ML20247D953

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 98-35 with Licensee on 980421 to Discuss Two Apparent Violations Involving Licensee Failure to Keep Unauthorized Individuals Out of Restricted Area & Licensee Failure to File NRC Form
ML20247D953
Person / Time
Issue date: 04/14/1998
From: Joustra J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
EA-98-161, NUDOCS 9805180156
Download: ML20247D953 (3)


Text

- ._ _ _ _ _ - _

p.

April 14.1998 i

> l EA No.98-161 MN No. 98-35 U.S. NUCLEAR REGULATORY COMMISSION REGION I L

NOTICE OF LICENSEE MEETING l

Name of Licensee: Thielsch Engineering, Inc.

Name of Facility: Bridgeport Resco Bridgeport, Connecticut I

Docket No.: 150-00038 l RI License No.: 3D-065-01 -

f Time and Da'e of Meeting: 1:00 p.m., April 21,1998

Location of Meeting
U.S. Nuclear Regulatory Commission Division of Nuclear Materials Safety Conference Room 475 Allendale Road l King of Prussia, PA 19406 l Purpose of Meeting: Pre-decisional Enforcement Conference to discuss two  ;

i apparent violations involving the licensee's failure to keep unauthorized individuals out of the restricted area and the I

licensee's failure to file NRC Form-241," Report of Proposed l Activities in Non-Agreement States," prior to engaging in l activities in a Non-Agreement State.

i NRC Attendees: A. Randolph Blough, Director, Division of Nuclear Materials Safety l Daniel J. Holody, Enforcement Officer Brad Fewell, Regional At ..rney Judy Joustra, Acting Branch Chief l Eric H. Reber, Health Physicist Licensee Attendees: Bruce MacLure, Laboratory Services Supervisor Tony Varrecchione, Business Manager r l David Duda, NDE Supervisor 9905100156 990414 PDR STPRO ESOCO PDR /

\/'

---__.----__--------__-.-.--_-.------.-a---_------____ - - - - - - - _ _ - - - - , - - - - _ _ _ _ _ - - - A

l .

l 2

Note: This Enforcement Conference is open to the public. Handicapped persons requiring assistance to attend or participate in the meeting should make their requests known to Eric H. Reber, U.S. Nuclear Regulatory Commission, Reg lon I,475 Allendale Road, King of Prussia, PA 19406, at (610) 337-5276, no later than five business days prior to the meeting. Attendance by other NRC personnel at this meeting should be made known by April 20,1998.

Prepared by: -

Eric H. Reber Health Physicist Approved b s J fy A. Joustra, Aqtipg Chief clear Materials Safety B anch 3 Distribution (Via E-Mail):

Hugh L. Thompson, Jr., DEDR James Lieberman, Director, OE Carl J. Paperiello, NMSS B. McCabe, Regional Coordinator, EDO Donald A. Cool, Director, NMSS Lerry Camper, NMSS A. Nicosia, OGC L. F. Davis, OGC I D. White, RI R. Bores, RI J. Brad Fewell, RI PAO,RI D. Holody, RI R. Blough, RI PMNS M. Campion J. Joustra, RI E. Rober, RI

[. -

L --_- _ -- ---- -_. -- - - - --. -

S t . .

3 Distribution: (Hard copy)

PUBLIC l

Al Receptionist DRM Secretary DRS Div Secretary DRP Div Secretary DNMS Div Secretary RA Secretary DRA Secretary PAO D. Holody, RI l D. White, RI B. Bores, RI M. Campion, RI State of Connecticut State of Rhode Island

)

)

i

)

l>

i i

l l

- _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ - -.m