Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23230A050 | 2 October 2023 | 5 of the Quality Assurance Topical Report - Review of Program Changes |
ML23175A005 | 12 July 2023 | Alternative Request P-07 for Pump Periodic Verification Testing Program for Containment Recirculation Spray System Pumps |
ML23193A857 | 28 June 2023 | 8 to Defueled Safety Analysis Report, Redacted |
ML23193A858 | 28 June 2023 | 8 to Defueled Safety Analysis Report, Drawings Incorporated by Reference |
ML23193A865 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary |
ML23193A866 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference - Redacted |
ML23193A879 | 28 June 2023 | Technical Requirements Manual (Incorporated by Reference) Including Change No. 185 |
ML23193A881 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations |
ML23193A882 | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Frontmatter |
ML23193A890 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Frontmatter |
ML23193A893 | 28 June 2023 | Technical Requirements Manual |
ML23193A898 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Drawing Incorporated by Reference |
ML23193A901 | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML22188A081 | 23 June 2022 | ISFSI, Virgil C. Summer Nuclear Station, Unit 1 & ISFSI, North Anna Power Station, Units 1 & 2 & ISFSI, Surry Power Station, Units 1 & 2 & ISFSI - Submission of Revision 32 of the Quality Assurance Topical Report |
ML22193A023 | 23 June 2022 | 7 to Defueled Safety Analysis Report |
ML22193A025 | 23 June 2022 | 7 to Defueled Safety Analysis Report, Drawings Incorporated by Reference - Redacted |
ML22193A063 | 23 June 2022 | 0 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary |
ML22193A072 | 23 June 2022 | 0 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference - Redacted |
ML22193A080 | 23 June 2022 | 0 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations |
ML22193A081 | 23 June 2022 | 0 to Updated Final Safety Analysis Report |
ML22193A135 | 23 June 2022 | 5 to Updated Final Safety Analysis Report |
ML22193A136 | 23 June 2022 | 5 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML22193A142 | 23 June 2022 | 5 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference |
ML22096A221 | 6 April 2022 | Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process |
ML22039A339 | 3 March 2022 | Request for Alternative Frequency to Supplemental Valve Position Verification Testing Requirements in the Fourth 10-year Valve Inservice Testing Program |
IR 05000336/2021004 | 10 February 2022 | Integrated Inspection Report 05000336/2021004 and 05000423/2021004 |
ML21174A020 | 2 August 2021 | Relief Request for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval |
ML21167A355 | 16 July 2021 | Authorization and Safety Evaluation for Alternative Request No. RR-05-06 |
ML21182A290 | 1 July 2021 | 7/1/2021 E-mail - Request for Additional Information Alternative Frequency to Supplemental Valve Position Verification Testing Requirements |
ML21167A211 | 30 June 2021 | Relief Request for Limited Coverage Examinations Performed in the Third 10-Year Inservice Inspection Interval (EPID L-2020-LLR-0081 Through L-2020-LLR-0088) |
ML21201A166 | 24 June 2021 | 9 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations |
ML21201A185 | 24 June 2021 | 4 to Updated Final Safety Analysis Report, Frontmatter |
ML21201A186 | 24 June 2021 | 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
ML21201A178 | 24 June 2021 | 4 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference |
ML21201A159 | 24 June 2021 | 9 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference - Redacted |
ML21201A155 | 24 June 2021 | 9 to Updated Final Safety Analysis Report, Frontmatter |
ML21201A154 | 24 June 2021 | 6 to Defueled Safety Analysis Report, Drawings Incorporated by Reference - Redacted |
ML21201A148 | 24 June 2021 | 6 to Defueled Safety Analysis Report, Chapter 1, Introduction and General Description of Plant; Chapter 2, Site Characteristics; Chapter 3, Facility Design and Operation; Chapter 4, Radioactive Waste |
ML21201A143 | 24 June 2021 | 9 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary |
ML21168A339 | 17 June 2021 | Virgil C. Summer Nuclear Station, North Anna Power Station, Surry Power Station -Submission of Revision 30 of the Quality Assurance Topical Report |
ML21075A045 | 26 March 2021 | Request to Utilize Code Case N-885 |
ML21084A239 | 24 March 2021 | Proposed Request for Alternative Frequency to Supplemental Valve Position Verification Testing Requirements |
ML21081A136 | 19 March 2021 | Response to Request for Additional Information for Alternative Request RR-05-06 - Inspection Interval Extension for Steam Generator Pressure-Retaining Welds and Full-Penetration Welded Nozzles |
ML21035A281 | 4 February 2021 | Revision to Emergency Plan - Report of Change |
ML21034A576 | 3 February 2021 | Request for Additional Information (e-mail Dated 1/3/2021) Alternative Request RR-05-06 Inservice Inspection Interval Extension for Steam Generator Weld Inspections |
ML20312A001 | 10 December 2020 | Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval |
ML20312A002 | 10 December 2020 | Relief Request for Limited Coverage Examinations Performed in the Third 10-Year Inservice Inspection Interval (EPID L-2020-LLR-0027 Through L-2020-LLR-0032) |
ML20324A703 | 19 November 2020 | Proposed License Amendment Request Measurement Uncertainty Recapture Power Uprate |
ML20287A471 | 20 October 2020 | Proposed Alternative RR-05-05 to the Requirements of the ASME Code Containment Unbonded Post-Tensioning System Inservice Inspection Requirements |