Pages that link to "3F0494-09"
Jump to navigation
Jump to search
The following pages link to 3F0494-09:
Displayed 10 items.
- ML20029D884 (← links)
- ML20080B555 (← links)
- 3F0598-08, Forwards Rev 0 to AES98033350-1-1, Operational Assessment SG Tube Degradation at Crystal River Unit 3. Results of Assessment Provide Reasonable Assurance That OTSG Tube Integrity Will Be Maintained During Current Operating Cycle (← links)
- 3F0897-09, Provides Response to Request for Addl Info Re TS Change Request Notice 211,Rev 0.Attachment a Provides List of Regulatory Commitments Made in Submittal (← links)
- 3F0199-04, LAR 243,Rev 0 to License DPR-72,requesting one-time Rev of ITS to Extend Insp Interval for OTSG Tubes to Coincide with Planned Operating Cycle.Rev 0 to Calculation M-99-0017 & Rev 0 to Calculation AES-C-3543-1 Encl (← links)
- 3F1295-03, Forwards Responses to NRC 951024 RAI Re TS Change Request 203 Concerning Small Vol Eddy Current Indication Disposition.Rept B51956-R1, Crystal River 3 8R/9R Bobbin Voltage (S/N) Growth Rate Calculations Also Encl (← links)
- 3F0595-05, TS Change Request (Tscrn) 203,Rev 0 to License DPR-72, Proposing Alternate Methodology for Dispositioning Small Vol OTSG Tube Eddy Current Indications.Proprietary Technical Rept Supporting Tscrn 203 Encl.Proprietary Rept Withheld (← links)
- 3F1194-10, Submits Preliminary Results of Refuel 9 OTSGs Tube Pull,Per Commitment in Response to 940426 Cal,Item 8.Preliminary Rept, Exam of Crystal River-3 Pulled SG Tubes Encl.Final Rept Will Be Provided by 950531 (← links)
- 3F0494-09, Forwards Refuel 9 Insp Plan for OTSGs & Documents That Serve as Technical Basis for Overall Disposition Strategy of Low signal-to-noises (← links)
- 3F0694-11, Requests non-withholding of Info from Public Disclosure Re Re Refuel 9 Insp Plan for OTSG (← links)