Acuren USA, NRC Form 591M Part 1, Inspection Report 03038596/2018-001
ML18187A362
Person / Time
Site: 03038596
Issue date: 05/14/2018
From: VonEhr J E
NRC Region 4
To:
Acuren USA
References
IR 2018001
Download: ML18187A362 (2)


Text

NRC FORM 591M PART 1 (4-2008) 10 CFR 2.201 U.S. NUCLEAR REGULA TORY COMMISSION SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION

1. LICENSEE/LOCATION INSPECTED:

Acuren USA 600 E. 57th Place, Suite B Anchorage, Alaska REPORT NO.: 2018-001 2. NRG/REGIONAL OFFICE U.S. Nuclear Regulatory Commission Region IV, 1600 East Lamar Blvd Arlington, Texas 76011-4511

3. DOCKET NUMBER 030-38596
4. LICENSE NUMBER 50-32443-01
5. DATE($) OF INSPECTION May 14, 2018 LICENSEE:

The inspection was an examination of the activities conducted under your license as they relate to radiation safety and to compliance with the Nuclear Regulatory Commission (NRC) rules and regulations and the conditions of your license. The inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

The inspection findings are as follows: D D D 1. Based on the inspection findings, no violations were identified.

2. Previous violation(s) closed. 3. The violations(s), specifically described to you by the inspector as non-cited violations, are not being cited because they were identified, non-repetitive, and corrective action was or is being taken, and the remaining criteria in the NRC Enforcement Policy to exercise discretion, were satisfied.

D Non-Cited Violation(s) was/were discussed involving the following requirement(s) and Corrective Action(s):

4. During this inspection certain of your activities, as described below and/or attached, were in violation of NRC requirements and are being cited. This form is a NOTICE OF VIOLATION, which may be subject to posting in accordance with 1 O CFR 19.11. Licensee's Statement of Corrective Actions for Item 4, above. I hereby state that, within 30 days, the actions described by me to the inspector will be taken to correct the violations identified.

This statement of corrective actions is made in accordance with the requirements of 1 O CFR 2.201 (corrective steps already taken, corrective steps which will be taken, date when full compliance will be achieved).

I understand that no further written response to NRC will be required, unless specifically requested.

Title Printed Name Signature Date LICENSEE'S REPRESENTATIVE NRCINSPECTOR BRANCH CHIEF NRC FORM 591 M PART 1 J. vonEhr Michael C. Hay D Non-Public D Sensitive

-Security-Related 0 Non-Sensitive From: To: Cc:

Subject:

Date: Chris Dixon YooEbr Jason bkarie@acuren.com; "Justin Orth" [External_Sender]

Re: NRC Inspection of Acuren USA and Closure of 2017 Unresolved Item Tuesday, July 03, 2018 12:02: 12 PM Good Afternoon Mr. VonEhr, Please accept this as confirmation of receipt, and thank you for the time you spent with us to work through this issue. Chris Dixon Director of Radiation Labs/ AK/East Acuren Inspection Inc. On Jul 3, 2018 12:56 PM, "VonEhr, Jason" <Jason.VonEhr@nrc.gov>

wrote: All, I'd like to thank each of you for your time either during the on-site inspection in Anchorage on May 14, 2018, or during the subsequent conversations and email back-and-forth regarding the instadose issue. As I briefly discussed with Mr. Karie and Mr. Dixon today, the NRC has determined that no violations were identified during the 2018 inspection.

The attached NRC Inspection Report (NRC Form 591 M) documents the results of the inspection.

This does not require you to take any action and you are not required to sign it or return it. I do however request a ) courtesy email response from one of you acknowledging receipt. With regards to the Unresolved Item (use of Mirion's lnstadose DIS dosimetry) from March 2017, the NRC has determined that Acuren USA has met the criteria provided in the Enforcement Guidance Memorandum 18-001, dated May 11, 2018. Therefore, while the NRC acknowledges that a violation occurred, the EGM allows the NRC to use enforcement discretion to not cite the violation.

The letter closing the Unresolved Item is currently in-review, and will be issued separately from the 2018 inspection attached.

If you have any questions or concerns, please do not hesitate to contact me, Jason vonEhr Health Physicist