PETEn E. Kurz Baltimore Gas and Electric Company Plant General Manager Calvert Cliffs Nuclear Power Plant Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4101 April 29,1999 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit No. 2; Docket No. 50-318 Reoort of Steam Generator Tube Plugging
REFERENCE:
(a)
Calvert Cliffs Unit 1 Technical Specifications 5.6.9.a As required by Reference (a), this letter reports the number of tubes plugged in the Calvert Cliffs Unit 2 steam generators during the recently completed Inservice inspection:
la the No. 21 Steam Generator a total of 253 tubes were plugged this outage. Prior to this outage
+
704 tubes had been plugged in the No. 21 Steam Generator. A total of 957 tubes in the No. 21 Steam Generator are now plugged.
In the No. 22 Steam Generator a total of 301 tubes were plugged this outage. Prior to this outage
+
443 tubes had been plugged in the No. 22 Steam Generator. A total of 744 tubes in the t
No. 22 Steam Generator are now plugged.
Should you have questions regarding this matter, we will be pleased to discuss them with you.
Very truly yours, l0
/
f
.,a y
PEK/GT/bjd cc:
R. S. Ffeishman, Esquire H. J. Miller, NRC q
J. E. Silberg, Esquire Resident Inspector, NRC S. S. Bajwa, NRC R. I. McLean, DNR A. W. Dromerick, NRC J. II. Walter, PSC 9905030190 990429 PDR ADOCK 050 3}7 G
>