| Q | CCA | Title |
---|
05000010/FIN-2012012-01 | 2012Q4 | | Failure to provide complete and accurate decommissioning status reports |
05000237/FIN-2012005-01 | 2012Q4 | P.3 | Failure To Follow Cold Weather Initiating Procedure |
05000237/FIN-2012005-02 | 2012Q4 | H.8 | Failure to Post Protected Pathway Signs for a Red Risk Path System |
05000237/FIN-2013002-02 | 2013Q1 | P.6 | Deficiency In Abnormal Operating Procedures for Site Response to External Flooding Events |
05000237/FIN-2013002-01 | 2013Q1 | P.3 | Failure to Include Adequate Acceptance Criteria in a Surveillance Test |
05000237/FIN-2013407-01 | 2013Q1 | | Apparent violation for failure to report Senior reactor Operator (SRO) for aberrant behavior |
05000237/FIN-2013007-01 | 2013Q2 | | Adequate Voltage not Assured for EDG Air Start Solenoid Valve |
05000237/FIN-2013007-02 | 2013Q2 | | Non-conservative Sizing Calculation for Target Rock SRV Air Accumulators |
05000237/FIN-2013007-03 | 2013Q2 | | Failure to Ensure Functionality of HPCI Steam Supply Valve during an ATWS |
05000237/FIN-2013007-04 | 2013Q2 | | Failure to Ensure Isolation Condenser Would Perform Its Safety-Related Function Under Design Conditions |
05000237/FIN-2013203-01 | 2013Q2 | H.7 | Security |
05000237/FIN-2013007-05 | 2013Q2 | | Failure to Provide Complete and Accurate Information on the Isolation Condenser when ITS was Submitted |
05000237/FIN-2013004-01 | 2013Q3 | | Failure to Update the UFSAR for Reactor Water Cleanup Design Changes |
05000237/FIN-2013004-02 | 2013Q3 | | Potential Non-ASME Code Section XI Repair on Unit 2 Containment Cooling Service Water 16 Line |