Semantic search
Jump to navigation
Jump to search
Site | Start date | Title | Description | |
---|---|---|---|---|
IR 05000250/2023003 | Turkey Point | 9 November 2023 | Integrated Inspection Report 05000250/2023003 and 05000251/2023003 | |
WBL-23-052, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual | Watts Bar | 8 November 2023 | Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual | |
IR 05000261/2023003 | Robinson | 7 November 2023 | Integrated Inspection Report 05000261 2023003 and 07200060 2023001 | |
ML23268A057 | Vogtle | 7 November 2023 | Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) | |
WBL-23-045, 10 CFR 50.59 Summary Report | Watts Bar | 7 November 2023 | 10 CFR 50.59 Summary Report | |
ML23310A051 | Callaway | 6 November 2023 | EIP-ZZ.OO1O1, Addendum 2, Revision 22, Emergency Action Level Technical Bases Document | |
ML23304A385 | 05200050 | 31 October 2023 | LLC Revision 1 to Standard Design Approval Application, Part 2, Chapter 19, Probabilistic Risk Assessment and Severe Accident Evaluation | |
ML23304A357 | 05200050 | 31 October 2023 | LLC Revision 1 to Standard Design Approval Application, Part 2, Chapter 10, Steam and Power Conversion System | |
ML23319A068 | Farley | 31 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features | |
ML23304A318 | 05200050 | 31 October 2023 | LLC, Revision 1 to Standard Design Approval Application, Part 2, Chapter 1, Introduction and General Description of the Plant |