Pages that link to "TXX-6165, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed in Accordance W/Design Documents.Initially Reported on 860918. Field Verification Effort Complete & Engineering Evaluation in Progress.Next Rept Will Be Submitted by 870212"
Jump to navigation
Jump to search
The following pages link to TXX-6165, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed in Accordance W/Design Documents.Initially Reported on 860918. Field Verification Effort Complete & Engineering Evaluation in Progress.Next Rept Will Be Submitted by 870212:
Displayed 2 items.
- ML20212D211 (redirect page) (← links)
- TXX-6165 (redirect page) (← links)
- TXX-6521, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed in Accordance W/Design Documents.Initially Reported on 870918. Complete Evaluation Will Be Performed.Next Rept Will Be Submitted by 870915 (← links)
- TXX-6438, Interim Deficiency Rept CP-85-39 Re Failure to Install Equipment Conduit in Accordance W/Design Documents.Initially Reported on 860918.Evaluation of Condition Underway.Next Rept Will Be Submitted by 870622 (← links)
- TXX-6165, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed in Accordance W/Design Documents.Initially Reported on 860918. Field Verification Effort Complete & Engineering Evaluation in Progress.Next Rept Will Be Submitted by 870212 (← links)
- TXX-6278, Interim Deficiency Rept CP-85-39 Re Equipment Conduit Not Installed in Accordance W/Design Documents.Initially Reported on 860918.Evaluation of Sample Results Adequacy to Entire Cable Population in Progress.Next Rept by 870515 (← links)