Pages that link to "AECM-83-0759, Final Part 21 Rept PRD-83/16 for Unit 1 & Interim Part 21 Rept for Unit 2 Re Failure of Internal Coating of Automatic Depressurization Sys,Main Steam Safety Relief Valve & MSIV Accumulators.Final Rept Expected by 840531"
Jump to navigation
Jump to search
The following pages link to AECM-83-0759, Final Part 21 Rept PRD-83/16 for Unit 1 & Interim Part 21 Rept for Unit 2 Re Failure of Internal Coating of Automatic Depressurization Sys,Main Steam Safety Relief Valve & MSIV Accumulators.Final Rept Expected by 840531:
Displayed 12 items.
- 05000416/LER-1982-072, Forwards LER 82-072/01T-0 (← links)
- ML20070H209 (← links)
- ML20082F121 (redirect page) (← links)
- AECM-85-0245, Responds to 850615 Request for Addl Info Re long-term Automatic Depressurization Sys Air Supply Makeup Connection, Per NUREG-0737,Item II.K.3.28.Access to Air Supply Connection Will Be Through Exterior Door 1A316 (← links)
- AECM-85-0030, Forwards Addl Info Requested During 841206 Telcon Re Design & Operation of Automatic Depressurization Sys (ADS) Accumulators & Related Air sys.Long-term ADS Pneumatic Supply Makeup Connection Located in Auxiliary Bldg (← links)
- AECM-83-0759 (redirect page) (← links)
- AECM-83-0672, Provides Addl Info Re Qualification of Automatic Depressurization Sys (ADS) Accumulator & Related Air Sys,In Response to .Ads Leak Test Frequency of 18 Months Anticipated (← links)
- AECM-82-581, Confirms Installation of Mechanical Pressure Gauge on Automatic Depressurization Sys Air Makeup Line & Performance of Associated Surveillance (← links)
- AECM-83-0179, Interim Deficiency Rept Re Installation of Noncorrosion Resistant Matl for Instrument Air Pipe Penetrations. Initially Reported on 830315.Design Change Will Be Implemented.Also Reported Per Part 21 (← links)
- AECM-82-528, Forwards Addl Info Re Instrument Air Quality,In Support of NRC Review of Util Response to NUREG-0737,Item II.K.3.28. Proposed Tech Specs & Design Details Will Be Provided 4 Months Prior to Startup Following First Refueling Outage (← links)
- AECM-82-510, Outlines Commitments Made During 821025 Telcon Re Design & Testing of Automatic Depressurization Air Sys.Integrated Leak Test on Sys Will Be Performed Every 18 Months. Justification for Interim Operation Listed (← links)
- AECM-82-490, Submits Addl Info Re Design & Testing of Automatic Depressurization Sys Air Sys,Including Response to NUREG-0737,Item II.K.3.28,air Sys Testing & Air Sys Makeup Provisions.Revision to FSAR Subsection 18.1.30.12 Encl (← links)