Title | Control Release of Radioactive Material and Accident Mitigation |
Event Description | On February 9, 2021, at 0153 CST, Cooper Nuclear Station experienced a spike in Secondary Containment differential pressure which exceeded the Technical Specifications Surveillance Requirements 3.6.4.1.1 limit of -0.25 inches of water gauge. Secondary Containment differential pressure oscillated coincident with barometric pressure oscillations. Three additional spikes occurred which exceed the Technical Specification limit. The duration of each spike was less than one minute. The last spike occurred at 0232 CST. Secondary Containment differential pressure has restored to Technical Specification limits and further investigation is ongoing.
This unplanned Secondary Containment inoperability constitutes a condition reportable under 10CFR50.72(b)(3)(v)(C) and (D), "An event or condition that at the time of discovery could have prevented the fulfillment of the safety function of [Structures, Systems, and Components] SSCs that are needed to control the release of radioactive material and mitigate the consequences of an accident. The NRC Senior Resident Inspector has been informed. |
Where | |
---|---|
Cooper Nebraska (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material | |
Time - Person (Reporting Time:+2.7 h0.113 days <br />0.0161 weeks <br />0.0037 months <br />) | |
Opened: | Aric Harris 10:35 Feb 9, 2021 |
NRC Officer: | Joanna Bridge |
Last Updated: | Feb 9, 2021 |
55098 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 55098\u003C/a\u003E - \u003Ca href=\"/Cooper\" title=\"Cooper\"\u003ECooper\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EControl Release of Radioactive Material and Accident Mitigation\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 55098 - Cooper\n","link":"","lat":40.359658333333336,"lon":-95.65465277777778,"icon":"/w/images/7/79/Entergy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_55098&oldid=3158777"