Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23230A0502 October 20235 of the Quality Assurance Topical Report - Review of Program Changes
ML23175A00512 July 2023Alternative Request P-07 for Pump Periodic Verification Testing Program for Containment Recirculation Spray System Pumps
ML23193A85728 June 20238 to Defueled Safety Analysis Report, Redacted
ML23193A85828 June 20238 to Defueled Safety Analysis Report, Drawings Incorporated by Reference
ML23193A86528 June 20231 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary
ML23193A86628 June 20231 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference - Redacted
ML23193A87928 June 2023Technical Requirements Manual (Incorporated by Reference) Including Change No. 185
ML23193A88128 June 20231 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations
ML23193A88228 June 20231 to Updated Final Safety Analysis Report, Frontmatter
ML23193A89028 June 20236 to Updated Final Safety Analysis Report, Frontmatter
ML23193A89328 June 2023Technical Requirements Manual
ML23193A89828 June 20236 to Updated Final Safety Analysis Report, Drawing Incorporated by Reference
ML23193A90128 June 20236 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML22188A08123 June 2022ISFSI, Virgil C. Summer Nuclear Station, Unit 1 & ISFSI, North Anna Power Station, Units 1 & 2 & ISFSI, Surry Power Station, Units 1 & 2 & ISFSI - Submission of Revision 32 of the Quality Assurance Topical Report
ML22193A02323 June 20227 to Defueled Safety Analysis Report
ML22193A02523 June 20227 to Defueled Safety Analysis Report, Drawings Incorporated by Reference - Redacted
ML22193A06323 June 20220 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary
ML22193A07223 June 20220 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference - Redacted
ML22193A08023 June 20220 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations
ML22193A08123 June 20220 to Updated Final Safety Analysis Report
ML22193A13523 June 20225 to Updated Final Safety Analysis Report
ML22193A13623 June 20225 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML22193A14223 June 20225 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference
ML22096A2216 April 2022Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process
ML22039A3393 March 2022Request for Alternative Frequency to Supplemental Valve Position Verification Testing Requirements in the Fourth 10-year Valve Inservice Testing Program
IR 05000336/202100410 February 2022Integrated Inspection Report 05000336/2021004 and 05000423/2021004
ML21174A0202 August 2021Relief Request for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval
ML21167A35516 July 2021Authorization and Safety Evaluation for Alternative Request No. RR-05-06
ML21182A2901 July 20217/1/2021 E-mail - Request for Additional Information Alternative Frequency to Supplemental Valve Position Verification Testing Requirements
ML21167A21130 June 2021Relief Request for Limited Coverage Examinations Performed in the Third 10-Year Inservice Inspection Interval (EPID L-2020-LLR-0081 Through L-2020-LLR-0088)
ML21201A16624 June 20219 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations
ML21201A18524 June 20214 to Updated Final Safety Analysis Report, Frontmatter
ML21201A18624 June 20214 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML21201A17824 June 20214 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference
ML21201A15924 June 20219 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference - Redacted
ML21201A15524 June 20219 to Updated Final Safety Analysis Report, Frontmatter
ML21201A15424 June 20216 to Defueled Safety Analysis Report, Drawings Incorporated by Reference - Redacted
ML21201A14824 June 20216 to Defueled Safety Analysis Report, Chapter 1, Introduction and General Description of Plant; Chapter 2, Site Characteristics; Chapter 3, Facility Design and Operation; Chapter 4, Radioactive Waste
ML21201A14324 June 20219 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary
ML21168A33917 June 2021Virgil C. Summer Nuclear Station, North Anna Power Station, Surry Power Station -Submission of Revision 30 of the Quality Assurance Topical Report
ML21075A04526 March 2021Request to Utilize Code Case N-885
ML21084A23924 March 2021Proposed Request for Alternative Frequency to Supplemental Valve Position Verification Testing Requirements
ML21081A13619 March 2021Response to Request for Additional Information for Alternative Request RR-05-06 - Inspection Interval Extension for Steam Generator Pressure-Retaining Welds and Full-Penetration Welded Nozzles
ML21035A2814 February 2021Revision to Emergency Plan - Report of Change
ML21034A5763 February 2021Request for Additional Information (e-mail Dated 1/3/2021) Alternative Request RR-05-06 Inservice Inspection Interval Extension for Steam Generator Weld Inspections
ML20312A00110 December 2020Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval
ML20312A00210 December 2020Relief Request for Limited Coverage Examinations Performed in the Third 10-Year Inservice Inspection Interval (EPID L-2020-LLR-0027 Through L-2020-LLR-0032)
ML20324A70319 November 2020Proposed License Amendment Request Measurement Uncertainty Recapture Power Uprate
ML20287A47120 October 2020Proposed Alternative RR-05-05 to the Requirements of the ASME Code Containment Unbonded Post-Tensioning System Inservice Inspection Requirements