Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML10294036212 November 2010October 2010 10 CFR 2.206 Monthly Status Report: Enclosures
Information Notice 1998-13, Post-Refueling Outage Reactor Pressure Vessel Leak Testing Before Core Criticality20 April 1998Post-Refueling Outage Reactor Pressure Vessel Leak Testing Before Core Criticality
NRC Generic Letter 1995-1015 December 1995NRC Generic Letter 1995-010: Relocation of Selected Technical Specifications Requirements Related to Instrumentation
ML0311405497 November 1991Withdrawn NRC Generic Letter 1991-018: Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability
IR 05000029/19900166 November 1990Insp Rept 50-029/90-16 on 900821-1001.Violation Noted.Major Areas Inspected:Daytime & Backshifts in Areas of Plant Operations,Radiological Controls,Maint & Surveillance, Emergency Preparedness,Security
NRC Generic Letter 1990-0625 June 1990NRC Generic Letter 1990-006: Resolution of Generic Issue, Power-Operated Relief Valve and Block Valve Reliability, and Generic Issue 94, Additional Low-Temp. Overpressure Protection for Light-Water Reactors, Pursuant to 10 CFR 50354 (F)
PNO-I-89-073, on 890825,when Tagging Removed on 5-inch Diameter Bypass Line,Pressure Boundary Leakage Discovered from Defect in Socket Weld Connection Between Vent & Bypass Lines.Plant Shutdown.Leakage Rate Less than 1 Gpm25 August 1989PNO-I-89-073:on 890825,when Tagging Removed on 5-inch Diameter Bypass Line,Pressure Boundary Leakage Discovered from Defect in Socket Weld Connection Between Vent & Bypass Lines.Plant Shutdown.Leakage Rate Less than 1 Gpm
ML20215B43110 June 1987Forwards Info on Leak Tight Integrity of Reactor Coolant Pressure Boundary at Plant in Response to Generic Ltr 87-06. Util Utilizes Continuous Monitoring Techniques & Periodic Surveillance to Ensure Valve Leakage Detected Early
ML20135H35319 June 1984Package of Reactor Operator & Senior Reactor Operator License Exam Questions & Answer Keys for Several Facilities, Including Yankee Rowe,Point Beach Units 1 & 2,Fort Calhoun Unit 1 & Calvert Cliffs Units 1 & 2
ML20148G78218 July 1977Submits Proposed Change 150,Suppl 1 to Tech Specs,Revising Tech Specs to Be Consistent W/Revised Model STS for Fire Protection