LER-2009-001, Technical Specification 3.0.3 One Hour Exceeded Due to Failure of Group Step Counters
Docket Numbersequential Revmonth Day Year Year Month Day Yearnumber No.
Event date: 03-17-2009
Report date: 07-19-2009
Reporting criterion: 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
3232009001R00 - NRC Website

I. Plant Conditions

Unit 2 was in Mode 1 (Power Operation) at approximately 100 percent reactor power.

II. Description of Problem

A.�Background:

The Diablo Canyon Power Plant (DCPP) Unit 2 is a Pressurized Water Reactor (PWR) with 53 shutdown and control rods [AA] designed and provided by the Nuclear Steam Supply System (NSSS) vendor, Westinghouse. The control and shutdown rods are arranged into 4 control rod banks (A through D) and 4 shutdown rod banks (A through D).

Technical Specification (TS) 3.1.7, "Rod Position Indication," Limiting Condition for Operation (LCO) requires that "The Digital Rod Position Indication (DRPI) System and the Demand Position Indication System shall be OPERABLE" in "MODES 1 and 2." TS 3.1.7, Note, states; "Separate Condition entry is allowed for each inoperable rod position indicator and each demand position indicator." TS 3.1.7, Action D, requires that with "One demand position indicator per bank inoperable for one or more banks, verify the most withdrawn rod and the least withdrawn rod of the affected banks are 12 steps apart, AND verify by administrative means all DRPIs for the affected banks are OPERABLE once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, OR reduce THERMAL POWER to 50% RTP" within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />." TS 3.1.7 does not explicitly state an Action for two group step counters per bank inoperable, although Bank "B" has two indicators.

TS 3.1.7, Action D.1.1 and D.1.2 Bases, states: "With one demand position indicator per bank inoperable, the rod positions can be determined by the DRPI System. Since normal power operation does not require excessive movement of rods, verification by administrative means that the rod position indicators are OPERABLE and the most withdrawn rod and the least withdrawn rod are Completion Time of once every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> is adequate.

TS 3.1.7, Action E.1 Bases, states: "If the Required Actions cannot be completed within the associated Completion Time, the plant must be brought to a MODE in which the requirement does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

The allowed Completion Time is reasonable, based on operating experience, for reaching the required MODE from full power conditions in LICENSEE EVENT REPORT (LER) TEXT CONTINUATION FACILITY NAME (1) DOCKET NUMBER (2) LER NUMBER (6) PAGE (3) an orderly manner and without challenging plant systems.

Technical Specification, LCO 3.0.3 states in part: "When ... an associated ACTION is not provided, ... the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:

a. MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />; b. MODE 4 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and c. MODE 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />...

Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.

The Control Rod Banks provide a movable, thermal and epithermal neutron absorber for core reactivity control and shutdown capability.

The shutdown banks insert negative reactivity for reactor shutdown during all credible events. The shutdown banks have no other functions. The shutdown banks are withdrawn first during reactor startups. All of the shutdown banks are withdrawn one bank at a time. Their withdrawal adds positive reactivity to the reactor. When fully withdrawn, these banks provide the ability to quickly add a large amount of negative reactivity to the reactor, causing it to shutdown. The amount of negative reactivity necessary to shut down the reactor during postulated accidents determined the number of control rods in each shutdown bank.

The axial position of shutdown rods and control rods are determined by two separate and independent systems: the Bank Demand Position.

Indication (BDPI) System (commonly called group step counters) and the DRPI System.

The BDPI System counts the pulses from the Rod Control System that move the rods. There is one step counter [CTR] for each group of rods.

Individual rods in a group all receive the same signal to move and should, therefore, all be at the same position indicated by the group step counter for that group. The BDPI System is considered highly precise (plus or minus 1 step or plus or minus 5/8 inch). If a rod does not move one step for each demand pulse, the step counter will still count the pulse and incorrectly reflect the position of the rod.

The purpose of the BDPI is to provide indication of the position demanded of the rod banks and rod groups of the Rod Control System. Because each rod in a given group receives the same motion-governing signals, LICENSEE EVENT REPORT (LER) TEXT CONTINUATION FACILITY NAME (1) DOCKET NUMBER (2) LER NUMBER (6) demand position is normally indicative of true rod position. However, if a rod does not move when demanded by the Rod Control System (it is stuck or dropped) then demanded position will no longer reflect actual rod position.

The purpose of the group step counters is to count the number of demanded steps for each of the 14 rod groups (both control and shutdown banks). Each group step counter has three digits, which indicate the net number of 5/8 inch steps demanded to that group, as referenced to withdrawal from the fully inserted position. This indication can be manually advanced in the positive or negative direction by depressing the UP or DOWN pushbuttons. The three digit control board display is powered by two 3 Volt Direct Current (VDC) lithium batteries, for a nominal 6 VDC. The display is designed to flash off and on when the battery voltage is less than 4.2 VDC. The indicators have been tested to function with one of the two batteries removed, or as low as 3 VDC.

The plant computer counts the demanded up and down step signals for each rod bank. It also receives individual rod position indication for all 53 control rods from DRPI. The plant. computer then compares the position of the individual rod to its bank position and causes an annunciator to alarm if the individual rod is greater than 12 steps from its bank, if any shutdown bank demand or DRPI indicates less than 225 steps, and if any control bank demand indicates improper sequence (bank overlap).

B.� Event Description On February 18, 2009, the group step counter for Bank "B," Group I, was identified as blinking, indicating a degraded condition (voltage less than 4.2 VDC).

On March 8, 2009, the group step counter for Bank "B," Group I, stopped blinking and the screen went blank. Plant operators entered TS 3.1.7, Action D1.1, to "Verify by administrative means all DRPIs for the affected banks are OPERABLE," and, Action D.1.2, to "Verify the most withdrawn rod and the least withdrawn rod of the affected banks are once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

On March 17, 2009, at 08:10 PDT, licensed plant operators at the controls questioned the validity of the group step counter for Bank "B," Group II, due to a dimly lit and blinking display.

On March 17, 2009, at 08:25 PDT, plant operators declared the Bank "B," LICENSEE EVENT REPORT (LER) TEXT CONTINUATION FACILITY NAME (1) DOCKET NUMBER (2) LER NUMBER (6) PAGE (3) Group II, group step counter inoperable and entered TS 3.0.3.

On March 17, 2009, between 08:36 PDT and 09:25 PDT utility control technicians responded to the control room to implement maintenance activities to replace the BDPI System group step counter batteries.

On March 17, 2009, at 09:40 PDT, plant operators completed a crew brief in preparation for a reactor power reduction ramp to begin not later than 10:30 PDT due to the group step counter display indication failures.

On March 17, 2009, at 10:18 PDT, following the successful replacement of one Bank "B" group step counter with new batteries, plant operators exited TS 3.0.3 and re-entered TS 3.1.7, Action D.

On March 17, 2009, at 11:11 PDT, following the successful replacement of a second Bank "B" group step counter with new batteries, plant operators exited TS 3.1.7, Action D.

On June 18, 2009, based upon questions from the NRC Resident Inspector, this event was determined to be reportable due to the.TS 3.0.3 1-hour LCO condition being exceeded and preparations having been initiated by plant operators to implement a power reduction.

C. Status of Inoperable Structures, Systems, or Components that Contributed to the Event BDPI System, Bank "B," Group I, group step counter was declared inoperable on March 8, 2009. BDPI System, Bank "B," Group II, was declared inoperable on March 17, 2009, at 08:25 PDT.

D. Other Systems or Secondary Functions Affected No additional safety systems were adversely affected by this event.

E. Method of Discovery The BDPI System group step counter display is a primary indicator of reactor rod position provided in the control room on the reactor control operator's console. DCPP licensed plant operators at the controls identified the changes of indication promptly as noted in this report.

LICENSEE EVENT REPORT (LER) TEXT CONTINUATION FACILITY NAME (1) DOCKET NUMBER (2) LER NUMBER (6) PAGE (3)

F. Operator Actions

Utility licensed plant operators maintained Unit 2 in Mode 1 at normal operating temperature and pressure during this event.

Plant operators entered TS 3.0.3 during this event due to the inoperability of indications provided in the control room for the BDPI System Bank "B," Groups I and II, group step counters, for which TS 3.1.7. does not provide a condition or action.

G. Safety System Responses

No safety systems were required to respond.

III.� Cause of the Problem

A. Immediate Cause

The BDPI System group step counter display batteries reached their end­ of-service-life. Variation in group step counter current draw depleted the batteries in a shorter time period than predicted, resulting in prompt replacement being required.

B. Root Cause

The operational cause of this event was lack of operator awareness of the potential TS 3.0.3 implications of a second group step counter failure.

The maintenance related cause of this event was variation in group step counter current draw that depleted the batteries in a shorter time period than predicted resulting in prompt replacement being required.

The maintenance scheduling cause of the event was inappropriate maintenance priority to replace batteries prior to failure and lack of pre­ planned maintenance work orders to quickly respond to on-line failures.

IV.� Assessment of Safety Consequences There were no safety consequences as a result of this event.

The purpose of the shutdown banks is to insert negative reactivity for reactor shutdown during all credible events. The shutdown banks have no other functions. The shutdown banks are withdrawn first during reactor startups. The LICENSEE EVENT REPORT (LER) TEXT CONTINUATION FACILITY NAME (1) DOCKET NUMBER (2) 'LER NUMBER (6) PAGE (3) ability of the, shutdown bank rods to release upon a reactor trip signal initiation and fall bygravity into the reactor core to assure a shutdown was not adversely affected by this event.

The Unit 2 reactor was maintained in Mode 1 at stable pressure and temperature during this event with reactor trip breaker equipment operable; thus, any at-power accident conditions postulated in the Final Safety Analysis Report Update were unchanged.

The nonconforming condition could not have led to an operator error or rod misalignment, as the shutdown banks were maintained fully withdrawn from the reactor core with computer monitoring alarms available throughout the event.

Therefore, the event is not to be considered risk significant and it did not adversely affect the health and safety of the public.

V.�Corrective Actions

A. Immediate Corrective Actions

Plant operators entered TS 3.0.3 and maintained Unit 2 in Mode 1 at approximately 100 percent reactor power during the replacement of the group step counters with new batteries installed. This event was entered into the DCPP corrective action program for resolution.

B. Corrective Actions to Prevent Recurrence (CAPR).

DCPP will revise the operators turnover checklist In OP1.DC37 to require a TS review for the potential TS 3.0.3 or other short (less than one shift) TS action shutdown if an additional failure were to occur.

DCPP will revise operating procedure OP1.DC17 attachments regarding TS sheet initiation and verification to review a condition being entered for potential TS 3.0.3 or other short (less than one shift) TS Action. When the potential is identified, the shift manager (SM) is to verify appropriate priority for condition resolution and include the item in the SM turnover in the control room.

DCPP will replace the older group step counters on an expedited schedule during the next routine scheduled refueling outage(s).

DCPP maintenance will update a contingency replacement order for prompt on-line replacement of the group step counters.

LICENSEE EVENT REPORT (LER) TEXT CONTINUATION FACILITY NAME (1) DOCKET NUMBER (2) LER NUMBER (6) PAGE (3) DCPP maintenance priority for group step counter battery replacement will be revised to reflect actual battery service life experience.

VI.AAdditional Information

A. Failed Components

Generic Battery:

A3 VDC Lithium "C" Cell DCPP Part Number 76-8495.

B. Previous Similar Events

None.

C. Industry Reports None.