Request for Information Pursuant to 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 30 June 2017 | Seismic Probabilistic Risk Assessment, Response to NRC Request for Information Pursuant to 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
ML17062A681 | 7 March 2017 | Staff Review of Spent Fuel Pool Evaluation Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1( CAC Nos. MF3769 and MF3946) |
CNL-16-147, Non-Voluntary License Amendment Request to Modify and Clarify Technical Specification 3.6.15, Shield Building, Condition B Note | 6 March 2017 | Non-Voluntary License Amendment Request to Modify and Clarify Technical Specification 3.6.15, Shield Building, Condition B Note |