Pages that link to "NRC Form se6A"
Jump to navigation
Jump to search
The following pages link to NRC Form se6A:
Displayed 7 items.
- 05000382/LER-1989-014, :on 890718,discovered That Plant Operated in Condition Prohibited by Tech Specs Re Cooling Water Valves. Caused by Inadequate Review of ASME Section Xi.Concluded That Valves Operable (← links)
- 05000440/LER-1986-057, :on 860903,containment Isolation Valves Not Deactivated in Closed Position.Caused by Failure of Nonconformance Rept Program to Require Routing of Environ Qualification Deficiencies to Control Room.Program Revised (← links)
- 05000266/LER-1998-006, :on 980122,unanticipated Partial Svc Water Sys Isolation During Special Test Occurred.Caused by Inadequate Test Procedure.Procedure PBTP-77 Will Be Archived W/ Documentation of Deficiencies (← links)
- 05000348/LER-1999-002-02, :on 990527,Unit 1 Reactor Trip Occurred Following Loss of 1A SG Feedwater Pump.Caused by Personnel Error.Unit Was Stabilized in Hot Standby.With (← links)
- 05000425/LER-1995-002, :on 950226,SG Pressures Lowered & SG Water Level Began to Increase,Reaching high-high Setpoint & Initiated Automatic FW Isolation.Caused by leak-by on Sg. Limit Switches Properly Set (← links)
- 05000366/LER-1994-005, :on 940423,Full RPS & Partial Group 2 PCIS Actuation Occurred.Caused by Inadvertent Action on Part of I&C Technician.Rps Signal Reset & Affected Sys Returned to Lineups Required for Plant Conditions (← links)
- 05000285/LER-1993-008, :on 930520,determined That TS SR Not Satisfied for Stack Flow Indicator,Per Amend 137 Issued on 910307. Caused by Lack of Attention to Detail.Calibr & Functional Test Procedures Developed (← links)