- DCL-15-027, Diablo Canyon Power Plant Er Changes Reflected in the Environmental Report Update Amendment 2. Part 8 of 9 (← links)
- DCL-10-028, Diablo Canyon, Units 1 and 2, Attachment 5 to DCL-10-028, Summary Statement of Diablo Canyon Power Plant PRA Model Capability for Use in TS 3.8.1 Completion Time Extension Submittal (← links)
- ML100710753 (← links)
- ML100050034 (← links)
- NL-09-1510, Vogtle Electric Generating Plant, Units 1 and 2 - Inservice Inspection Plan Third Inspection Interval Volume 1, Version 3.0 (← links)
- ML093370309 (← links)
- ML092440433 (← links)
- ML090020097 (← links)
- ML082550700 (← links)
- AEP-NRC-2016-83, Emergency License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating (← links)
- NL-12-1344, License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (Rmts) Guidelines. (← links)
- L-10-025, 10 CFR 503.55a Requests for Alternative Non-Destructive Examination Requirements for ASME Class 1 and Class 2 Piping Components (← links)
- RS-10-030, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) (← links)
- RS-10-029, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (← links)
- RS-09-121, License Amendment Request for a One-Time Extension of the Essential Service Water Train Completion Time (← links)
- NL-09-0332, Request for Approval of Risk-Informed/Safety Based Inservice Inspection Alternative for Class 1 & 2 Piping, VEGP-ISI-ALT-02, Version 1 (← links)
- RS-08-160, Third 10-Year Inservice Inspection Interval, Relief Request 1313-01, Request for Relief for Alternate Risk-Informed Selection and Examination Criteria for Examination Category B-F, B-J, C-F-1, and C-F-2 Pressure . (← links)
- LR-N09-0214, Stations, Unit 1 - License Amendment Request for One-Time Extension of the Type a Test Interval (← links)
- CP-201500244, Relief Request 2A3-1 for Inservice Inspection for Application of an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Examination Requirements for Class 1 and 2 Piping Welds (2007 Edition of ASME Code. (← links)
- DCL-15-027, Er Changes Reflected in the Environmental Report Update Amendment 2. Part 8 of 9 (← links)
- CP-201100356, Relief Request A-1 for Unit 1 Inservice Inspection for Application of an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Examination Requirements for Class 1 and 2 Piping Welds (Third Interval....) (← links)
- CP-201101031, Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 0 (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2010, Third Interval) (← links)
- ULNRC-05598, Proposed Revision to Technical Specification 5.5.16 Containment Leakage Rate Testing Program, (License Amendment Request LDCN 09-0008) (← links)