ENS Event | |
---|---|
06:20 Apr 13, 2015 | |
Title | Manual Reactor Scram Initiated |
Event Description | Following a pre-planned scram for entry into the U2 Refueling Outage, the 'B' Reactor Protection system (RPS) was unable to be reset due to a deficiency with the '2H' Intermediate Range Power Monitor. Due to this failure to reset RPS, a manual full scram was initiated as required by plant procedures.
The licensee notified the NRC Resident Inspector. |
Where | |
---|---|
Limerick Pennsylvania (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+3.6 h0.15 days <br />0.0214 weeks <br />0.00493 months <br />) | |
Opened: | Dan Williamson 09:56 Apr 13, 2015 |
NRC Officer: | Donald Norwood |
Last Updated: | Apr 13, 2015 |
50981 - NRC Website | |
Unit 2 | |
---|---|
Reactor critical | Not Critical |
Scram | No |
Before | Hot Shutdown (0 %) |
After | Hot Shutdown (0 %) |
WEEKMONTHYEARENS 511682015-06-21T20:25:00021 June 2015 20:25:00
[Table view]10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Secondary Containment Isolation ENS 509812015-04-13T06:20:00013 April 2015 06:20:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Scram Initiated ENS 489362013-04-17T01:42:00017 April 2013 01:42:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Specified System Actuation During Turbine Stop Valve Logic Testing While Shutdown ENS 481212012-07-19T19:37:00019 July 2012 19:37:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Protection Signal Actuation Due to Changing Mode Switch Position During Surveillance Testing ENS 478882012-05-02T11:24:0002 May 2012 11:24:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Initiation of Secondary Containment Isolation ENS 469062011-05-30T15:50:00030 May 2011 15:50:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Specified System Actuation - Manual Reactor Scram Due to Dual Recirc Pump Trip During Startup ENS 449482009-03-31T22:50:00031 March 2009 22:50:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Diesel Start Signal Received During Maintenance Testing of Diesel ENS 438982008-01-12T14:04:00012 January 2008 14:04:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Specified System Actuation During Edg Governor Testing ENS 433152007-04-24T06:10:00024 April 2007 06:10:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Automatic Reactor Scram with Eccs Injection on Lowering Reactor Vessel Water Level ENS 432312007-03-13T11:30:00013 March 2007 11:30:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Low Main Condenser Vacuum Isolation Signal Received During Plant Shutdown ENS 421932005-12-09T14:01:0009 December 2005 14:01:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Trip of a Startup Bus Breaker Results in Start of Emergency Diesel Generators ENS 415732005-04-06T21:55:0006 April 2005 21:55:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Partial Loss of Offsite Power Resulting in Autostart of Emergency Diesel Generators 2015-06-21T20:25:00 | |