Pages that link to "3N1097-40"
Jump to navigation
Jump to search
The following pages link to 3N1097-40:
Displayed 2 items.
- 3F0898-01, LAR 235,rev 0 to License DPR-72,proposing New Repair Process for Plant Otsgs.Technical Basis for Repair Roll Process Proposed by LAR Is Contained in BAW-2303P,Rev 3 (← links)
- 3F0498-02, Application for Amend to License DPR-72,clarifying Improved Tech Specs 5.7.2, Special Repts, to State That Complete Results of OTSG Tube Inservice Insp Shall Be Submitted to NRC 90 Days After Startup (Breaker Closure) (← links)