Pages that link to "13R-1"
← 13R-1
Jump to navigation
Jump to search
The following pages link to 13R-1:
Displayed 50 items.
- ML15259A049 (← links)
- ML15224B359 (← links)
- ML14230A757 (← links)
- ML14093A075 (← links)
- ML13238A154 (← links)
- ML13210A203 (← links)
- ML13017A349 (← links)
- ML13016A515 (← links)
- ML12319A255 (← links)
- ML12270A258 (← links)
- ML12128A007 (← links)
- ML11209B709 (← links)
- RS-15-236, Braidwood Station, Units 1 and 2 & Byron Station, Units 1 and 2 - Head Penetrations with Nozzles Having Pressure-Retaining Partial-Penetration J-Groove Welds (← links)
- ML102090135 (← links)
- ML092020390 (← links)
- ML091030192 (← links)
- ML082640007 (← links)
- ML081720451 (← links)
- ML070800741 (← links)
- RS-11-048, Additional Information Related to Byron Station Unit 1, Inservice Inspection Relief Request I3R-19: Alternative Requirements for the Repair of Reactor Vessel Head Penetrations (← links)
- BYRON 2016-0076, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R19) (← links)
- BYRON 2015-0152, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 4, (B1R20) (← links)
- ULNRC-06266, Response to Request for Additional Information, Third 10-Year Interval Inservice Inspection, Request for Relief No. 13R-11 (← links)
- NL-15-1754, Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 3.0 (← links)
- BYRON 2015-0009, 90-Day Inservice Inspection Report for Interval 3, Period 3, (B2R18) (← links)
- ULNRC-06152, Response to Request for Additional Information Round 2 Application for Amendment to Facility Operating License Revision to Final Safety Analysis Report Standard Plant Section 3.6 for High Density Polyethylene Pipe Crack Exclusion (← links)
- NL-14-1250, Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0 (← links)
- RS-11-065, Withdrawal of Alternative Requirements to NB-4450 on Seal Weld Repairs and Revision to Inservice Inspection Relief Request I3R-19: Alternative Requirements for the Repair of Reactor Vessel Head Penetrations (← links)
- RS-11-051, Additional Information Regarding Inservice Inspection Relief Request I3R-19: Alternative Requirements for the Repair of Reactor Vessel Head Penetrations (← links)
- BYRON 2010-0042, Submittal of 90-Day Inservice Inspection Report for Interval 3, Period 2, (B2R15) (← links)
- RS-16-163, Relief Request for Alternative Requirements for the Repair and Examination of Reactor Vessel Head Penetrations for the Fourth Inservice Inspection Interval (← links)
- RS-14-037, Response to Request for Additional Information Regarding Relief Request I3R-11 Associated with the Repair/Replacement of Control Rod Drive Mechanism (CRDM) Canopy Seal Welds (← links)
- RC-12-0154, Reactor Vessel Head Penetration Weld Repair Under WCAP-15987 (← links)
- RS-15-234, Revised Relief Request for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations (← links)
- RS-14-314, Requests for Relief for Alternate Examination Frequency Under ASME Code Case N-729-1 for Reactor Vessel Head Penetration Welds in Accordance with 10 CFR 50.55a(a)(3)(i) (← links)
- BYRON 2014-0078, Day Inservice Inspection Report for Interval 3, Period 3, (B1R19) (← links)
- BYRON 2013-0100, Day Inservice Inspection Report for Interval 3, Period 3, (B2R17) (← links)
- BVY 12-086, Inservice Inspection Program Relief Request ISI-PT-02, (Fourth ISI Program Interval) (← links)
- RC-12-0165, Relief Request RR-III-09 Alternative Weld Repair for Reactor Vessel Head Penetration (← links)
- RS-11-069, Third 10-Year Inservice Inspection Interval Requests for Relief for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations (← links)
- RS-17-072, Fourth 10-Year Interval Inservice Inspection Program Relief Requests (← links)
- RS-15-222, Response to Request for Additional Information Follow-up Clarification Regarding Relief Request 13R-14 (← links)
- GO2-07-141, Inservice Inspection Summary Report for Refueling Outage R-18 (← links)
- ULNRC-06043, Application for Amendment to Facility Operating License Npf -30 (LDCN 13-0016) Revision to FSAR Standard Plant Section 3.6 for Hdpe Crack Exclusion (← links)
- RS-15-318, Stations - Submittal of Relief Requests I3R-10, 1ISI-004, and 2ISI-013 Concerning Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements (← links)
- RS-15-158, Response to Request for Additional Information Regarding Relief Request I3R-14 (← links)
- RS-09-050, Requests for Relief for Alternate Examination Frequency Under ASME Code Case N-729-1 and from Requirements for Limited Examination of Reactor Vessel Head Penetration Welds in Accordance with 10 CFR 50.55a(a)(3)(i) (← links)
- ET 15-0009, CFR 50.55a Request 13R-12, Extension of the Third Inservice Inspection Program Interval to Perform Reactor Vessel Stud Hole Ligament Examinations (← links)
- ET 14-0026, Response to Request for Additional Information Regarding Request for Alternative 13R-1 1 (← links)
- ET 14-0019, 10 CFR 50.55a Request 13R-11 for the Third Inservice Inspection Program Interval (← links)