Pages that link to "TXX-6850"
← TXX-6850
Jump to navigation
Jump to search
The following pages link to TXX-6850:
Displayed 2 items.
- TXX-6955, Interim Deficiency Rept CP-87-100 Re Containment Piping Penetrations Which Lack Overpressure Protection.Initially Reported on 870910.Thermal Relief Valves Will Be Installed in Affected Piping.Next Rept Will Be Submitted by 880301 (← links)
- TXX-6850, Interim Deficiency Rept CP-87-100 Re Three Containment Isolation Penetrations That May Lack Relief Protection. Initially Reported on 870910.Evaluation Continuing.Next Rept Will Be Submitted by 871211 (← links)