Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML21146A183 | 27 May 2021 | Updated 2 Nextera - Duane Arnold Energy Center Loss of Offsite Power Due to Derecho Event Aug 2020 |
ML21146A056 | 27 May 2021 | Updated Nextera - Duane Arnold Derecho Event Aug 2020 |
ML21145A030 | 27 May 2021 | NextEra Energy - Duane Arnold Energy Center - Loss of Offsite Power Due to Derecho (August 2020) |
ML21078A178 | 30 March 2021 | Final of Enclosure 1 - 03/30/2021 |
ML21078A127 | 30 March 2021 | Final-LIC-504 Closure Memo - 03/30/2021 |
NG-21-0005, NextEra Energy Duane Arnold, LLC - Transmittal of the DAEC Defueled Safety Analysis Report Revision 0 | 29 March 2021 | NextEra Energy Duane Arnold, LLC - Transmittal of the DAEC Defueled Safety Analysis Report Revision 0 |
ML21067A520 | 10 March 2021 | ASP Report Transmittal Letter |
ML21042A079 | 17 February 2021 | DAEC Executive Summary of Risk Assessment of Derecho Impact on Duane Arnold |
ML21022A415 | 22 January 2021 | 8/10/2020 MD 8.3 Evaluation - Duane Arnold Energy Center - Loss of Offsite Power Event |
ML20315A117 | 25 December 2020 | DAEC-LIC504-Immediate-Determination-11-02 |
ML20346A045 | 16 December 2020 | Transmittal of Preliminary Duane Arnold Energy Center Accident Sequence Precursor Report (Licensee Event Report 331-2020-001-01) |
IR 05000331/2020003 | 6 November 2020 | Integrated Inspection Report 05000331/2020003 and 07200032/2020001 |
ML20300A225 | 31 October 2020 | NUREG-2236, Vol. 1, Confirmatory Thermal-Hydraulic Analysis to Support Specific Success Criteria in the Standardized Plant Analysis Risk Models-Duane Arnold, Chapters 1 to 8, Appendices a to C |
ML20239B045 | 24 August 2020 | (8-24-2020 FEMA Letter) Results of the Preliminary Capabilities Assessment for the Duane Arnold Energy Center |
PNO-III-20-002, Notice of Unusual Event and Unplanned Shutdown Greater than 72 Hours Due to Loss of Offsite Power from Severe Weather Event | 14 August 2020 | PNO-III-20-002: Notice of Unusual Event and Unplanned Shutdown Greater than 72 Hours Due to Loss of Offsite Power from Severe Weather Event |
NG-20-0028, License Amendment Request (TSCR-187): Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme | 15 May 2020 | License Amendment Request (TSCR-187): Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme |
ML22143B001 | 8 April 2019 | 2019 DAEC Ile Scenarios |
ML22144A071 | 22 February 2019 | 2019 DAEC Ile Proposed Scenarios |
NG-18-0138, NextEra Energy Duane Arnold, Llc'S Completion of Required Action for NRC Order Number EA-13-109, Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | 19 December 2018 | NextEra Energy Duane Arnold, Llc'S Completion of Required Action for NRC Order Number EA-13-109, Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions |
ML18292A566 | 30 November 2018 | Issuance of Amendment 308 to Upgrade Emergency Action Level Scheme for Duane Arnold Energy Center (DAEC) |
ML18212A232 | 26 July 2018 | Response to Request for Additional Information Regarding License Amendment Request (TSCR-166), Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. (Pa |
ML18212A231 | 26 July 2018 | Response to Request for Additional Information Regarding License Amendment Request (TSCR-166), Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. (Pa |
ML18108A310 | 12 April 2018 | NRR E-mail Capture - Audit at NextEra Headquarters, Juno Beach, Florida - April 24, 2018 Through April 26, 2018 - 50.69 LARs for Duane Arnold Energy Center (Daec), and Point Beach Nuclear Plant (Pbnp), Units 1 and 2 - EPIDs L-2017-LLA-0283/ |
ML17363A072 | 15 December 2017 | Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 2 of 2 |
ML17363A071 | 15 December 2017 | Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 1 of 2 |
NG-17-0235, Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 2 of 2 | 15 December 2017 | Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 2 of 2 |
NG-17-0235, Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 1 of 2 | 15 December 2017 | Attachment 1: Duane Arnold Energy Center, License Amendment Request TSCR-166, Redline Markup of NEI 99-01, Revision 6. Part 1 of 2 |
IR 05000331/2017002 | 2 August 2017 | NRC Integrated Inspection Report 05000331/2017002 |
ML17129A037 | 26 May 2017 | Safety Evaluation Regarding Implementation of Mitigation Strategies and Reliable Spent Fuel Pool Instrument Related to Orders EA-12-049 and EA-12-051 |
ML17157B675 | 22 May 2017 | Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
NG-17-0111, Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | 22 May 2017 | Duane Arnold Energy Center, Revision 24 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant |
IR 05000331/2017001 | 8 May 2017 | NRC Integrated Inspection Report 05000331/2017001 |
NG-16-0217, Notification of Full Compliance with Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Submittal of Final Integrated Plan | 7 December 2016 | Notification of Full Compliance with Order EA-12-049 Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and Submittal of Final Integrated Plan |
ML16248A001 | 13 September 2016 | Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 2 of Order EA-13-109 (Severe Accident Capable Hardened Vents) |
ML16210A008 | 30 August 2016 | Issuance of Amendment to Extend Containment Leakage Test Frequency |
ML16217A157 | 29 August 2016 | Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 |
NG-16-0076, Response to Request for Additional Information. License Amendment Request (TSCR-143) to Extend Containment Leakage Test Frequency | 14 April 2016 | Response to Request for Additional Information. License Amendment Request (TSCR-143) to Extend Containment Leakage Test Frequency |
IR 05000331/2015003 | 28 October 2015 | IR 05000331/2015003, July 1, 2015 Through September 30, 2015, Duane Arnold Energy Center - Integrated Report |
NG-15-0234, License Amendment Request (TSCR-143) to Extend Containment Leakage Test Frequency | 18 August 2015 | License Amendment Request (TSCR-143) to Extend Containment Leakage Test Frequency |
IR 05000331/2015001 | 4 May 2015 | IR 05000331/2015001; 01/01/2015 - 03/31/2015; Duane Arnold Energy Center; Maintenance of Emergency Preparedness and Occupational Dose Assessment |
ML15006A319 | 11 February 2015 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109 (Severe Accident Capable Hardened Vents) |
IR 05000331/2014004 | 3 November 2014 | IR 05000331/2014004; on 07/01/2014 - 09/30/2014; Duane Arnold Energy Center; Fire Protection; Maintenance Risk Assessments and Emergent Work Control; and Post Maintenance Testing |
NG-14-0151, NextEra Energy Duane Arnold, Llc'S Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.. | 25 June 2014 | NextEra Energy Duane Arnold, Llc'S Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.. |
IR 05000331/2014002 | 30 April 2014 | IR 05000331-14-002, on 01/01/2014 - 03/31/2014; Duane Arnold Energy Center, NRC Integrated Inspection Report |
ML14007A676 | 21 February 2014 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) |
ML14045A165 | 13 February 2014 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Duane Arnold Energy Center, TAC No.: MF1000 |
NG-13-0084, NextEra Energy Duane Arnold, Llc'S, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-1 | 28 February 2013 | NextEra Energy Duane Arnold, Llc'S, Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12- |
NG-13-0085, NextEra Energy-Duane Arnold, Llc'S Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Hardened Containment Vents (Order Number EA-12-050) | 28 February 2013 | NextEra Energy-Duane Arnold, Llc'S Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Hardened Containment Vents (Order Number EA-12-050) |
ML12107A153 | 13 April 2012 | NRR E-mail Capture - ME8251 - Duane Arnold - Preparations for Potential Bravo Diesel Generator LCO Extension TS 3.8.1 |
NG-12-0157, Response to Supplemental Request for Additional Information Amendment to Change Emergency Action Levels | 5 April 2012 | Response to Supplemental Request for Additional Information Amendment to Change Emergency Action Levels |