Text
.
- cb "
Fetruary 5,1999 Mr. Charles H. Cruse Vice President-Nuclear Energy Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant-1650 Calvert Cliffs Parkway
- Lusby, MD 20657-4702
SUBJECT:
REVIEW OF LONG-TERM CORRECTIVE ACTION PLAN, DEGRADATION OF CONTAINMENT VERTICAL TENDONS (TAC NOS. MA1948 AND MA2042)
~
Dear Mr. Cruse:
The NRC staff has completed the review of the licensee's long-term corrective action plan related to the containment vertical tendons.
Based on the review of the licensee's sutettals, the staff finds that, in general, the procedure
' established for the long-term corrective action plan is reasonable However, the plan can be l
strengthened by (1) addog provisians to ensure the effectiveness of the short-term program in
{
preventing corrosion in the non-corroded tendons through detailed inspection, and (2) adding provisions to ensure the effectiveness of the long-term program (LTP) through frequent
' inspections subsequent to the completion of the LTP. The staffs evaluation is enclosed.
Sincerely, Original signed by:
' Alexander W. Dromanck, Senior Project Manager i
Project Directorate I-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-317 i
and 50-318
Enclosure:
Reviewof Long-Term Corrective Action Plan cc w/ encl: See next page
~ plSTRIBUTION:
)
Docket File.
S. Little i} C g-l PUBLIC A. Dromerick PDI-1 R/F OGC
'J. Zwolinski ACRS S. Bajwa 7 2 Olj G j C. Cowgill, RGNI DOCUMENT NAME: G:CC1-2\\LTRA1948.WPD To rec 2ive a copy of this clocument, indicate in the box:
"Cr a copy without attachment / enclosure "E" " Copy with rttachment/enetosure "W" = tio copy l OFFICE PM:PDj 1 l
LA:PDI 1
,J l
D:PDI 1 jz4h l
l
,a
-Iwame aDr ersweet stitti /P'h ss.1 m%
icaTE 02/ r799 oz/ 6 /99,V oz/ 6 /99 02/ /99 Ci-FICIAL RECORD COPY 9902160190 990205 PDR ADOCK 05000317 l-n yqq P
- g g j u
February 5,1999 Mr. Charles H. Cruse Vice President-Nuclear Energy p.
Baltimore Gas and Electnc Company j
Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702
SUBJECT:
REVIEW OF LONG-TERM CORRECTIVE ACTION PLAN, DEGRADATION OF CONTAINMENT VERTICAL TENDONS (TAC NOS. MA1948 AND MA2042)
Dear Mr. Cruse:
The NRC staff has completed the review of the licensee's long-term corrective action plan ;
related to the containment vertical tendons Based on the review of the licensee's submittals, the staff finds that, in general, the procedure established for the long-term corrective action plan is reasonable. However, the plan can be strengthened by (1) adding provisions to ensure the effectiveness of the short-term program in preventing corrosion in the non-corroded tendonc, through detailed inspection, and (2) adding provisions to ensure the effectiveness of the long-term program (LTP) through frequent inspections subsequent to the completion of the LTP. The staff's evaluation is enclosed.
Sincerely, Original signed by:
Alexander W. Dromerick, Senior Project Manager Project Directorate 1-1 Division of Reactor Projects - 141 Office of Nuclear Reactor Regulation Docket Nos. FJ'317 and 50-318
Enclosure:
Review of Long-Term Corrective Action Plan cc w/ encl: See next page DISTRIBUTION:
Docket File S. Little PUBLIC A. Dromerick PDI-1 R/F OGC J. Zwolinski ACRS S. Bajwa C. Cowgill, RGNI DOCUMENT NAME: G:CC12\\LTRA1948.WPD To rec 2ive a copy of this document, Indicate in the box:
"C=
Copy without ettechnent/ enclosure "E" s Copy with rttichmer t/ enclosure "N" a No copy 0FFICE-PM:PDj'1 l
LA PDI*1
,J l
D:PDI 1 M l
{
_a NAME ADreS r M p6fc SLittle /YWe-Stelue O'%
DATE 02/ r in 02/ 6 /99 k 02/ 6 /99 02/ /99 OFFICIAL RECORD COPY
@ rt:o p
h UNITED STATES J
s j
NUCLEAR REGULATORY COMMISSION 2
WASHINGTON, D.C. 20666 4001 February 5,1999 Mr. Charles H. Cruse Vice President-Nuclear Energy Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702
SUBJECT:
REVIEW OF LONG-TERM CORRECTIVE ACTION Pl.AN, DEGRADATION OF CONTAINMENT VERTICAL TENDONS (TAC NOS. MA1948 AND MA2042)
Dear Mr. Cruse:
The NRC staff has completed the review of the licensee's long-term corrective action plan related to the containment vertical tendons.
Based on the review of the licensee's submittals, the staff finds that, in general, the procedure established for the long-term corrective action plan is reasonable. However, the plan can be strengthened by (1) adding provisions to ensure the effectiveness of the short-term program in preventing corrosion in the non-corroded tendons through detailed inspection, and (2) adding provisions to ensure the effectivenes; of the long-term program (LTP) through frequent inspections subsequent to the compietion of the LTP. The staff's evaluation is enclosed.
Sincerely, e
Q.
Alexander W. Dromerick, Senior Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318
Enclosure:
Reviewof Long-Term Corrective Action Plan cc w/ encl: See next page
J l
Mr. Charles H. Cruse i
Baltimore Gas & Electric Company Calvert Cliffs Nuclear Power Plant l
I cc:
l President Mr. Joseph H. Walter, Chief Engineer Calvert County Board of Public Service Commission of Commissioners Maryland 175 Main Street Engineering Division Prince Frederick, MD 20678 6 St. Paul Centre Baltimore, MD 21202-6806 James P. Bennett, Esquire Counsel Kristen A. Burger, Esquire l
Baltimore Gas and Electric Company Maryland People's Counsel l
P.O. Box 1475 6 St. Paul Centre Baltimore, MD 21203 Suite 2102 Baltimore, MD 21202-1631 Jay E. Silberg, Esquire Shaw, Pittman, Potts, and Trowbridge Patricia T. Birnie, Esquire 2300 N Street, NW Co-Director Washington, DC 20037 Maryland Safe Energy Coalition P.O. Box 33111 Mr. Bruce S. Montgomery, Director Baltimore, MD 21218 NRM Calvert Cliffs Nuclear Power Plant Mr. Loren F. Donateli 1650 Calvert Cliffs Parkway NRC Technical Training Center Lusby, MD 20657-4702 5700 Brainerd Road Chattanooga, TN 37411-4017 Resident inspector U.S. Nuclear Regulatory.
Commission P.O. Box 287 St. Leonard, MD 20685 l
l Mr. Richard I. McLean, Manager l
Nuclear Programs Power Plant Research Program-Maryland Dept. of Natural Resources Tawes State Office Building, B3 Annapolis, MD 21401 Regional Administrator, Region i U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406
..