ENS 46194
ENS Event | |
---|---|
15:00 Aug 21, 2010 | |
Title | Flood Barriers Needed to Protect Safety Related Equipment Missing |
Event Description | On August 21, 2010 an inspection of the Air Intake Tunnel (AIT) sump identified missing flood barriers needed to protect safety related equipment in the plant. If enough flood water had entered into the AIT, water could have entered into the Auxiliary Building (AB) through the ventilation ductwork that connects the AIT and the AB. If flood water continued to enter the AB, then safety related equipment in the AB could have been affected.
This condition could have resulted in the unavailability of equipment in the Auxiliary Building including the 1A and 1B Decay Heat pumps, the 1A and 1B Building Spray pumps and 1A, 1B and 1C Make-up Pumps. This is reportable as an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> ENS notification under 10CFR50.72(b)(3)(v)(B) and 10CFR50.72(a)(1)(ii) as a condition that at the time of discovery could have prevented the fulfillment of the safety function of structures or systems that are needed to remove residual heat. Flood protection barriers have been established for the affected penetrations. Inspections of the flood protection barriers are ongoing. Further engineering review is being performed to determine the impact of the potential water intrusion into the AIT and AB. The licensee notified the NRC Resident Inspector. The licensee will notify the Pennsylvania Bureau of Radiation Protection.
EN# 46194 made on August 21, 2010 at 1100 EDT is being retracted. Upon further Engineering review it was determined that the external flood barrier design deficiency in the Air Intake Tunnel (AIT) did not result in a condition that could have prevented the fulfillment of the safety function needed to remove residual heat. The AIT sump pump is in the cavity that had the degraded barrier where the in leakage of concern enters through conduits from yard electrical vaults. This pump starts automatically and has capacity in excess of the in leakage during the Probable Maximum Flood (PMF). The AIT sump pump's functional capability was confirmed to be available over the past three years. Therefore the ability to prevent flood water from the AIT reaching and impacting safety related equipment needed to remove residual heat was maintained. The event is therefore NOT reportable. The Licensee has notified the Resident Inspector. Notified R1DO. |
Where | |
---|---|
Three Mile Island Pennsylvania (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat | |
Time - Person (Reporting Time:+-3.32 h-0.138 days <br />-0.0198 weeks <br />-0.00455 months <br />) | |
Opened: | Clint Six 11:41 Aug 21, 2010 |
NRC Officer: | Donald Norwood |
Last Updated: | Oct 14, 2011 |
46194 - NRC Website | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 481792012-08-10T16:30:00010 August 2012 16:30:00
[Table view]10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat Flood Barrier Seals Could Not Be Verified Installed ENS 461942010-08-21T15:00:00021 August 2010 15:00:00 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat Flood Barriers Needed to Protect Safety Related Equipment Missing ENS 454642009-10-23T21:41:00023 October 2009 21:41:00 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat Steam Generator Safety Relief Valves Did Not Open at Required Setpoint 2012-08-10T16:30:00 | |