Notifies of Revised Schedule & Current Status of Preventive Maint Program.Program to Be Developed & Implemented within 13 Months of OL Issuance
ML19317F560
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/08/1978
From: Jeffery Grant
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
1-10, NUDOCS 8001150881
Download: ML19317F560 (1)


Text

_ __ _ _ _ _ _ _ _ _.

242 E_)

~

TOLEDO Docket No. 50-346

% EDISON February 8, 1978 JAMES S. GRANT v'ca ****

Serial No. 1-10 Energy Swoon (419) 259-5232 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Serial No. 278, In regard to our Mr. Lowell-- E. Roe's -letter,-dated May-17,1977, concerning- -

a preventive maintenance program-to be. developed within nine months of the issuance of the Operating-License-to insure-the-appropriate--

periodic-recalibration1f instruments used-to determineicompliance-with Technical Specifications, but whose calibration requirements-were not specifically delineated in the Technical Specifications, we wish to inform you that we have found it necessary to revise our schedule for the -completion-of our4reventive maintenance; program.-The current status of the. preventive maintenance program is as follows:-

The preventive-maintenance program-for electrical-equipment is _

completed and implemented.

The preventive maintenance-program for instrumentation is 55%

completed. Instrumentation is checked on a routine basis and calibration is being performed when it is apparent that there is a calibration problem.

The original schedule was not met due to the press of manpower and workload priorities, and the difficulty of not having a data base to schedule preven-tive maintenance.

Based upon our revised schedule, the preventive maintenance program will be developed and implemented within thirteen (13) months of the issuance of the Operating License.

Yours very truly,

.f FEB 131978 JSG/pm THE TOLECO EDISON COMPANY EDISCN PLAZA 300 MADISON AVENUE TCLECO, OHIO 43552 8001150 g g